07-24-08 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, July 24, 2008 Lower Level Main Conference Room 201 First Avenue East ATTENDING: Frank Castles, Asst. City Engineer Jeff Clawson, Building Official Sean Conrad, City Planner Chad Fincher, Parks Superintendent F. Ray Ruffatto, Deputy Fire Marshal P. J. Sorensen, Zoning Administrator, Chair Kathy Kuhlin, Recording Secretary Guests: James Freyholtz, M.D.O.T. and Jim Atkinson, Flathead County Agency on Aging Hear the Public: None. Performance Bond Reminders: None. OLD BUSINESS: DNRC / DEQ — Spring Prairie; new office building — Still going forward on the plat. Need to resolve the issue with water rights. Steve Lorch from DNRC would like to do an SID to cover round -about costs. Frank said no. Sent the architect a letter in terms of the site and to keep working with the Fire Department. They have their water flow information. Grading and drainage with Public Works. Light fixture — we needed to have the plat done. Status quo. Spring Creek Apartments —10 Appleway Dr; new apartments — behind the Hampton Inn — PJ sent them a letter. Getting close on the flood plain permit. Gave us a copy of their 310 permit. They made an error on their setbacks. They are going to lose three units to the north of the four southerly units that are parallel to Appleway Drive. City is negotiating to get a 20' easement to redirect the water flow from Spring Creek at the north east corner of the property. Flood plain issues were discussed. They also need to clarify some things with the carports. If they try to get a C of O and there is no landscaping, they will need a bond. Eagle Transit does not need a bus turn out area, but may need a stop area in the future. The sidewalk that is offset near the fire hydrant near the southwest corner of the property is encroaching off of the right-of-way onto the public right-of-way. They need to talk with Paul about the bike path. We need the revised drainage plans from Billmayer. Revised plans should be in shortly. NEW BUSINESS: None. PLANNING OFFICE ITEMS: None. OTHER REPORTS: Pre -Application — On Highway 2 just west of town, existing warehouse on property. Bring into the City. This would be a subdivision, making four units on the south end. Highway Department is building a frontage road. Will keep the warehouse. They will have to extend the water and sewer out to this site. The road is in excess of 150' in length. This will be a public road and will have to have a cul-de-sac or modified hammerhead. The extension ofthe water and sewer may be a problem. Entrance corridor. May be a B-2 and south end will be I-1. Recommend they make the lots longer and deeper. Maybe request a frontage road to be paid by each lot owner for the future. The meeting was adjourned at 10:30 a.m.