Resolution 3108 - Contract Amendment - Pack & Co - Storm Drain ImprovementsRESOLUTION NO. 3108
A RESOLUTION TO ALTER. AND AMEND THE PLANS AND SPECIFIOATIONS OF CONTRACT
WITH PACK AND COMPANY ON CONSTRUCTION OF STORM DRAIN IMPROVEMENTS, NOD
GRANT NO. 11-76-mB-3o-0008.
WHEREAS, the City did, on February 9, 1977, enter into a contract with
Pack and Company of Kalispell, Montana for ;storm drain improvements on 7th
Avenue West on the Construction of Storm Drain Improvements Project (HUD
Grant No. 1-76-DN-30-0008); and
WHEREAS, upon the advice and recommendation of Stahly Engineering &
Associates, who is the City's consultant and engineer on said project,
certain changes and alterations of design and.specifications have been
found necessary and adviseable and in the best interests of the City; and
said changes and alterations could not have been necessarily foreseeable
when the original design and specifications were prepared on this phase of
the Construction of Storm Drain Improvements Project, and said changes are
contained in Exhibit "A" attached hereto and are by this reference made a
part hereof; and
WHEREAS, it appears in the best interests of the City to approve said
changes and alterations,
NOW THEREFORE, pursuant to the provisions of Section 11-1204, R.C.M.,
1947, be it hereby resolved:
1. The alterations and modifications of the specifications and plans
of the contract between the City of Kalispell and Pack and Company, dated
February 9, 1977, as set out in Exhibit "A" attached hereto, are hereby
approved; and
2. As soon as the price to be paid for said alterations and modif-
ications are agreed to in writing, signed by the contractor, as hereby
approved by the Council, this approves thereof shall be in effect.
PASSED BY CI COUNCIL AND PRO BY. THE YOR OF THE CITY OF KALISPELL
THIS d DA OF Mav 9 77
Form C-1
2/77
E IBIT "All
PROPOSED CHANGE ORDER NO. l DATE April 27, 1977
Construction of Storm Drain Improvements
PROJECT R.D.D. Grant No. B-76-DN-30-0008
Oyu City of Kalispell, Montana
CONTRACTOR Pack and Company
is
The following change a= hereby proposed to the Contract dated 2/9/77 T
1. Install Clean -Out Manhole - Force Account No Bid Price
2.
of Change $ ___403.25_
mount of Change $
The total amount to be (added) ( hereby is _$L 408.25._
The contract price including this change order will be: $ 3.81,194,01
not
The contract time is/changed
The amended date for completion of all work will be sauce
JUSTIFICATION A 301, access manhole was installed where the existing storm drain
ties into the new 4211 R.C.P. storm drain at the request of the City of KalisDell's
storm sewer maintenance personnel to facilitate clean -out of the old s stem should
there be delays in installation of the remainder of the new southwest storm sewer
system.
7-7 ontrac or
APPROVED:
Engineer.
Form C-1
2/77
EXHIBIT "An
PROPOSED CHANGE ORDER No. 2 DATE April 28, 1977
Construction of Storm Drain Improvements
PROTECT H.U.D. Grant No. B-76-DN-30-0008
OWNER City of Kalispell, Montana
CONTRACTOR. Pack and Com E
The following changes are hereby proposed to the Contract dated 2/9/77
1. Carry Stub -out at 10th Street to behind curb turns
Amount of Change-! 499.44
2. Delete bid items not to be used due to street reconstruction by city
crews. Amount of Change $ - 4,048.00
3. Install Storm Drain to 6th Street Amount of Change $ 6 !0. 66
The total amount to be (added) Cja&t&Q hereby is $ 'z'i,1 11,8O
The contract price including this change order will. be: _214,335.81
The contract time is changed by (adding) (dam) 30 �calendar days thereto.
The amended date for completion of all work will be September 7, 1977
JUSTIFICATION 1. The original contract called for the 18" stub -out from the 421, storm
drain to be 6' in length. This should be extended to beyond the curb turns so that the
pavement to be installed this year will not be disturbed when Phase 3 of the SW area
storm sewer is constructed a a a er date. 2. This Bid item was Me-li-xTe-d to provide
for temporary asphalt curbs for drainage channelization around the new curb inlets and
is no lonret needed as tRe City is regions ruc ang TH5 s ree s THIR cons ruc a,on season.
3. The original contract called for the installation of the 7th Ave. W. storm drain
system up to 71H t. The above cost of $33,141.80 has been added to allow construction
of the storm drain from 7th Street to 6th Street under this contract. For detailed
Mid ems see attachedattaohed sheet.
Contractor
APPROVED:
Engineer