Department Activity ReportsTHE CITY OF KALISPELL, MONTANA
FINANCE DEPARTMENT REPORT
October 31, 2006
CASH RECONCILEMENT AT THE CLOSE OF BUSINESS
CASH ON HAND & DEMAND DEPOSITS:
GLACIER BANK/STIP-CASH IN TRANSIT`
GLACIER. BANK CHECKING & REPO A/C
GLACIER BANK -POOL ACCOUNT
STIP PROGRAM
MULTI -BANK. SECURITIES, INCIREFCO
MULTI -BANK SECURTMS INC./SMITH BARNEY
BIDDER'S BONDS
SUB -TOTAL DEMAND DEPOSITS:
INVESTMENTS:
GLACIER BANK:
COURTYARD RESERVE ACCOUNT
COURTYARD RESERVE ACCOUNT/EQUITY
COURTYARD RESERVE ACCOUNT/EQUITY
RURAL DEVELOPMENT GRANT ACCOUNT
STIP PROGRAM (UDAG)
OTHER INVESTMENTS:
REVOLVING FUND: 1998 S & C BONDS
REVOLVING FUND: 1999 S & C BONDS
REVOLVING FUND: 2000 S & C BONDS
REVOLVING FUND: 2002 S & C BOLDS
REVOLVING FUND: 2003 S & C BONDS
REVOLVING FUND: 2004 S & C BONDS
REVOLVING FUND: 2005 S & C BONDS
TOTAL S & C's:
TOTAL LONG TERM INVESTMENTS:
PETTY CASH
TOTAL TO BE ACCOUNTED FOR:
Respectfully Submitted,
gwow J. gmw
Debra J. Deist
City Treasurer
Renter Dep.
DATE:
October 31, 2006
$ 224,336.17
$ -
$ 20,725,091.73
$ 5,988,441.11
$ 40,400.00
$ 230,175.95
$ 27,208,444.96
$ 40,887.23
$ (3,895.00)
$ 3,590.00
$ 91,058.67
$ 689,165.54
$
210.86
$
442.24
$
868.32
$
8,352.27
$
10,318.82
$
27,731.13
$
22,850.13
$
70,773.77
$ 891,580.21
$ 1,830.00
$ 28, 10 1,855.17
City
of K
Post office Box 1997 - Kalispell, Montana 59903-- l 997 w Telephone (406)758-7700 Fax (406)758-7758
REPORT TO: James Patrick, City Manager
SUBJECT:
Monthly Activity Report for
FROM: James Hansz, Public Works
DATE: October 13, 2006
Highlights of monthly activity for the operati
Department for the month of September 2006 are as follows:
ENGINEERING DIVISION
E'ngineerma & Desien
• Fielded 130+ phone calls related to utility services, sub -divisions, and engineering.
• Attended six office conferences regarding various development projects.
• Attended site review meetings held on Thursday.
■ Continued development of Kalispell Area Transportation Plan Update, 2006 project; held
initial public meeting at Central School Museum and provided updated information to
Kalispell TAC.
• Continued development of the Kalispell Facility Plan Update, 2006 project; reviewed
Basis of Plan criteria and initial drafts of chapter 1, 2, and 4.
■ Met with County Road Superintendent to review issues related to county -maintained
roads in and adjacent to City areas of rapid development.
• Met with representatives of Evergreen Water/Sewer District to review issues related to
providing sewer services outside their district boundary.
• Participated in conference call with developer and architect of Hilton Garden Inn to
resolve issues related to utility SDC fees for the project.
• Wastewater Treatment Plant PLC Replacement Project is currently bidding. Pre -bid to
be held on November 1 st and bid opening on November 81h.
• Reviewing potential lower cost option for replacing 1 8" water main connecting reservoirs
#1 and #2.
uryeVin,Q
• Continued coordination of the 2006 Aerial Survey and Base Mapping update project with
contractor, Horizon; tools delivery of initial base mapping and ortho-photos in the local
Kalispell coordinate system. Additional deliverables of data in State Plane system is
scheduled for October.
• Began receiving orthophoto information for the 2006 mapping project. — integrated into
AutoCAD and forwarded to utilities planning engineers.
• Responded to miscellaneous survey requests.
• Continued updating utility base maps to reflect additions to City systems.
WATER RESO U.IR CE DIVISION
Wastewater Treatm en t
* 200 Work orders were completed during the month of September.
* 408 Lab tests were performed during the month of September.
• 3 3 8.1 Tons of Biosolids were transported:
1, 295.8 tons to Glacier Gold
Z. 42.3 tons to Flathead County Landfill
* Permit Report for August 2006: There were no permit violations. The total monthly
flow was 88.5 million gallons, with an average daily flow of 2.854 million gallons
(design flow is 3.1 mgd); the peak flow was 3.1 million gallons on August 1 ".
• Weekly safety meetings were held.
• one year inspection of secondary clarifier center drive unit replacements completed; no
problems found.
• 30,000 gallons of biosolids were removed from the east secondary digester and tilled into
the 40 acres on Cemetery Road.
Storm Water
• Furniture Galleries: Reviewed new detention area.
• 125 Financial Drive: Reviewed drainage, phone comments to engineer and builder.
* Revised Fairway Blvd: Finished Design.
■ Stormwater drainage design, review, field visit and comments for: Conrad Mansion -
Survey with Fred and drafted plans; Hilton Garden Inn -Reviewed drainage, talked to
engineer about comments; 125 Financial Drive- Reviewed revised drainage and OK'd
design; VFW- Field visit with contractors, reviewed location of storm line and gave copy
of standard for tapping storm main.
■ Lawrence Park: Field visit and survey at Park to determine floor plain elevation; Meeting
with Friends of Lawrence Parr to discuss pipe extension in park -Resolved to remove pipe
to original location and provide mitigation of disturbed area- mitigation involves
regarding bank slope, planting and erosion control until disturbed area stabilized. Letter
to Tom Jentz outlining the above.
• Parking lot at Target development: Field meeting with landscapers.
• Ninth Alley West: Survey with Fred.
• Ramsgate and Sherry Lane: Survey with Fred, started design.
• Hilton Garden Inn: Reviewed revised drainage, sent letter per Frank regarding manhole
additi on sll o cations.
* Willow Creep: Preliminary drainage comments to Frank.
* Main Street south of golf course: Survey with Fred.
* 3rd Ave WN just north of Mall: Field meeting with Ned-Jackola Engineering --Preliminary
drainage design review.
• SDC Calculation: 100,110,120,130,140, 150 Cedar Commons.
• Whitefish Stage signs: Meeting with contractors and City Staff in reference to
construction schedule; Talked to state about encroachment permit; stared sign and meter
locations and sent out U -Dig.
• Worked several days at WWTP.
Water Production
■ Produced 136 M gallons of water: 45 M gallons upper zone and 91 M gallons lower zone.
■ Injected 558 gallons of sodium hypochlorite, 12% solution to maintain an average
chlorine residual of 0.35 PPM throughout the system.
■ Continued daily monitoring of all pump stations and routine maintenance on all pumps,
motors, chlorination equipment, analyzers, grounds, buildings, controls, testing, water
sampling, and record keeping.
• Monitored and observed test pumping, developing of Old School well and Westview
well.
■ Winterized irrigation systems and building in the preparation for cold weather.
■ Installed pager system for water system, pumps, wells and water storage.
• Researched and obtained comparable prices for purchasing safety equipment.
■ Received 1,116 gallons of sodium hypocholrite.
■ Coordinated work at the Armory Well with Hilton construction, new water main and
floor main.
• On September 6th at 3:00 a.m., the booster pumps failed to run, elevated tank lost water,
resulting in low water pressure. ongoing research with the electrical engineers.
■ Held weekly safety meetings.
MAINTENANCE & CONSTRUCTION DIVISION
Street Main ten an ce & lie air
■ General operations and maintenance of City streets and alleys.
• Assisted the Solid Waste Division with alley cleanup.
Patched for main breaks at South Main and S "' Avenue West & 5 th Street West.
• general patching through out the City.
• Assisted the Parks and Water Divisions.
• Removed sections of sidewalk from 35 Main Street and the 400 block of 15t Avenue East.
• Hauled dirt from the City Airport to the lot behind R.osaurers.
• Hauled leaves from the WWTP to Woodland Park.
• Held weekly safety meetings.
Water 1 Main ten an ce & Re air
■ Repaired main breaks at 1 oth Street and South Main and at 3"d Avenue WN and Idaho.
■ Repaired 1/4" service line at 1235 7th Avenue East.
■ Repaired the fire hydrant at 49 Commons Loop.
■ Repaired the curb stop at 391 6th Avenue EN — Red Eagle Aviation.
■ Replaced fire hydrants at: 6th Avenue WN and West California; 206 Kristen; 8th Avenue
East and 1 lth Street East, and at 536 Parkway Drive.
■ Completed 4" and 1 t/2" water taps at the new VFW location.
■ Completed S" water tap for the new Hilton Inn on Hwy 93 South.
■ Raised the fire hydrant at Woodland and 4t" Street East.
■ Repaired valve at 5th Avenue East and 6th Street East.
■ Worked at Lawrence Park to remove the overflow pipe.
■ Held weekly safety meetings.
SewerlStorm System Main ten an c„e
• Continued video inspection and jet -cleaning of sewer lines -Monday through Thursday.
• Performed weekly maintenance of twenty-six lift stations each Friday.
• Held weekly safety meetings.
Solid Waste Collection
■ Delivered 7 containers to new customers: 0-90 gallon, 6-100 gallon, 1-400 gallon,
0-3 0o gallon.
• Repaired 3 containers: 0— 90 gallon, 0- 100 gallon,2— 300 gallon, 1— 400 gallon and
responded to 6 violations.
• Continued weekly garbage service and alley cleanup.
• Continued pruning in City alleys.
• Continue putting containers together.
• Held weekly safety meetings.
Traffic Sins & Egnals
■ Continued regular maintenance of signals, signs, luminaires, barricades, sight
obstructions, Airport lighting, alley lighting.
• Signed and barricaded for water main break in the 1000 block on South Main.
• Painted curbing on several more driveways around Flathead High School.
• Checked on several site obstruction complaints.
■ Removed graffiti from numerous signs on the Westside of Kalispell.
• Painted yellow curbs on 7th Ave W at 9th St W, Soh St W, 7" St W and 6th St W.
• PD having parking problems with high School Students, so painted curbs.
■ Tightened all screw terminals in (3) cabinets on North Meridian Road at Two Mile Drive,
Liberty Street and Three mile Dr.
• Assisted in turn on for signals on North Meridian at Two Mile Drive, Liberty Street, and
Three Mile Dr. All work well.
• Tested Opticom at the above intersections. All functioned excellently.
• Replaced conflict monitor in the cabinet at Liberty and North Meridian Road.
• Continue to work on thermoplastic on cross -walks.
• Completed traffic counts at 5th Avenue East and 7th Street East.
• Painted four handicapped stalls for the Sports Complex.
• Painted stripes on both exits/entrances at Village Greens.
• Laid out and painted parking lot at the new Building Department offices located at Fourth
St. West and First Avenue West.
• Moved "No Trucks" sign on Northern Lights Blvd. -- was in the right-of-way of
homeowner.
• Replaced "Stop" sign and pole at East Washington and North Main Street — truck ran
over it.
• Continued weekly safety meetings.
Equipment Maintenance
95 Repair orders were completed during the month of September:
■ Police — 20
Streets
— 13
Fire — 8
■ Garbage - 9
Others
- 45
Total — 95
• Continued regular maintenance of City vehicles and machinery.
• Replaced air brake chamber on the Wastewater Treatment's truck.
■ Replaced the muffler on the Water Division's pressure washer.
• Replaced broken hydraulic oil hose on the garbage truck.
• Replaced broken wiring for the throttle switch on the rear loader for the Solid Waste
Division.
• Replaced top beacon control switch, repaired rear engine wiring, and replaced RPM
sensor on the street sweeper.
• Service call — repaired mower wing switch and replaced battery on the Parks' mower.
• Installed trailer wiring and light connector on the Sewer Division's truck.
• Repaired broken fuel line on the garbage truck.
• Adjusted brakes and repaired leaking front hub cover on the Street Division's Tandem
dump truck.
■ Replaced battery and checked charging system on the ambulance.
* Replaced alternator in police car.
• Replaced rear brakes, drums, and body mounts on Parks' truck.
• Replaced engine heater plug on the Water Division's Tandem.
+ Replaced air control valve kit on the garbage truck.
• Replaced ignition coil and module on police chief s car.
• Replaced power steering pump on Police Dept's Ford Expedition.
• Rewired outrigger switch on Fire Department Ladder Truck.
• Removed engine and transmission from wrecked police car.
• Replaced hydraulic tube on the Water Division's backhoe.
• Repaired Sewer Division's generator for surging.
• Replaced transmission air modulator and welded holes in body of garbage truck.
• Replaced door latch/cable assembly on the Street Division's loader.
• Repaired wiring and replaced siren circuit break on the Fire truck.
• Held weekly safety meetings.
BUDGET RESO UR CE DI VISION
Capital Engrams
• Conducted first FY 06107 internal review of FY 06107 capital projects and determined
project assignments and desired completion dates.
■ Coordinated with City's WWTP design consultant for preparation of state revolving fund
loan application package for WWTP expansion project.
Capital Programs continued...
---�IIIIIIIIII���II�
■ Presented Council with IFAC's (Impact Fee Advisory Committee) recommendation for
Water, Sewer, and Stormwater Impact Fees.
■ Published Notice of Intent to hold a Public Hearing on Water, Sewer, and Stormwater
Impact Fees.
• Reviewed Police and Fire Impact Fees with IFAC.
• Completed the FY06 Capital Improvement Report for the Finance Department.
Assessment Systems
• Calculated square footage and applicable assessments on 146 properties.
■ Submitted to the County the assessments for the ' 06 tax year totaling 2.67 million dollars.
■ Prepared eight City maps for the Fire Department and various maps for the Public Works
Department.
• Conducted field inspection, updated, and corrected assessments for over 200 units in
Glacier Village Greens.
Utility Rate A dm in istration
-�W�IIIIIIII�IIII III{
* Tagged 64 delinquent accounts on the East Side of Kalispell.
• Meter maintenance and change out on going.
• Repaired and/or replaced 80 meters.
■ 78 Final readings were completed.
■ 24 water meters were distributed for new water accounts.
ADMINISTRATION
• Received bids for the 26 Cubic Yard Solid Waste Sideloader Packer for the Solid Waste
Division on September 22, 2006.
Em emen cy C'all -outs
There Were 24 emergency call -outs for the month of September:
Water Division — 17
Sewer Division — 7
TSS Division — 0
Street Division - 0
WWTP - 0
Total — 24
Personnel
■ Continued efforts with HR Director to establish career ladder system for PWD union
personnel.
Public Communications
• Began updating Public Service Announcements related to fall leaf collection and winter
snow plowing.
SE TES E 2006
Din
Aar- �
c
_ p 7v a
C� * . �:G.1142
3c t
�� ear one
Total ProduetI6
972,000
720,000
1,235,000
931,000
2,921,000
1,119,500 -
937,000
2,056,500
4,977,500
1,203,000
924,000
1,368,000
1,006,000
3,756,000
976,400 -
745,000
1,721,400
5,477,400
1
600,000
440,000
773,000
2,543,000
3,567,000
1,257,300 -
789,000
2,046,300
5,613,300
1,084,000
805,000
1,424,000
1,136,000
3,643,000
1,057,500
806,000
1,863,500
5,506,500
1,373,000
746,000
1,796,000
1,262,000
3,983,000
1,135,700 -
1,194,000
2,329, 700
6,312,700
:'
1,530,000
1,395,000
1,847,000
1,157,000
4,588,000
1,159,000 -
1,341,000
2,500,000
7,088,000
7
1,243,000
910,000
1,672,000
1,321,000
4,153,000
974,300 -
993,000
1.967,300
6,120,300
#
1,230,000
972,000
1,547,000
1,287,000
4,162,000
995,300 -
874,000
1,869,300
6,031,300
1,227,000
856,000
1,113,000
1,348,000
3,883,000
1,021,700 -
661,000
1,682,700
5,565,700
10
1,094,000
820,000
1,506,000
1,170,000
4,147,000
1,150,000 -
443,OOo
1,593,000
5,740,000
Z
1,327,000
909,000
1,607,000
1,118,000
4,326,000
1,062,700 -
635,000
1,697,700
6,023,700
12;
1,176,000
870,000
1,543,000
1,231,000
3,929,000
1,081,000 -
891,000
1,972,000
5,901,000
13 :
1,285,000
832,000
1,429,000
972,000
3,454,000
1,145,200 -
1,064,000
2,209,200
5,663,200
1,016,000
798,000
1,289,000
1,201,000
3,677,000
1,004,200 -
627,000
17631,200
5,308,200
1 +
611,000
471,000
894,QQ0
670,000
2,293,000
1,114,300 -
353,000
1.467.300 :
3,760,300
1
892,000
638,000
1,158,000
OFF
2,6227000
957,300 =
66,000
1,023,300
3,645,300
17
643,000
526,000
949,000
OFF
2,018,900
1,062,500 -
99,100
1,161,600
3,180,500
8
1,002,000
712,000
1,049,000
OFF
2,598,800
1,200,000 -
164,200
1,364,200
3,963,000
652,000
499,000
1,012,000
772,000
2,807,900
1,171,200 -
127,100
1,298,300
4;106,200
2t1
531,000
474,000
838,000
509,000
2,317,000
1,060,000 -
35,000
1,095,000
3,412,000
21
439,000
403,000
717,000
568,000
2,080,500
1,065,700 -
46,500
1,112,200
37192,700
22
356,000
308,000
472,000
822,000
1,937;900
944,100 -
20,100
964,200
2,902,100
23
876,000
611,000
1,161,000
OFF
2,648,000
971,200 -
-
971200
3,619,200
24
644,000
416,000
760,000
OFF
1,720,000
999,500 -
-
999,500
2,719,500
2
816,000
670,000
1,177,000
OFF
27618,000
971,800 -
45,000
1,016,800
3,634,800
26
576,000
423,000
1,252,000
42,000
2,226,600
991,700 -
66,400
1.058,100
3,284,700
561,000
429,000
636,000
581,000
2,140,300
961,000 -
66,700
1,027,700
3,168,000
2.8.
568,000
424,000
766,000
857,000
2;571,000
1,146,800 -
44,000
1.190,800
3,761,800
352,QQ0
25$,QQQ
459,QQQ
1,Q11,QQ0
2,003,000
871,2QQ -
77,000
948,200
2,951,200
0
655,000
401,000
712,000
848,000
2,616,000
1,056,700 -
-
1,056,700
3,672,700
Tom'
26,434,000
19,660,000
34,161,000
24,363,000
91,407,900
31,684,800 -
13,210,100
44,894,900
136,302,800
De p.A
Depot
Buffalo
N«fl�wu��r
t;Yt��Y• �r 1
L} 4f,Ktti l ()f]f`l i1E.Y) 3�000
Millions of Gallons
N R.
P
E...
,...,.
_. ....
BuffM
yy,i p
:r -
,may +�q
Y t� ±�Y �
r Fes,
.. ..
�j� �s
�r y�
oo
dry oft�j
y y�y
r
�y y�
Total. y� on
..
. t11
25,562,000
4,271,000
25,022,000
54,768,000
15,593,800 -
64,000
1 ,fs 8 ,8c t7
70,448,800
Feb.26,910,000
23,263,000
938,000
-
7t,C��B,�
14,160,700 -
93,000
14,233,700
05,271,700
28,155,000
20,652,000
8,880,000
—
57,577,000
16,723,100 —
110,000
16,8 3,1 w
74,410,100
APB :
18,884,000
13,978,000
24,821,000
—
57, t? � 7C 7
19,684,200 —
413,300
20,097,4 W
77,367,200
30,146,000
25,698,000
40,634,000
—
85,1, 4,200
29,505,700 —
11,343,800
40,849,500
1 `? -5,,983 , 7 G0
31,986,000
27,855,000
43,193,000
2,472,000
92,079,,Sc0
31,081,500 —
14,608,200
45,(a89,700
13(5,587,5(K)
311 `
43,234,000
35,199,000
49,697,000
60,437,000
147,928,500
33,108,000 —
40,638,500
i:�3,7116,5C)C�
`�� 1,075 ,000
Auk
47,652,000
35,564,000
53,504,000
43,102,000
138,491,(Xs 0
33,625,300 —
41,331,000
74,956,300
313,447,300
�*
26,434,000
19,660,000
34,161,000
24,363,000
91,407,900
31,684,800 —
13,210,100
44,894,90