07-31-08 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, July 31, 2008 Lower Level Main Conference Room 201 First Avenue East ATTENDING: Frank Castles, Asst. City Engineer Dwain Elkins, Plans Examiner Nicole Johnson, City Planner P. J. Sorensen, Zoning Administrator, Chair Kathy Kuhlin, Recording Secretary Sean Conrad, City Planner Charlie Johnson, Construction Manager F. Ray Ruffatto, Deputy Fire Marshal Susie Turner, Assoc. Civil Engineer Guests: James Freyholz, M.D.0.T.; Tim Howard, Howard Construction; Josiah Bramante, J. B. Building, Tim German, Springcreek; and Darc Benniger, Springcreek. Hear the Public: None. Performance Bond Reminders: None. OLD BUSINESS: DNRC / DEQ — Spring Prairie; new office building — They haven't done anything on their subdivision. They will need a separate application for the 911 center. They will need a latecomer's agreement for the sewer portion. This is a preliminary project. We need a number of approvals from various city departments. Spring Creek Apartments — 10 Appleway Dr; new apartments — They have adjusted the setbacks. Some adjustments in their parking layout. The flood plain permit is almost ready to issue. They will need to revise their FEMA application from a CLOMR-F to a LOMR-F to meet their timing requirements. Floodplain permit will include a condition that they secure the letter of map revision from FEMA. Drainage and some ROW improvement details are pending. They are working with Paul on the bike path -- it won't fit on the back and decided to drop it pending discussion with Paul. Culvert easement is shown as 15', but Public Works has asked for a 20' easement. Fred will get this going. Sprinkler contractor is providing a single fire department connection, but Ray isn't sure if that will work. Usually, they would be required to have one for each building. They could possibly have them mounted in the front of the building. Ray would prefer they have one for each building. They will meet with Ray on this. Addressing will also be discussed with Fred in Public Works and Jeff in Building. The travel distances have been taken care of. They can start placing the fill once their flood plain permit is issued. NEW BUSINESS: None. PLANNING OFFICE ITEMS: None. OTHER REPORTS: Montana Stone Gallery — is going into the old Glacier Gym — upgrades will be addressed. Moving away from some points. Sidewalk will be taken care of. They will need to talk with Chad about putting a tree in the circular mark. The sidewalk on Main Street is heaving up and will need to be replaced. They City wants the driveway approach to go away. Mednorth — Urgent Care Clinic. This project will be going in in front of Costco and next to Grease Monkey with a shared access. They claim to have worked out their view corridor issues with the developer. Susie needs to see their construction plans to verify that they are hooking in correctly to the sewer. The building will be sprinklered. Alpine Lighting — The Fire Department and Building issues regarding their upstairs ballroom still need to be worked out. Information was submitted to Tom in order to keep everyone in the loop. The meeting was adjourned at 10:30 a.m.