04-17-08 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, April 17, 2008 Lower Level Main Conference Room 201 First Avenue East ATTENDING: Sean Conrad, City Planner Gary Hoes, Fire Inspector Charlie Johnson, Construction Manager P. J. Sorensen, Zoning Administrator, Chair Charlie Johnson, Construction Manager Paul Burnham, Assoc. Civil Engineer Susie Turner, Assoc. Civil Engineer Nicole Johnson, City Planner Frank Castles, Asst. City Engineer Guests: James Freyholz (MDOT); Randy Davis, Toby Macintosh, Michael Jackola Hear the Public: None. Performance Bond Reminders: Nothing until June. PJ mentioned Trinity Youth Center OLD BUSINESS: Kohl's / Spring Prairie Phase 3 — Hwy 93 N; overall site layout and new retail store — There are 17 conditions of approval. Public Works would like a copy to ensure they are complied with. Working on foot candle compliance and they still need to submit a landscaping plan which also will need to be approved. There are issues with access to the bike path, BPA easement and grading. The project will stay on the agenda and be reviewed for progress next week. Four Cays — 145 Commons Loop; new office building — Toby Macintosh indicated he still needed to coordinate with Susie on Stormwater. Michael Jackola said the SWPPP will be submitted when the contractor is awarded the contract to do the job. No digging will be allowed until that is submitted and approved. They are working on the site infrastructure at this stage. The handicap parking spaces have shifted. Public works comment — the trash enclosure needs to be relocated to ensure neighbor fencing doesn't block access. There are no building plans. Incomplete lighting plan — there will be no building plan approval without that component. Also minor grade change on concrete stairs on north side of building. Toby will talk with Chad Fincher about boulevard landscaping improvements. Project to be discussed next week. Hutton Ranch Pad "D" - new retail building — strip retail. PJ has talked to Lyle Sheets about the lighting plan, parking and cross easements which need correction. PW mentioned an erosion plan would need to be submitted with the building permit. The departments signed off on the project for Site Review. TD&H Office Building — 35 Three Mile Drive; new office building — The TD&H office at 35 Three Mile Drive is being designed by architect Bryan Schutt. Public Works reviewed the plans and need to discuss a few items with him before proceeding. The discussion included recommendations for the driveway approach, sidewalk transition, grading and site drainage issues. Public Works will discuss with Bryan to ensure the driveway approach for the new office meets city standards including curb, gutter, sidewalk, boulevard, etc. The sidewalk that is adjacent to the street needs be transitioned to provide a 5-foot boulevard within the ROW. Flow lines seem to be at different grades and will not function correctly. The east/west pipe needs to be adjusted to proper grades and the man hole should be raised to grade and should be graded to drain away from the manhole. Charlie Johnson should contacted them to discuss these issues. Fire access ok — Gary will measure hydrants. The project will remain on the Site review agenda. NEW BUSINESS: Mostly Mooses — Moving to old Bianchi catering shop on the other side of Moose's Saloon. The change in use is the purpose for review. Approved Maxwell — 226 3rd Ave E. Changing a residential use to an office in an RA-3 zone. The site has been modified significantly including alley parking and ADA accessibility. Screening in place. Susie to credit stormwater impact fees with the existing residential and calculate the fee using the other area used for commercial purposes. PW — the sidewalks may need to be upgraded. Will stay on the agenda for next week. Kidsports - Two concession stands proposed — one for the soccer fields and one for peewee baseball. Impact fees will be calculated by Susie for both structures. Fees may be waived based on 2005 permit. There are fire flow issues in the area. The Fire Dept. needs more information to review and comment on the proposal. There may be a latecomer's agreement. PW needs a site grading plan with elevations. PLANNING OFFICE ITEMS: Shady Glen Drive annexation - Randy Davis would like to annex his property into the City of Kalispell and connect to sewer. The property is located off of Woodland Park Drive on Shady Glen Drive — Lot 6. He's got engineering for sewer and will need to put a meter on the existing well. The fire hydrant is approximately 360 feet from the rear of the lot. Gary and F.Ray will go out to the site and get back to Randy on what, if anything, will need to be done for fire protection. Sewer, police and fire impact fees will need to be paid. Susie will check on stormwater. Discussed setbacks and location of home and driveway. The existing driveway is shared with the lot to the west and is gravel. That driveway as well as any new driveway or parking area (2 off-street parking spaces) will need to be paved. Don Sandler — 4th Ave East and 13 St E - Proposing to turn a single family home into a townhouse. Need more detailed information and a determination on whether the house encroaches into the public ROW. May need to remove portion of existing home from the public ROW as the structure cannot adversely possess public property. Discussion about sewer service. A 10 foot easement may be needed running from the alley to the new portion of the building or the applicant could access sewer from 13 St E. OTHER REPORTS: None The meeting was adjourned at 11:15 a.m. cc: Police City Manager FCAOA MDOT Bldg Fire City Clerk City Airport Planning Parks Comm. Dev. Public Works