Loading...
Resolution 3051 - Contract Amendment - Pack & Co - SID 322RESOLUTION NO. 3051 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH PACK AND COMPANY, INC. ON SPECIAL IMPROVEMENT DISTRICT NO. 322 WEEMS, the City did, on February 17, 1976 enter into a contract with Pack and Company, Inc. of Kalispell, Montana for bringing up to grade, paving and installation of curbs on a portion of Claremont Street and related work on Special Improvement District No. 322; and WHEREAS, upon the advice and recommendation of Stably Engineering & Associates, who is the City's consultant and engineer on said project, certain changes and alterations of design and specifications have been found necessary and advisable and in the best interests of the city; and said changes and alter- ations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of Special Improvement District No., 322 project, and said changes are contained in Exhibit "A" attached hereto and is by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve .said changes and alterations, NOW TFM'ORE, pursuant to the provisions of Section 11-1204, R.C.M., 1947, be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between -the City of Kalispell and Pack and. Company, Inc., dated February 17, 1976, as set out in Exhibit "A" attached hereto, is hereby approved; and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing; signed by the contractor and approved by the Council, this approval thereof shall be in effect. PASSED Y g CITY COUNCIL AND KALIS ELL TT31�S 17TH DAY OF MAY, ee, City THE MAYOR OF THE CITY OF Norma E. Rapp, Mayor I, the undersigcaed, City Clerk of the City a' Kalispell eertif that thtforegoing is a true copy of the Resolution duly passed- the City Council the City of ali�pell, Montana at a regular meeting held X"TM 1 1 6 �� �., 140 1st Avenue East Y.alispell, I4T 59901 MIBIT "A" CHANGE ORDER Order No. 1 Date: May 14, 1976 Agreement Dates NAME OF PROJECT: STREET IA9PROVEmENTS - SID 322 OWULR: CITY OF I'.ALISPELL, I4014TANA CONTRACTOR: PACK AND CO:dPANY The following changes are hereby made to the CONTRACT DOCU14ENTS. 1. Item ';f12 - Adjust Manhole - add 1 @ $100.00 2. Lower MPC Gas Line -- Force Account Supervisor 31� hr @ $16.00/hr $ 56.00 Labor 711 hr @ 12.00/hr = 90.00 Backhoe (500) 8 hr @ 27.00/hr = 216.00 Backhoe (410) 1 hr @ 24.00/hr - 24.00 Compactor I day @ 60.00/day = 60.00 Vibratory Compactor 6 hr @ 35.00/hr - 210.00 Total $656.00 3. Encase sewer stub in concrete - Force Account Labor 5 hr @ $20.00/hr - $100.00 Concrete 1 3/4 cu. yd @ 31.50/cu. yd. = 55.12 $155.12 4. Install curb turns and approaches to Medical Arts Building Item #1 - Unclassified Excavation 60 cu. yd. @ $1.98/cu. yd. = $113.80 Item 43 -- Concrete Curb & Gutter 184 l.f. @ $4.25/l.f, 782.00 Item 94 -• Plant Mix Bituminous Base 3" thick 90 sy @ $1.905/sy _ 171.45 Item ;;8 - Plant Mix Bituminous Surfacing 2'" thick 90 sy @ $1.22/sy = 109.80 $1,182.05 S. Install 4" water stub for Lutheran Home: Bid $1,753.00 Total $3,846.17 JUSTIFICATION: 1. The existing sanitary sewer manhole at Station 10+60 on Claremont Street was originally thought to fall behind the curb line. however, the west side of the manhole falls within the curia necessitating that the top of the manhole be raised to grade. 2. The Montana Power Company gas line under the west end of Conway Drive was discovered during excavation to be offset from the markers. This placed the line under the street and too high. Therefore, the line had to be excavated and lowered. 3. The existing water main under Conway Drive was discovered to lie at a depth much lower than normal, placing it under the new sewer stub to the Highland Park Professional Subdivision. Therefore, the sewer �}-.el. ha.,7 .{-.. h.. .-. ,....�.-.„A ... .............. a... t. ,. ...........'1 .. .... .r.1. n.........a...,..�... a. ..F n. The original design called for no access to the Medical Arts Building from Conway Drive per request of the Medical Arts Board. The Board now has requested two approaches onto Conway from their parking area. S. The Lutheran (tome has requested a 4" water stub approximately Station 9+50 on Claremont Street to serve their proposed addition. The price for the water service was negotiated with the Contractor. CHANGE TO CONTRACT PRICE: ORIGI;7AL CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDER The CONTRACT PRICE due to this C14A11GE ORDER will be increased by $3,846.17 The new C01ITRACT PRICE including this CHANGE ORDER will be The C011TRACT TIME will be changed by 0 calendar days. The date for completion of all work will be July 19, 1976. $ 3,846.17 $74,448.85 0.00 $78,295.02 , _ THE U17DERSIGNED CONTRACTOR, have given careful consideration to the changes proposed and hereby agree that we will provide all equipment, furnish all materials, except as may be otherwise noted herein, and perform all services necessary for thap.,work specified and will accept as full payment therefore the price shown herein. Accepted by; i Reco_mended' by Date Date 5 - 7 Pi eject Engineer Recommended Approval by: _1 Date S '� Cit Engineer r-pproved : C! 7v - Date Attest:42� Date _