Corings 8/17/05'T" IN-"----,
IN IN'
ni 1 i
:a s .. Z.
S 7 �-c .l r_ JY..• �l .�� .
Client: City of Kalispell Public works Department Date: August 17, 2005
P.C. Box 1997 Page: 1 of 8
Kalispell, MT 59903-1997
Projects: 75 Glenwood,
Westview Business Center,
Report of: Coring of Concrete Sidewalks Stratford Village Phases 2 & 3,
Blue Heron Phases 1 & 2,
.Ashley Park Phase 6,
And Em ire Estates
On July 26, 2005, CMG Engineering, Inc. received instructions from Frank Castles with The Kalispell Department Of
Public works to perform concrete coring on sidewalks at 75 Glenwood, Westview Business Center, Stratford Village
Phases 2 & 3, Ashley Park Phase 6, Empire Estates, Glacier Village Greens Phases 17,19,20,& 21, Sunnyside Phase 2,
Leisure Heights Phases 1 & 2, and Blue Heron Phases .1 & 2, for the purpose of determining concrete thickness and base
material type and thickness. Cores were cut, and the holes were patched with concrete per the clients' instructions. Test
results are presented below. Results for Glacier Village Greens Phases 17,19,20,& 21, Sunnyside Phase 2, Leisure
Heights Phase I & 2 will be reported when completed.
75 Glenwood
l . Concrete Thickness: 4 1l2" Location: E. Sidewalk, 36N. Of S. end
Base Material Thickness: 7 1l4" of sidewalk.
Base Material: 3/4"" Minus Crushed
2. Concrete Thickness: 5" Location.: E. Sidewalk, 170' N. Of S. End
Base Material Thickness: 6 3/4" Of sidewalk.
Base Material: 3/4" Minus Crushed
Westview Business Center
1. Concrete Thickness: 5 1/2 F1 Location: S. Sidewalk, 3 5'E. Of W. End
Base Material Thickness: 6 1 /4" Of Sidewalk
Base Material: 3/4" Minus gushed
2. Concrete Thickness: 6 1/2" Location: Cul' de Sac sidewalk, 25' W. Of
Base Material Thickness: 6 ll2" Lot 4 & 5 boundary line.
Base Material: 3/4" Minus gushed
3. Concrete Thickness: 6 3l4" Location: N. Sidewalk, 20'W. Of Lot 2 & 3
Base Material Thickness: 4 3! 4" Boundary.
Base Material: 3/4" Minus gushed
Ashley Park Phase 5
1.
Concrete Thickness:
4" Location: N. Sidewalk, 2035 Teal Dr.
Base Material Thickness:
7"
Base Material:
318" Minus Pea Gravel
2.
Concrete Thickness:
7" Location: N. Sidewalk, 2021 Teal Dr.
Base Material Thickness:
o"
Base Material:
Native Soil
3.
Concrete Thickness:
5" Location: E. Sidewalk, 2101 Merganser Dr.
Base Material Thickness:
3 112"
Base Material:
Pit Run
4.
Concrete Thickness:
4" Location: W. Sidewalk, 2100 Eider Dr.
Base Material Thick
4 112"
Base Material:
314" Minus Crushed
5.
Concrete Thickness:
4 112" Location: S. Sidewalk, 87' E. Of corner
Base Material Thickness:
7" of Eider & Teal Dr.
Base Material:
314" Minus Crushed
Stratford V111a a Phase 2 & 3
1.
Concrete Thickness:
4" Location: E. Sidewalk, Corner of Stratford
Base Material Thickness:
o" & Teal Dr.
Base Material:
Native Soil
2.
Concrete Thickness:
4 112" Location: E. Sidewalk, 43 Stratford Dr.
Base Material Thickness:
2 112"
Base Material:
314" Minus Crushed
3.
Concrete Thickness:
3 314" Location: E. Sidewalk, 31 Stratford Dr.
Base Material Thickness:
2 114"
Base Material:
- 314" Minus Crushed
4.
Concrete Thickness:
3 3/4" Location: W. Sidewalk, 28 Stratford Dr.
Base Material Thickness:
3"
Base Material:
314" Minus Crushed
5.
Concrete Thickness:
3 314" Location: W. Sidewalk, 1983 Teal Dr.
Base Material Thickness:
5"
Base Material:
314" Minus Crushed
6.
Concrete Thickness:
4 314" Location: N.E. Sidewalk, 45' N.W. of corner
Base Material Thickness:
3 314" Of Stratford & Teal Dr.
Base Material:
314" Minus Crushed
7.
Concrete Thickness:
4" Location: N.E. Sidewalk, 1957 Teal Dr.
Base Material Thickness:
5 314"
Base Material:
314" Minus Crushed
Pg. 2 of 8
8.
Concrete Thickness:
4" Location: N.E. Sidewalk, 1947 Teal Dr.
Base Material Thickness:
4"
Base Material:
314" Minus gushed
9.
Concrete Thickness:
5" Location: S. Sidewalk, 14 Salem St.
Base Material Thickness:
4 314"
Base Material:
3/4" Minus Crushed
10.
Concrete Thickness:
3 112" Location: E. Sidewalk, 25 Stratford Dr.
Base Material Thickness:
4 112"
Base Material:
314" Minus Crushed
11.
Concrete Thickness:
4 3/4" Location: N. Sidewalk, 23 Salem St.
Base Material Thickness:
411
Base Material:
314" Minus Crushed
12.
Concrete Thickness:
4" Location: W. Sidewalk, 102' N. Of corner
Base Material Thickness:
3 112" Of Teal Dr. & Denver Ave.
Base Material:
3l4" Minus Crushed
13.
Concrete Thickness:
4 112" Location: N.E. Sidewalk, 1923 Teal Dr.
Base Material Thickness:
411
Base Material:
314" Minus Crushed
14.
Concrete Thickness:
4" Location: E. Sidewalk, 5 Salem St.
Base Material Thickness:
4 112"
Base Material:
314" Minus Crushed
15.
Concrete Thickness:
4" Location: S.W. Sidewalk, 1922 Teal Dr.
Base Material Thickness:
4 112"
Base Material:
314" Minus Crushed
16.
Concrete Thickness:
3 114" Location: S.W. Sidewalk, 1938 Teal Dr.
Base Material Thickness:
4 "
Base Material:
314" Minus Crushed
17.
Concrete Thickness:
3" Location: S.W. Sidewalk, 1958 Teal Dr.
Base Material Thickness:
G 112"
Base Material:
314" Minus Crushed
18.
Concrete Thickness:
4" Location: S.W. Sidewalk, 1978 Teal Dr.
Base Material Thickness:
511
Base Material:
Pit Run
19.
Concrete Thickness:
4" Location: S. Sidewalk, 1990 Teal Dr.
Base Material Thickness:
5 1f2"
Base Material:
Pit Run
Pg. 3 of 8
Blue Heron Phase 1 & 2
1.
Concrete Thickness:
4 112" Location: E. Sidewalk, 121 Bluecrest Dr.
Base Material Thickness:
5"
Base Material:
3/4" Minus Crushed
2.
Concrete Thickness:
3 3/4" Location: N. Sidewalk, 137 Bluecrest Dr.
Base Material Thickness:
4 ll2"
Base Material:
314" Minus Crushed
3.
Concrete Thickness:
2 1 /2" Location: E. Sidewalk, 141 Bluecrest Dr.
Base Material Thickness:
o"
Base Material:
Native Soil
4.
Concrete Thickness:
3 314" Location: N. Sidewalk, 161 Bluecrest Dr.
Base Material Thickness:
4"
Base Material:
Pit Run
5.
Concrete Thickness:
4 314" Location: S. Sidewalk, 215 Bluecrest Dr.
Base Material Thickness:
6 114"
Base Material:
314" Minus Crushed
6.
Concrete Thickness:
4 112" Location: W. Sidewalk, 18' S. Of Fire
Base Material Thickness:
6 114" Hydrant #0943
Base Material:
314" Minus Crushed
7.
Concrete Thickness:
4" Location: W. Sidewalk, 106 Bluecrest Dr.
Base Material Thickness:
5 114"
Base Material.:
314" Minus Crushed
8.
Concrete Thickness:
4 1 /4" Location: E. Sidewalk, 218 Bluecrest Dr.
Base Material Thickness:
o"
Base Material:
Native Soil
9.
Concrete Thickness:
4 1l4" Location: E. Sidewalk, 190 Bluecrest Dr.
Base Material Thickness:
6 114"
Base Material:
314" Minus Crushed
10.
Concrete Thickness:
4 314" Location: S. Sidewalk, 160 Bluecrest Dr.
Base Material Thickness:
6 114"
Base Material:
314" Minus Crushed
11.
Concrete Thickness:
4" Location: W. Sidewalk, 138 Bluecrest Dr.
Base Material Thickness:
5"
Base Material:
3/4" Minus Crushed
12.
Concrete Thickness:
5" Location: W. Sidewalk, 126 Bluecrest Dr.
Base Material Thickness:
6 114"
Base Material:
Pit Run
Pg. 4 of 8
2.
tj
4.
5.
A
7.
8.
a
11.
12.
Empire Estates
Concrete Thickness:
3 1 /2"
Location: E. Sidewalk, 167 Empire Loop
Base Material Thickness:
6 114"
Base Material:
Pit Run
Concrete Thickness:
3"
Location: S. Sidewalk, 57E of Fire Hydrant
Base Material Thickness:
6 114"
#0936
Base Material:
Pit Run
Concrete Thickness:
3 112"
Location: W. Sidewalk, 201'S. Of Fire
Base Material Thickness:
6"
Hydrant #0937
Base Material:
Pit Run
Concrete Thickness:
4"
Location: W. Sidewalk, 127 Empire Loop
Base Material Thickness:
6"
Base Material:
Pit Run
Concrete Thickness:
4"
Location: N. Sidewalk, 33'E. Of corner of
Base Material Thickness:
7"
Stillwater & Buffett
Base Material:
Pit Run
Concrete Thickness:
3 112"
Location: W. Sidewalk, 178 Empire Loop
Base Material Thickness:
6 112"
Base Material:
Pit Run
Concrete Thickness:
4 1141'
Location: W. Sidewalk, 164 Empire Loop
Base Material Thickness:
>6 314"
Base Material:
Pit Run
Concrete Thickness:
4"
Location: N. Sidewalk, 148 Empire Loop
Base Material Thickness:
>6"
Base Material:
314" Minus
Crushed
Concrete Thickness:
2 l f2"
Location: E. Sidewalk, 134 Empire Loop
Base Material Thickness:
>6"
Base Material:
314" Minus
Crushed
Concrete Thickness:
3 112"
Location: E. Sidewalk, 120 Empire Loop
Base Material Thickness:
>6"
Base Material:
3/4" Minus
Crushed
Concrete Thickness:
4"
Location: E. Sidewalk, 104 Empire Loop
Base Material Thickness:
>6"
Base Material:
314" Minus
Crushed
Concrete Thickness:
3 114"
Location: N. Sidewalk, 42' W. Of E. Coiner
Base Material Thickness:
>6"
Of Duke Dr. & Empire Loop.
Base Material:
Pit Run
Pg. 5 of 8
13.
Concrete Thickness:
4"
Location: N. Sidewalk, 63' E. Of W. corner
Base Material Thickness:
>61'
Of Duke Dr. & Empire Loop.
Base Material:
Pit Run
14.
Concrete Thickness:
4 112""
Location: E. Sidewalk, 69'S. Of W. Corner
Base Material Thickness:
>6"
Of Buffett Dr. & Empire Loop.
Base Material:
Pit Run
15.
Concrete Thickness:
3 3/4T'
Location: E. Sidewalk, 177 Empire Loop
Base Material Thickness:
>6"
Base Material:
Pit Run
16.
Concrete Thickness:
4 14"
Location: W. Sidewalk, 3 3'S, Of E. Corner
Base Material Thickness:
>6"
Of Buffett Dr. & Empire Loop.
Base Material:
Pit Run
17.
Concrete Thickness:
4 112"
Location: W. Sidewalk, 192 Empire Loop
Base Material Thickness:
>6"
Base Material:
314" Minus
Crushed
18.
Concrete Thickness:
4 1 /4'"
Location: W. Sidewalk, 206 Empire Loop
Base Material Thickness:
>6"
Base Material:
314" Minus
Crushed
19.
Concrete Thickness:
6 112'"
Location: W. Sidewalk, 220 Empire Loop
Base Material Thickness:
>6"
Base Material:
Pit Run
20.
Concrete Thickness:
4 114"
Location: W. Sidewalk, 224 Empire Loop
Base Material Thickness:
>6"
Base Material:
Pit Run
21.
Concrete Thickness:
4 ll4"
Location: W. Sidewalk, 90'N. Of corner
Base Material Thickness:
>6"
Of Vanderbuilt & Empire Loop.
Base Material:
314 " Minus
Crushed
22.
Concrete Thickness:
4 112"
Location: W. Sidewalk, at intersection
Base Material Thickness:
>6"
Of Rockefeller & Empire Loop
Base Material:
314" Minus
Crushed
23.
Concrete Thickness:
4"
Location: W. Sidewalk, 272 Empire Loop
Base Material Thickness:
>6"
Base Material:
314 " Minus
Crushed
24.
Concrete Thickness:
3 1 /2"
Location: S. Sidewalk, 129' W. Of electrical
Base Material Thickness:
>6"
Box # 19715, on Empire Loop
Base Material:
3/4" Minus
Crushed
Pg. 6 of 8
25.
Concrete Thickness:
3 1 /2" Location: W. Sidewalk, 48N. Of corner of
Base Material Thickness:
>611 3 Mile Dr. & Empire Loop.
Base Material:
Pit Run
26.
Concrete Thickness:
5" Location: N. Sidewalk, 287 Empire Loop
Base Material Thickness:
>611
Base Material:
3/4" Minus gushed
27.
Concrete Thickness:
4 1 /2'" Location: N. Sidewalk, 275 Empire Loop
Base Material Thickness:
>6"
Base Material:
3/4" Minus gushed
28.
Concrete Thickness:
4 1/2" Location: S. Sidewalk, 6 Rockefeller Way
Base Material Thickness:
>61'
Base Material:
3/4" Minus gushed
29.
Concrete Thickness:
4 1/4" Location: E. Sidewalk, 88' N. Of corner of
Base Material Thickness:
>6" Rockefeller Way & Empire Loop.
Base Material:
3/4" Minus gushed
30.
Concrete Thickness:
4" Location: N. Sidewalk., 11 Vanderbuilt Dr.
Base Material Thickness:
o"'
Base Material:
Native Soil
31.
Concrete Thickness:
4 3/4" Location: S. Sidewalk, corner of Carnegie
Base Material Thickness:
>61' & Empire Loop
Base Material:
3/4" Minus gushed
32.
Concrete Thickness:
4 1/2"' Location: N. Sidewalk, 36' E. of corner of
Base Material Thickness:
>6" Carnegie & Empire Loop
Base Material:
3/4" Minus Crushed
33.
Concrete Thickness:
4" Location: S. Sidewalk, to trump Dr.
Base Material. Thickness:
>611
Base Material:
3/4" Minus Crushed
34.
Concrete Thickness:
41" Location: S. Sidewalk, 22 Trump Dr.
Base Material Thickness:
�5r"
Base Material:
3/4" Minus Crushed
35.
Concrete Thickness:
4 1 /4" Location: E. Sidewalk, 74 Empire Loop
Base Material Thickness:
>61"
Base Material:
3/4" Minus Crushed
36.
Concrete Thickness:
4 1/2 if Location: E. Sidewalk, 88 Empire Loop
Base Material Thickness:
>61'
Base Material:
3/4" Minus Crushed
Pg. 7 of 8
3 7.
Concrete Thickness:
5 1 J 2" Location: W. Sidewalk, 21' W. Of Fire
Base Material Thickness:
1" Hydrant #0939, ( Empire Loop)
Base Material:
314" Minus Crushed
38.
Concrete Thickness:
4" Location: S. Sidewalk, 10 Duke Dr.
Base Material Thickness:
411
Base Material:
314" Minus Crushed
39.
Concrete Thickness:
4 112" Location: E. Sidewalk, 209 Empire Loop
Base Material Thickness:
>6"
Base Material:
314" Minus Crushed
40.
Concrete Thickness:
4 114►' Location: N. Sidewalk, 25 Ford Way
Base Material Thickness:
>6"
Base Material:
314" Minus Crushed
41.
Concrete Thickness:
4" Location: S. Sidewalk, 30 Ford Way
Base Material Thickness:
>6"
Base Material:
314" Minus Crushed
42.
Concrete Thickness:
4 114" Location: S. Sidewalk, 6 Ford Way
Base Material Thickness:
>611
Base Material:
314" Minus Crushed
43.
Concrete Thickness:
5 112" Location: E. Sidewalk, 100'S. Of corner of
Base Material Thickness:
>6" Ford Way & Empire Loop
Base Material:
314" Minus Crushed
44.
Concrete Thickness:
4" Location: N. Sidewalk, 29 Trump Dr.
Base Material Thickness:
>6"
Base Material:
3/4" Minus Crushed
45.
Concrete Thickness:
4 114" Location: N. Sidewalk, 39 Trump Dr.
Base Material Thickness:
>6"
Base Material:
314" Minus Crushed
* The sidewalk at 1946 Teal Dr. in the Stratford Village Subdivision, has a settlement issue,
apparently due to insufficient compaction of an electrical utility trench under that section of
sidewalk.
REVIEWED BY: