Loading...
E3. Milling and Paving201 l s` Avenue East PO Box 1997 Kalispell, MT 59903 I Phone:406-758-7720 PUBLIC WORK 'ENT -% Fax: 406-758-7831 www.kalispell.com /public —works MEMORANDUM Date: April 11, 2018 TO: Doug Russell, City Manager T FROM: Keith Haskins, PE — City Engineer CC: Susie Turner, PE — Public Works Director SUBJECT: 2018 Milling and Paving Bid Award MEETING: April 16, 2018 BACKGROUND: Public Works will be utilizing contractors to support mill and paving projects through the City, partially due to an increase in revenue from the Bridge and Road Safety and Accountability Act (BaRSAA — H13473). The 2018 Milling and Paving bid provides competitively bid contractor unit prices for milling and overlay maintenance projects. Based on budgeted and available funds, the Public Works Department will use the contractor unit bid prices to develop and issue Work Orders for work to be completed by the selected contractor. Bids were received and opened on April 11, 2018 at 10:00 am. Bid bonds and references were examined. Responsive Bidders were: Knife River Corporation and LHC, Inc. To evaluate the bids, unit prices were compared using scenarios based on a potential mill and pavement project. LHC was determined to have the most cost effective bid in every scenario examined. STAFF RECOMMENDATIONS: Award the contract for the 2018 Milling and Paving project to LHC, Inc. FISCAL EFFECTS: Work orders for the 2018 Milling and Paving project are budgeted and will be funded through the following sources: 1. Special Street Maintenance Fund: "Pavement Repairs — Pavement Maintenance" line item (2500-421-430244-354). 2. BaRSAA Fund: "Pavement Maintenance" line item (2421-421-430240-354) 3. Gas Tax Fund: "Overlay and Chip Seals" line item (2420-421-430240-368) ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: 1. Certified Bid Tabulation 2. Bid Evaluation based on potential project in Village Greens. Q � = -O .,C C DJ Q m D rD — CO O y C 0 ro O c z is O CO O as 0 N z m n En rn a m rD w w v m Ln 41 w N Y ,_r (D 3 Cr D m ?r n rt _. O O lD G N !D rD -,% rD cr 3 D* m Q Q o0 oa N C. rt M ov ao CrD ro 0) rr ty O < ,.;�; � ;,,' Cr m O �.o N eD < C m sz It- It m ro Y C3 rD Q m ? 0-70 m =- a z CO C)G V> C V! N O V� IA tV 00 r=r O N O V� Y Y Vs Vl V> iJr O O 0 0 0 0 0 0 rDm 0 C) o O Vs m x+ a V)- N O 7 rt O P O W W Y Y 0 0 0 3 O J O (n O to P. 0 0 00 O cocoa O V? C .). w V? V? Y O -+ Y i✓> In i/t ih V1 V} tO O O W 00 O O O O N O O A C7 t.O A tD .p O O n rn O N O Y L n Y to O O �D = f'1 t!� W x n i 11 V? Y p rD 1� i^ In V} V> tn. 4j1 tD O O O W A 00 O O tO O 4.i O tD O p N 0 O 0 0 O N 0 N to Y (n 0 0 2018 Milling and Paving Bid Evaluation Typical Project Selected for Analysis: Village Greens Description Length Width Blocks Paving Milling Pre -level Util. Adj. FT FT 330'/BLK SY TON SY TON EA Palmer Drive - Evergreen Drive to Ritzman 1,782 28 5.40 5,544.00 602.91 2,772 90 5 West Nicklaus - Palmer to End 5,254 28 15.92 16,346.00 1,777.63 8,173 267 22 East Nicklaus- Palmer to Corner 1,308 28 3.96 4,069,00 442.50 2,035 66 4 Zs,y_Ny Z,8Z3 1Z,980 423 31 Assumptions: 1. Milling machine is 7' wide. Milling would be one pass on each side of street to build crown. Tapered mill is 2" at curb and 0" at 7' from curb (measured as 1" depth for item). 2. Full depth mill would be 2" deep for full width. 3. Tonnage is based off of estimated installed unit weight of 145 lb/cf. Pre -level is estimated at 15% of total tonnage. Tapered Mill with City Haul - City to Overlav Knife River Corp. LHC, Inc. ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL UNIT COST TOTAL 1 Mobilize/Demobilize LS 1 $ 28,100.00 $ 28,100.00 $ 3,000.00 $ 3,000.00 2 Construction Traffic Control Block 1 25 $ 2,000.00 $ 50,000.00 $ 192.00 $ 4,800.00 3 Tapered Milling (With City Haul) per 1" depth SY 1 12,980 $ 3.00 $ 38,940.00 $ 0.45 $ 5,841.00 5117,040.00 5 13,641.00 Full Depth Mill with City Haul - City to Overlay Knife River Corp. LHC, Inc. ITEM DESCRIPTION UNIT QUANTITY UNITCOST TOTAL UNITCOST_r TOTAL 1 Mobilize/Demobilize LS 1 $ 28,100.00 $ 28,100.00 $ 3,000.00 $ 3,000.00 2 Construction Traffic Control Block 25 $ 2,000.00 $ 50,000.00 $ 192.00 $ 4,800.06 3 Milling (With City Haul) per 1" depth SY 51,918 $ 1.40 $ 72,685.20 $ 0.45 $ 23,363.10 > 1su,785.Zu 5 31,163.10 Tapered Mill with Contractor Haul - Contractor to Overlav Knife River Corp. LHC, Inc. ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL UNIT COST TOTAL 1 Mobilize/Demobilize LS 1 $ 28,100.00 $ 28,100.00 $ 3,000.00 $ 3,000.00 2 Construction Traffic Control Block 25 $ 2,000.00 $ 50,000.00 $ 192.00 $ 4,800.00 3 Tapered Milling (Without City Haul) per 1" depth SY 12,980 $ 3.50 $ 45,430.00 $ 0.91 $ 11,811.80 4 Pre -level Paving TON 423 $ 110.00 $ 46,530,00 $ 58.00 $ 24,534.00 5 Asphalt Concrete Pavement per 1" depth SY 51,918 $ 4.70 $ 244,014.60 1 $ 3.42 $ 177,559.56 6 Utility Adjustment EA 31 $ 200.00 1 $ 6,200.00 $ 10.00 $ 310.00 4Z0,174.b0 $ 222,01S.36 Full Depth Mill with Contractor Haul - Contractor to Overlay Knife River Corp. LHC, Inc. ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL UNIT COST TOTAL 1 Mobilize/Demobilize LS 1 $ 28,100.00 $ 28,100.00 $ 3,000.00 $ 3,000.00 2 Construction Traffic Control Block 25 $ 2,000.00 $ 50,000.00 $ 192.00 $ 4,800.00 3 Milling (Without City Haul) per 1" depth SY 25,959 $ 1.90 $ 49,322.10 $ 0.91 $ 23,622.69 4 Pre -level Paving TON 423 $ 110.00 $ 46,530.00 $ 58.00 $ 24,534.00 5 JAsphalt Concrete Pavement per 1" depth SY 51,918 $ 4.70 $ 244,014.60 $ 3.42 $ 177,559.56 6 JUtility Adjustment EA 31 $ 200.00 $ 6,200.00 $ 10.00 $ 310.00 5 4Z4,166.70 5 233,826.2S