Resolution 3106 - Amend Contract - Sandon - Concrete Alley Pavement ImprovementRESOLUTION 3106
A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH
BANDON CONSTRUCTION COMPANY ON S. I. D.'#324 CONCRETE ALLEY PAVEMENT TROVE ENn
WHEREAS, the City did, on March 18, 1977 enter into a contract with Bandon
Construction Company, of Kalispell, Montana for paving and improving First Alley
East from Fifth Street to Center Street on the S.I.D. #324 Concrete Alley Pavemen
Improvement Project; and
VHERFAS, upon the advice and recommendation of Thomas, Dean & Hoskins, Inc.
who is the City°s consultant and engineer on said project, certain changes and
alterations of design and specifications have been found necessary and adviseable
and in the best interests of the City; and said changes and alterations could not
have been necessarily foreseeable when the original design and specifications
were prepared on this phase of the Concrete Alley Pavement Improvement Project,
and said changes are contained in Exhibit "All attached hereto and are by this
reference made a part hereof; and
WEEREAS, it appears an the best interests of the City to approve said changes
and alterations,
NOW THEREFORE,.pursuant to the provisions of Section 11--1204, R.C.M., 1947,
be it hereby resolved:
1. The alterations and modifications of the specifications and plans of the
contract between the City of Kalispell and Bandon Construction Company, dated
March 18, 1977, as set out in Exhibit "A" attached hereto, are hereby approved; and
2. As soon as the price to be paid for said alterations and modifications
are agreed to in writing, signed by the contractor, as hereby approved by the
Council, this approval thereof shall be in effect.
PASSED BY TIM CI OUNCIL AND 7P11FT THE MAYOR OF THE CITY OF KALISPELL THIS
APRIL 11, 19 .
ATTEST: ,
C
r
C
ed City G1.ervrgiifo,
t lase 1 oertia L Is at r �i sg�e. o i o ��a�na a s las°
ura o
meeting hale the 1 1 th day of � 977 Yr
itv-"Qlf rk 0-f 4--
Form 0-1
2/77
PROPOSED CHANCE ORDER NO. I DATE April 12, 1977
PROJECT S.I.D. #324, Concrete alley pavement improvements.
01-MM City of Kalispell
CONTRACTOR Sandon Construction Co., Inc.
is
The following change hereby proposed to the Contract dated NaTch 18, 1977
1. Excavate and replace unsuitable subbase material with gra4wlar pit run
gravel at the unit price of 51-95 per cubic yard, the total quanitity not to exceed
500 cu. yde, without further consideration by the Amount of Change _L--27.5--OO
owner.
2. If necessary, the owner has the option of extending the total IMMLag2
at the stated unit price Amount of Change_A
The total amount to be (added) (fttzkzd) hereby is 975-00
The con -tract price including this change order will be: 73,090-76
not
The contract time is/changed �X1... jq 12 3
The amended date for completion of all work- will be same
JUSTIFICATION 'Unsuitable material has been encountered during subgrade
excavation. Replacement is necessary to provide a stable roadway base.
APPROVED: I
Engineer