Loading...
Resolution 3094 - Contract Amendment - Pack & Co - 1st Ave E Storm DrainRESOLUTION NO. 3094 A RESOLUTION TO ALTER AND AMEND THE PLANS AND.SPECIFICATIONS OF CONTRACT WITH PACK AND COMPANY, INC. ON FIRST AVENUE EAST STORM DRAIN IMPROVMENT PROJECT. WHEREAS, the City did, on July 22, 1976 enter into a contract with Pack and Company, Inc. of Kalispell, Montana for construction of storm drain improvements on First Avenue East; and WHEREAS, upon the advice and recommendation of Thomas, Dean & Hoskins, Inc., who is the City's consultant and engineer on said project, certain changes and alterations in the drainage system are necessary because of a drainage problem. This change order will correct this problem. Said changes and alterations have been found necessary and adviseable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specificat- ions were prepared on the construction of the storm drain project. Said changes are contained in Exhibit "A" attached hereto and is by this refeence made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations; NOW THEREFORE, pursuant to the provisions of Section 11-1204, R.C.M., 1947 be it hereby resolved; 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Pack and Company, Inc., dated July 22, 1976, as set out in Exhibit "A" attached hereto, and is hereby approved; and 2. As soon as the price to be paid for said alterations and modificat- ions are agreed to in writing, signed by the contractor and approved by the Council, this approval thereof shall be in effect. PASSED BY THE CITY NOVEMBER, 1976./ ATTEST: ( or ar ee, City Clem I, the undersigned, Cit Clerk of the C' y of a true copy of the Resol duly pa -15 Montana at a regular meeting he Ci MAYOR THIS 15TH DAY OF ispel ertify that the foregoing is City cil .9f the City ofy Kalispell, RUN CITY OF KALISPELL Project: Storm Drain Improvements at Kalispell, Montana. Date: 10-26-76 Change Order No, The following changes in the plans, specifications and quantities for the above project for Lalispqll Storm Drain Improvements - , are proposed: A. Description- (See attached sheet) B. Purpose: To correct a drainage problem on the east side of the intersection of 3rd Street and Main Street. C . Cost: (See attached cost estimate) $ Jai654.'75 When accepted and approved by The City of Kalispell ,and by the Contractor, this Change Order becomes a part of and subject to the terms and conditions of the original contract for construction of- Storm Drain Improvements at Kalispell, Montana. RECOMMENDED FOR ACCEPTANCE AND APPROVAL, ACCEPTED AND APPROVED- By-,_ ATTEST: THOMAS, DEAN & HOSKINS, INC. Engineers By:," C 31.1,8A DESCRIPTION OF WORK AND ESTIMATED CONSTRUCTION COSTS . 3rd Street & Main Storm Drain Correction 145 C,Y. Trench Excavation @ $6.00 per C.Y. 1-60 L.F. 12" Type 11 RCP @ $12.20 per L.F. I - 41 Diameter Storm Drain Manhole @ $585.00 ea. 4 V.F. Extra Depth Manhole @ $81.00 per V.F. 2 Detail No. 6 Rebuild Circular Inlet, Grate and Apron @ $457.00 ea. 1 Connection to Existing Storm Drain @ $174.00 ea. 62 S.Y. Highway Crossing @ $25.00 per S.Y. 37 S.Y. Type I Pavement @ $10.75 per S.Y. 98 S.Y. Concrete Pavement Removal @ $15.00 per Yd. Traffic Control - Pedestrian & Vehicular Total: $ 870.00 1,952.00 585.00 324.00 914.00 174.00 1,550.00 397.75 1.1470.00 420.00 $8,656.75