Loading...
B2. South Meadows Drainage ImprovementsPUBLIC WO R_ Date: March 11, 2015 2011" Avenue East PO Box 1997 Kalispell, MT 59903 Thane: 406-758-7720 Fax: 406-758-7831 www.kalispell.com 1public—works MEMORANDUM TOO Doug Russell — City Manager FROM: Keith Haskins -- Senior Civil Engineer CC: Susie Turner, PE — Director of Public Works / City Engineer SUBJECT: South Meadows Drainage Improvements — Phase II MEETING: March 16, 2015 BACKGROUND: The South Meadows Storm Drainage Improvement Project will address and mitigate ongoing drainage issues facing the South Meadows Subdivision by providing a stormwater conveyance system. The project includes installing storm drainage inlets, manholes, storm drainage piping, re -grading ditches, and cleaning culverts. The first phase of construction was awarded to LHC Inc. and completed in 2012. The remaining three unconstructed alternates male up this second phase of construction. This second phase was previously bid in August of 2014, with two responsive bidders. Both bids received were well above the project budget of $300,000 with bids of $413,243.12 (LHC) and $558,136.50 (Knife River). Due to the limited interest in the project and after conversations with bidders, staff concluded that contractors in the valley had too many other active commitments to give the City competitive bids. Therefore, staff recommended rejecting all bids and rebidding the project in the spring of 2015. Council agreed with staff recommendations and the project was shelved to be rebid outside of the underground utility construction season. Bids were opened on Thursday, March 51 2015 at 2:30 pm. out of thirteen prospective contractors who obtained plans for the project; eight responsive bids were received as listed below in the order opened: Contractor Schedule 1 Leighty Bros Const. $105, 180.00 Thompson Contracting $131,342.00 Knife River $161,319.00 S&L Underground LLC $ 76,443.00 Downing Construction $ 68,831.00 Paveco, LLC $10%718-74 JD Russell Excavating $109,791.45 LHC, Inc. $117,774.80 Schedule 2 $1361487-00 $153,916-00 $183,218.00 $112,652.00 $ 999858.00 $1477505.40 $169,306.00 $1431473.96 Schedule 3 $ 96,333.50 $116,396.75 $154,962.00 $ 915969.00 $ 769886.00 $122,420.02 $131,106.95 $119,170.64 Total $3381000-50 $4011654-75 $4999499.00 $2811064.00 $2459575.00 $379,644.16 $410,204.40 $3801419.40 Downing Construction, Inc. was determined to be the low bidder. References for Downing Construction were contacted and interviewed. Downing Construction was determined to be a responsible contractor successfully completing projects of similar size and scope. Doug Russell March 11, 2015 Page 2 STAFF RECOMMENDATION: Award the bid for the South Meadows Drainage Improvement Project — Phase II to Downing Construction in the amount of $245,575.00. ACTION REQUESTED: Motion to award the South Meadows Drainage Improvements — Phase H to Downing. Construction for Schedules 1, 2, and 3 in the amount of $245,575.00. FISCAL IMPACT: This project will be funded by the Storm Sewer Fund (South Meadows Phase II— 5349-453-430246-954). Adequate funding is available for all three schedules of this project. ALTERNATIVES: As suggested by the City Council.