Loading...
SIA (Recorded)ry) IC3 V) lz� (y) 1�) Return to: Theresa White Kalispell City Clerk P.O. Box 1997 Kalispell, MT 59903 111111111 IN 111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 200700020385 Fees: $28.00 by: AB AGREEMENT by KALISPELL CITY ATTN/T WHITE Date 7/9/2007 Tim age: o Paula Robinson, Flathead County Montana AP E X E SUBDIVISION IM-PROVEMENT AGREEMENT oU071sq 0 8q 9D THIS AGREEMENT, made and entered into this 7th day of May 20 07 by and between the CITY COUNCIL, CITY OF KALISPELL,, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and - Genesis Develppments, LLC (Name of Developer) a ComDan (Individual, Company or Corporation) located at P.O. Box 458, SomersMT 59932 (Street Address/P. 0. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSETH: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as Amended Plat of Lot 2 of Westbrook Subdivision (Name of Subdivision) located at Kalispell, Montana (Location of Subdivision) and, WHEREAS, the City has conditioned it's approval of the final plat of Amended Plat of Lot 2 of Westbrook Subdivision upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A" - and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improve . ments as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $_29 911.68 NOW THIEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable 0 A collateral as determined by the City Council, in the amount of 37,389.60 Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $ 37,389.60 the estimated cost of completing the required improvements in —Amended Plat of Lot 2 of Westbrook .Subdivision (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as are necessary to finance the completion of those improvements up to the limited of credit stated in the letter; 2. That said required improvements shall be fully completed by ___Septemberl 20 07 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete,; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of one (1) year from the date of acceptance of the completion of those improvements by the City; c. That the Developer knows of no defects in those improvements; d. That these improvements are free and clear of any encumbrances or liens; e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification of the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO- WIT.- That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall fumish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. 1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 Document Number: 200700020385 Page: 2 IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. —Genesis Developments, LLC. (Name of Subd ,jyj0on/DS,yc�oper/F'rm) by STATE OF MONTANA COUNTY OF f6#-ew4 on this day of 1120 before me, a Notary Public for the State of Montana, personally appeared :3Qe'-_ CLLck known to me to be the Lt_�l of whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto MY hand an ixed my Notarial Seal this day and Ve9r__fiirt above wfilten. . ��� __iL diZ� 1* 1 No Public f, r Fe'State ofon't na y Re iding at. T My Commission Ex4ires� (M7 )OR, CITY OF "LISPELL 1 MAO � it 0 0 F 1A ATTE : CTtY CLERK 11111 Hill Hill 11111111111111111111 lim Document Number: 200700020385 Page: 3 EXHIBIT B This agreement specifically includes the following improvements, their projected construction completion date and estimated construction costs. CHECK CONSTRUCTION ESTIMATED PERCENTAGE APPROPRIATE COMPLETION CONSTRUCTION COMPLETE IMPROVEMENTS DATE COSTS Street Grading/Paving n/a - Street Base n/a - Sidewalks n/a - Curbs and Gutters n1a - Sanitary Sewer n/a - Mains Other (Manholes/Service ) n/a On -Site Sewage n/a Facilities Water System n/a Mains Other n/a On -Site Water Supply n/a Water Storage Tanks n/a Fire Hydrants n/a Storrn Sewer or n/a Drainage Facilities Street Signs n/a Street Lighting n/a Street Monuments n/a Survey Monument Boxes n/a Landscaping/Boulevard trees n/a (includes Common Areas) Other (See Below) X I hr. fire wall construction X Remove faqade between buildings X Relocated sign for Lot A X 1i b _47 41 . . . . . . .... . ..... . 9/l/2007 $181�223.68 0% 9/1/2007 $81� 188 0% 9/1/2007 $35500 0% SLT13TOTAL $ 29,911.68 FEES $ N/ TOTALS COSTS $ 292911.68 TOTAL COLLATERAL (TOTALS COSTS X 125%) $ 37,389.60 IIIIIIIII IN IIIII III III 1111111111111111111111111111111111111111111111111111111111 IN III 11111111111 Document Number: 200700020385 Page: 4