Loading...
01-04-07 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, January 4, 2007 Building Department Conference Room ATTENDING: Paul Burnham, Assoc. Civil Engineer Sean Conrad, City Planner Nicole Johnson, City Planner P. J. Sorensen, Zoning Administrator, Chair Kathy Kuhlin, Recording Secretary Frank Castles, Asst. City Engineer Mark Crowley, Construction Manager F. Ray Ruffatto, Fire Inspector Sandy Wheeler, Comm. Dev. Mgr. Guests: Toby McIntosh, Jackola Engineering Hear the Public: None. Performance Bond Reminders: None. OLD BUSINESS: None. NEW BUSINESS: Mountain West Bank — 2260 Hwy. 93 S. — (preliminary review only) located next to Jackola's new building. Jackola Engineering is doing the site work on this project. The canopy attached to the building has is outside of both the setback and the utility easement. The Subdivision Review Board wanted the southeast corner as a right turn only; the City would not have a problem with that. The number of parking spaces could be a major issue, depending upon whether the 2400 sq ft is a footprint or is the gross square footage (i.e. is there a basement or a second floor?) — Toby stated that he was not sure. They will need lighting, drainage, and landscaping plans. They will need to work with Fred Leistiko regarding the airport heights. They will need sidewalks on the southern side of the property and connect to the sidewalk that is next to the highway. Finish floor will match Jackola's finish floor. Probably having a pedestrian crossing across the drive-thru lanes. Their electric engineers will be doing their lighting plan. Jackola will be doing the landscaping plan. The existing sidewalk will need to be made A.D.A. compliant. Fire is okay with this. PLANNING OFFICE ITEMS: None. OTHER REPORTS: Community Development Director — Sandy mentioned that the new Director's name is David Foster and he will begin on February I't. The meeting was adjourned at 10:25 a.m. cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works FCAOA MDOT