Loading...
E5. Postpone Bid Award - WSI 4-5201 1 sr Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 www.kalispell.com 1public_works MEMORANDUM Date: May 1, 2018 TO: Doug Russell — City Manager W- CC: Susie Turner, PE — Public Works Director FROM: Keith Haskins, PE — City Engineer SUBJECT: Westside Interceptor Project — Schedules 4 & 5 Postpone Bid Action MEETING: May 7, 2018 BACKGROUND: Schedule 4 of the Westside Interceptor Project (WSI) includes the installation of approximately 4,000 linear feet of 27 inch sewer main, approximately 8,200 linear feet of 24 inch sewer main, and approximately 2,600 linear feet of 21 inch sewer main. Also included in this schedule are sanitary sewer manholes, sanitary sewer main / service connections, paved surface restoration, concrete restoration, and landscape restoration. Schedule 5 of the WSI includes approximately 4,550 linear feet of 10 inch force main to be installed by standard trenching methods and approximately 1,500 linear feet of 10 inch force main to be installed via horizontal directional drill installations. Also included in this schedule are sanitary sewer force main connections, paved surface restoration, concrete restoration, and landscape restoration. ACTION REQUESTED: Postpone action for Schedules 4 and 5 of the Westside Interceptor Project until the May 21, 2018 City Council Meeting.