Loading...
Diamond Ridge Estates SIA1^ Return to: Theresa White Kalispell City Clerk P.U. Box 1997 Kalispell, MT 59903 F,;,==sooD3 Paula Robinson, Flathead County MT by NC 2/20/1008 9:93 AM SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this A Z day of *NuLWj200 5' , by and between the CITY COUNCIL, CITY OF KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and DIAMOND RIDGE ESTATES, LLC, ALLEN RIEBE, MANAGING MEMBER, located at 394 Three Mile Drive, Kalispell, MT 59901., Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as DIAMOND RIDGE ESTATES located in the NW 114 NW 114 Section 12, T.28N., R.22W. Flathead County, Montana and, WHEREAS, the City has conditioned its approval of the final plat of DIAMOND RIDGE ESTATES, Pon the conditions as set forth in the Preliminary Plat of the Subdivision being completed and all mprovements, as cited 1n "Exhibit A" have not been completed at this time, and the Developer wishes o bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial ecurity of 125% of the estimated total cost of construction of said improvements as evidenced by an stimate nrenared by a licensed public engineer included herewith as "Exhibit B"; and REAS, the estimated total cost of construction of said improvements is the sum of $10,600.00. OW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the ity, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $13,250.00. Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $ 13,250.00, which is the estimated cost of completing the required improvements in DIAMOND RIDGE ESTATES plus an additional 25% of the estimated construction costs to cover administrative costs. b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limit of credit stated in the letter; 2. That said required improvements shall be fully completed by October 31, 2008. 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement .Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. 1111lIII Feee°ss=oa°' Paula Robinson, Flathead county MT by NC 2/20/200e 9:43 am 11111111111111im oase°3o�=403 Paula aonin, Flathead County Mr by NC z/2o/iooe s:ai nn EXHIBIT "B" CERTIFICATION OF WORK TO BE COMPLETED DIAMOND RIDGE ESTATES KARA DRIVE COMPLETED TO DATE January 10, 2008 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED 101 Clearing & Grubbing AC. 1.5 $ 4,400.00 $ 6,600.00 1.5 $6,600.00 102 Unclassified Excavation (Estimate of3800C.Y - (includes Roadway, Bike Path, and Detention Pond LUMP 1 $ 21,000.00 $ 21,000.00 1 $21,000.00 103 9" of 3" - Pit Run Gravel C.Y. 1,140 $ 24.50 $ 27,930.00 1,140 $27,930.00 104 6" of 314" Crushed Gravel S.F. 41,005 $ 0.50 $ 20,502.50 41,005 $20, 502.50 105 Hot Plant Mix Ash alt 4" - 2 Lifts S.F. 33800 $ 1.30 $ 43,940.00 33,800 $43,940.00 106 Remove Existing Curb & Gutter L.F. 100 $ 16.00 $ 1,600.00 100 $1,600.00 107 Concrete Curb and Gutter L.F. 2,412 $ 16.00 $ 38,592.00 2,412 $38,592.00 108 5' Concrete Sidewalk on 6" Prepared Base L.F. 2680 $ 26.50 $ 71,020.00 2680 $71,020.00 109 Concrete Handicap Accessible Rams EA. 4 $ 230.00 $ 920-00 4 $920.00 110 10'As halt Bike Path on 8" Preared Base L.F. 500 $ 22.15 $ 11,075.00 500 $11,075.00 111 Topsoil (3" Depth) in Boulevards & Embankments C.Y. 320 $ 15.25 $ 4,880.00 320 $4,880.00 112 Street Sign and Placement EA. 1 $ 570.00 $ 570.00 1 $570.00 113 H droseedin Seed & Mulch Boulevards AC. 0.8 $ 3,000.00 $ 2,400.00 0.8 $2,400.00 114 Mail Box Slab EA. 1 $ 1,100.00 $ 1,100.00 1 $1,100.00 115 All Weather Access Strip L.F. 190 $ 47.75 $ 9,072.50 190 $9,072.50 116 Boulevard Trees EA. 40 $ 300.00 $ 12,000.00 15 $4.500.00 SUBTOTAL ITEMS 101.116 1 1 $ 273,202.00 1 $ 265,702.00 WATER SYSTEM Item No. Description Unit Measure Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED 201 8" Water Main - AWWA C900, Class 150 L.F. 1,648 $ 27.50 $ 45,320.00 1648 $45,320.00 202 8" Gate Valves & Boxes EA. 3 $ 1,500.00 $ 4,500.00 3 $4,500.00 203 8" Misc. DI Fittings EA. 18 $ 750.00 $ 13,500.00 18 $13,500.00 204 Fire Hydrants EA. 3 $ 5,250.00 $ 15,750.00 3 $15,750.00 205 1" Water Services EA. 23 $ 800.00 $ 18,400.00 22 $17,600.00 SUBTOTAL ITEMS 201-205 $ 97,470.001 1 $ 96,670.00 SEWER SYSTEM Item No. Descri tion Unit Measure Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED 301 8" Sewer Main PVC SDR 35 L.F. 1,465 $ 27.50 $ 40,287.50 1,465 $40,287.50 302 ,V Diam. Manholes w/ Ring & Cover EA. 14 $ 1,750.00 $ 24,500.00 14 $24,500.00 303 Drop Connection at Manhole EA. 2 $ 750.00 $ 1,500.00 2 $1,500.00 304 Connect to Existing Manhole & Raise Rim Elevation EA. 1 $ 850.00 $ 850.00 1 $850.00 305 4" PVC Sewer Services EA. 19 $ 750.00 $ 14,250.00 19 $14,250.00 306 Pressure Sewer Services EA. 4 $ 1,000.00 $ 4,000.00 4 $4,000.00 SUBTOTAL ITEMS 301 - 306 $ 85,387.50 $ 85,387.50 DRAINAGE & MISCELLANEOUS WORK Item No. Description Unit Measure Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED -A401- Catch -Basins w1 Castings - EA. _- - -6_ - - - $- _ - 825.00 $- - - - - 41950:00 _ _ 6 - $4-,950.00 A402 Drain Basins w! Castings EA. 5 $ 825.00 $ 4,125.00 5 $4,125.00 A403 4' Diam. Storm Manholes wl-Ring & Cover EA. 5 $ 1,750.00 $ 8,750.00 5 $8,750.00 A404 12" Storm Sewer Main L.F. 366 $ 28.00 $ 10,248.00 366 $10,248.00 A405 8" Storm Sewer Main L.F. 137 $ 26.00 $ 3,562.00 137 $3,562.00 A406 6" Storm Sewer Main L.F. 384 $ 24.00 $ 9,216.00 394 $9,216.00 A407 Storm Tech SC-740 Chambers L.F. 281 $ 80.00 $ 22,480.00 281 $22,480.00 A408 4" - 6" Rip Rap Outlet Protection C.Y. 2 $ 50-00 $ 100.00 2 $100.00 A409 Place 3" To soil Ponds and Drainage Swales C.Y. 65 $ 25.00 $ 1,625.00 65 $1,625.00 A410 Drainage Swales L.F. 300 $ 15.00 $ 4,500.00 300 $4,500.00 A411 H droseed Pond and Swales AC. 0.2 $ 3,000.00 $ 600.00 0.2 $600.00 A412 12" CMP L.F. 70 $ 25.00 $ 1,750.00 70 $1,750.00 A413 Detention Pond Fence L.F. 230 $ 5.00 $ 1,150.00 0 $0.00 SUBTOTAL ITEMS A401 - A413 i $ 73,056.00 $ 71,906.00 Fees:2008000044 $ss.o03 Paula Robinson, Flathead County MT by NC 2/10/200e 9:43 nw UTILITIES - TRENCHING, CONDUIT & VAULTS COMPLETED TO DATE January 10, 2008 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED 501 Common Utility Trench wt Bedding L.F. 2,000 $ 4.50 $ 9,000.00 2,000 $9,000.00 502 1" Street Li ht Conduit wJ Pull Rae L.F. 140 $ 1.50 $ 210.00 140 $210.00 503 2" Conduit wl Pull Rae L.F. 3,000 $ 3.00 $ 9,000.00 3,000 $9,000.00 504 3" Conduit w/ Pull Rae L.F. 4,400 $ 4.00 $ 17,600.00 4,400 $17,600.00 505 V Conduit for Gas Sleeve L.F. 210 $ 5.00 $ 1,050.00 210 $1,050.00 506 Li ht Bases Standard FEC EA. 5 $ 700.00 $ 3,500,00 5 $3,500.00 507 1 Phase Transformer Vault EA. 4 $ 750.00 $ 3,000.00 4 $3,000.00 508 Set Secondary Service Pedestals EA. 10 $ 100.00 $ 1,000.00 10 $1,000.00 509 Bore Utilities Under Three Mile Drive 0.3" PVC Conduit and 2.2" PVC Conduit] L.S. 1 $ 2,000.00 $ 2,000.00 1 $2,000.00 SUBTOTAL ITEMS 501-509 $ 46,360.00 $ 46,360.00 PPr7F1=-qRIr)NA1 A I ITII ITV -CZ1=RVIr 1= r'_[IQTC Item No. Description Unit Measure Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL COST COMPLETED 601 Construction Engineering 1 Inspection LUMP SUM 1 $ 35,000.00 $ 35.000.00 980/0 $34,300.00 602 Legal Surveying LUMP SUM 1 $ 15,000.00 $ 15,000.00 97% $14,550.00 603 Flathead Electric LUMP SUM 1 $ 23,587.00 $ 23,587.00 100% $23,587.00 604 Northwest Energy LUMP SUM 1 $ 11,497.00 $ 11,497.00 100% $11,497.00 05 Centu el LUMP SUM 1 $ 13,885.68 $ 13,885.68 100% $13,885.68 fft SUBTOTAL ITEMS 601-605 $ 98,969.68 $97,819.68 TOTAL PROJECT BUDGET ORIGINAL TOTAL ESTIMATED COST OF CONSTRUCTION AMOUNT COMPLETED PRIOR TO BONDING AMOUNT OF REMAINING WORT[ PRIOR TO BONDING AMOUNT OF BOND (125% OF REMAINING WORK) AMOUNT OF WORK COMPLETED TO DATE PERCENTAGE OF WORK COMPLETED TO DATE AMOUNT OF WORK REMAINING ORIGINAL BOND AMOUNT AMOUNT OF BOND TO BE RETAINED (125% OF REMAINING WORK) BOND AMOUNT TO BE RELEASED AMOUNT PREVIOUSLY RELEASED AMOUNT TO BE RELEASED AT THIS TIME AS PROJECT ENGINEER FOR DIAMOND RIDGE ESTATES, I CERTIFY THAT THE WORK LISTED HEREIN IS CORRECT. IN ADDITION, I CERTIFY THAT THE ASSOCIATED COSTS ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE IS ESTIMATED TO BE: THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: SECURITY HELD AT 125% OF THE REMAINING COSTS SHOULD BE IN THE AMOUNT OF: THEREFORE, IT IS iN ACCORDANCE WITH THE SUBDIVISION IMPROVEMENTS AGREEMENT TO REDUCE THE TOTAL AMOUNT OF THE SECURITY HELD BY: $0.00 ROD SCHENCK, P.E. 1 $ 674,445.78 1 1 $ 663,845.18 $ 674,445.18 $ 663,845.18 $ 10,600.00 $ 13,250.00 $ 663,845.18 98.4°Io $ 10,600.00 $ 663,845.18 $ 10,600.00 $ 13,250.00 ALL WORK TO BE COMPLETE❑ BY OCTOBER 31, 2008 IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein b e fore written. ALLEN RIEB E, MANAGING MEMBER DIAMOND RIDGE ESTATES, LLC STATE OF MONTANA SS. County of Flathead ) This instrument was acknowledged before me on �. , , ] 0 , 200 , by Allen Riebe. Printed Name Dee, F� cA~-► SEAL Notary Public for the State of Montana Residing at4�A ---- My Commission Expires no.ajj 16ro 310 OR, CITY OF KALISPELL ATTEST: AYOR C��o2ecw KAG r iCORPORATFIO SEAL OA40NTANA • ■ 1892 II� II II' II� II� I� II IIQ IIp IIY I I IIu IIuI YI III II Page: of 5403 Robinson, Flathead coon Fees: g55.00 Paula Robinso ry nr by xc a/zo(zooe e:as AM