E3. Award Bid for 2nd Alley WN Sanitary Sewer Replacement ProjectAL No L PUBLIC WORD -DEPARTMENT Date: April 13, 2016 20111 Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 MEMORANDUM www.kalispell.com/Public works TO: Doug Russell, City Manager FROM: Keith Haskins, PE — City Engineer CC: Susie Turner PE — Public Works Directo F/ SUBJECT: 2nd Alley WN Sanitary Sewer Replacement Project MEETING: April 18, 2016 BACKGROUND: The 2nd Alley WN Sanitary Sewer Replacement Project is a planned Capital Improvement Project which will replace approximately 1,500 linear feet of 8 inch and 10 inch vitrified clay pipe (VCP) sewer main with 10 inch SDR 35 PVC main. The project replaces 4 blocks of sewer begining at Montana Street, crossing Idaho Street (Hwy 2), through Washington and Oregon Streets, and terminating at California Street. Currently, the northern (upstream) block of the project is 10 inch VCP which flows into the southern (downstream) 3 blocks of undersized 8 inch VCP which does not have adequate capacity. In addition to the capacity problems in the undersized sections, the existing mains are also subject to extensive tree root intrusion which further reduces pipe capacities. This project will correct the current deficiencies in the main and replace existing services to the alley right-of- way line. The project also crosses Hwy 2, requiring a jack and bore casing installation through the highway right-of-way. Bids were received and opened on April 7, 2016 at 2:30 PM. Three responsive bids were received fiom local contractors. The bid results follow: Contractor Total Bid Price Sandry Construction Co., Inc $683,138.00 LHC, Inc. $744,817.31 Downing Underground, Inc. $968,538.00 Engineer's Estimate $705,076.00 References for Sandry Construction were contacted and interviewed. Sandry was determined to be a responsible contractor successfully completing projects of similar size and scope in Northwest Montana. Doug Russell — City Manager RE: 2nd Alley WN Sanitary Sewer Replacement Project Page 2 STAFF RECOMMENDATIONS: Award the bid for the 2°d Alley WN Sewer Replacement Project to Sandry Construction in the amount of $683,138.00. FISCAL EFFECTS: Funds are currently available for this project in the following line items: 5310-454-430630-961 2nd Alley WN — Mont to Calf $464,920 5310-454-430635-961 2nd Alley WN — Mont to Calf $239,505 Total Project Funds Available $704,425 ALTERNATIVES: As suggested and approved by the City Council