Loading...
04-19-07 Site Review MinutesSITE DEVELOPMENT REVIEW COMMITTEE SUMMARY Thursday, April 19, 2007 Building Department Conference Room ATTENDING: Frank Castles, Asst. City Engineer Sean Conrad, City Planner Mark Crowley, Construction Manager F. Ray Ruffatto, Deputy Fire Marshal Chad Fincher, Parks Superintendent P. J. Sorensen, Zoning Administrator, Chair Nicole Johnson, City Planner Craig Kerzman, Building Official Guests: James Freyholtz (M.D.O.T.) Hear the Public: None. Performance Bond Reminders: Mark is working with Stillwater Bluffs. Also discussion related to Stratford street lighting. OLD BUSINESS: Milbrandt Apartments — 1711 — 5th Ave E; — nothing new. Mountain Mudd — 130 W Idaho; espresso stand — by King Buffet. Temporarily withdrawn by applicant because they are focusing on 1-2 other locations. They will resubmit with our required changes when they are ready to work on this one. NEW BUSINESS: None PLANNING OFFICE ITEMS: Westview Business Park — requesting a plat amendment (creating 3 lots out of 2); discussion about storm drainage issues on the southern part of the subdivision and lot 1. It does not appear that the drainage swale along the southern PL could be addressed at this time since it is not necessary in order to mitigate the proposed change. The updated easement on lot 1 should included. Holmquist — 14th St and 8th Ave E; one larger lot that they would like to divide into 3. 2 lots is more practical due to the need for a 60 ft ROW to access the third lot (they can do a flag lot if they stay at 2). Width of the flag lot frontage is 20 ft unless they need a 20 ft paved fire lane — provide added width for drainage. Public Works would not support a road abandonment. Discussion relating to ROW improvements and utility connections. Extension for a hydrant may be needed. Westwood — they will do the bridge and have withdrawn the requested amendment Ashley Park Ph 9 — they need a second access/roadway reserve along the east side of the subdivision. No spite strips. They need to address noise mitigation and provide a bike path connection. They need to document fill quality and compaction. We should consider including language about a stormwater permit in all new preliminary plat approvals. Starling Group — Section 35 next to Glacier High School is coming. OTHER REPORTS: New Building Permit Applications - FVCC is remodeling existing classrooms and the Greenery has submitted for another tenant space. Neither will be on the site review agenda since they do not constitute an expansion or change of use. The Sons of Norway building will be submitting plans for remodeling the building to create offices. 38 8th Ave W — previously approved apartment building; they appear to be moving towards pulling a permit and beginning construction Hutton Ranch Food Court — site plan e-mailed to Susie Lone Pine Trails — Fire is OK with building permits; Public Works has not issued a certification for permits due to the failure to adequately provide the secondary emergency access Courthouse East — previsously conditionally approved; punchlist items — Parks (Jennifer said they are OK); Fire Dept has approved site issues (any code issues to be coordinated with Jeff); Building Dept needs to check off on accessible routes and bind parcels together. Public Works needs to accept the bonding (they may need to adjust the format that they submitted), drainage plan, and bridge construction (bridge can wait until the coffee house permit). Silverbrook — starting construction Meridian Pointe apartments — discussion relating to the blocked access The meeting was adjourned at 11:05 a.m cc: Police City Manager Bldg Fire Planning Parks Comm. Dev. Public Works City Clerk City Airport FCAOA MDOT