Loading...
12-20-07 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, December 20, 2007 Kalispell Planning Office Conference Room ATTENDING: Paul Burnham, Assoc. Civil Engineer Jeff Clawson, Plans Examiner Mark Crowley, Construction Manager Tom Jentz, Planning Director P. J. Sorensen, Zoning Administrator, Chair Kathy Kuhlin, Recording Secretary Guests: James Freyholtz, M.D.O.T. Hear the Public: None. Frank Castles, Asst. City Engineer Sean Conrad, City Planner Chad Fincher, Parks Superintendent F. Ray Ruffatto, Deputy Fire Marshal Performance Bond Reminders: Butch Clark SIA, Lot 6, Block 251 on Third. Receive SIA for Diamond Ridge. Lone Pine expires at the end of this month and may be extended. OLD BUSINESS: Hilton — Dropped off agenda until January. Neal Dental Office — 135 Commons Loop; new dental office — the building sits on a slope with parking lot at bottom with de facto alley that goes through there. Not sure if there is enough room for fire turn around. Main parking lot is on top. Some parking spots may be a problem. Need to make the site work at the driveway to City standards at consistent grade and not with ADA dome. Utility Plan information is in. Have also included landscape information. There is a drainage swale next to it. Ray met with their architects on this program and they plan to sprinkler the building. He will look at the access on the lower area. NEW BUSINESS: None. PLANNING OFFICE ITEMS: Ashley Heights Subdivision — south of Sunnyside. Turners' project. Highway bypass is going along the west side of the subdivision. Earth berm for majority of the lots and a 6 to 7 foot wall. Two to one slope on both sides of earth berm on each lot. Paul stated it should be 3 to 1 to get a mower on it. Drainage is also a consideration. The bike path should be located west of the proposed berm. The south wall is west of this. Berm would be on the east side of the wall. A 10' bike path would be through the development along the road. Discussion was held. The berm should be in the homeowners' area, not in individual lots. Three to one and sound mitigation in a common area, and shift berm on MMOT ROW and try to get the bike path on the east side. Sean will prepare a letter to the Turners. Chad wants to be sure that open space funding is included in the park maintenance district so if Parks ends up taping care of this, they will have a funding source. OTHER REPORTS: Flathead Industries — old Sportsman's building — 45 degree angle parking. They need to lose one more parking space, and get an 8-1/2' easement. Trash compactor and guard rail are proposed — may have some problems. Truck access and loading area on their property. If there is a truck well, they will need to fence it from the driveway cut to the property line with a 4' rail distance. Public Works is okay with this sidewalk in front on the northeast of the property and extended down to the public sidewalk. The meeting was adjourned at 10:40 a.m. cc: Police City Manager FCAOA MDOT Bldg Fire City Clerk City Airport Planning Parks Comm. Dev. Public Works