B4. 2nd Ave WN Bid AwardPUBLIC WORK DEPART1VI1 1VT 20115t Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 www.kalispell.com 1public_works MEMORANDUM DATE: April 28, 2015 TO: Doug Russell, City Manager) i5 FROM: Aaron McConkey, PE, Project Manager,�, CC: Susie Turner, PE, Public Works Director-li-tlt SUBJECT: 2nd Ave WN Water Distribution Improvement Project MEETING: May 4, 2015 BACKGROUND: The 2nd Ave WN Water Distribution Improvement Project is a planned capital improvement project replacing deteriorated cast iron water main for two city blocks. The project is located from West Montana Street to West Washington Street along 2nd Ave WN. Approximately 750 linear feet of existing 1930's cast iron water main will be replaced with 8 inch C-900 PVC and 10 inch DR 11 HDPE. Two fire hydrants will be replaced and 8 water services will be reconnected within the public right of way. These improvements will reduce maintenance costs and liability for water main breaks within Montana Department of Transportation rights of way. Bids were received on Thursday April 23, 2015 at 3:00 PM. Three responsive bids were received from local contractors. The bid results follow: Contractor: Total Bid Price LHC, Inc. $196,848.01 Downing Construction, Inc. $200,421.00 Sandry Construction Company, Inc. $214,945.00 Engineer's 2015 Estimate $217,432.71 References for LHC, Inc were contacted and interviewed. LHC, Inc. was determined to be a responsive and responsible contractor successfully completing utility projects in Northwest Montana. STAFF RECOMMENDATIONS: Award the bid for the 2nd Ave WN Water Distribution Improvement Project to LHC, Inc.. ACTION REQUESTED: Motion to award the 2nd Ave WN Water Distribution Improvement Project to LHC, Inc with the execution of the total amount bid for $196,848.01. FISCAL EFFECTS: The total project construction cost will be funded by the Water Fund (5210). Line item 5210-447-430550-967 (2nd Ave WN) has adequate funds for the completion of this project with a current balance of $274,504. ALTERNATIVES: As suggest and approved by the City Council. ATTACHMENTS: Bid Analysis. 2nd Ave WN Water Distribution Improvement Project Bid Opening: April 23, 2015, 3:00 PM Number of Addendums: 0 PUi3LIC WOR1{�£PARTM£NT Bidder Identification Prices H D O b W b N t7 O p Name of Bidder Address Phone Number Base Bid Total LHC, Inc. PO Box 7338 758-6420 $196,848.01 $196,848.01 X X X n/a Kalispell, MT 59901 Downing Construction, Inc. 32194 Outer Highway 10 South 909 797 7444 $200,421.00 $200,421.00 X X X n/a Redlands, CA 92373 Sandry Construction Company, Inc. 200 Basin View RoadBigfork, 752-2419 $214,945.00 $214,945.00 X X X n/a MT 59911 Engineer s Estimate $217,102.71 $217,102.71 2nd Ave WN Water Main Replacement - West Washington St to W. Montana Street Engineer's Estimate LHC Inc. Downine Construction Inc. Sandry Construction Co. Inc. No. neserintinn 11n4 1lnandty 11n4 Priee Tntnl PA- unit PA- T-I PA- rto;t D.;..n 'r-i 0.;- IT.;. D.;..o -I -- I Mobjn ization/Demobilizatio(10Y LS 1 $19,766.61 $19,766.61 $12,880.00 $12,880.00 $10,000.00 $10,000.00 $10,000.00 $10,000.00 2 Construction Traffic Control LS 1 $10,000,00 $10,000.00 $5,390.00 $5,390.00 $2,500.00 $2,500.00 $7,000.00 $7,000.00 3 Construction Survey LS 1 $4,000.00 $4,000.00 $6,645.00 $6,645.00 $1,800.00 $1,800.00 $2,875.00 $2,875.00 4 8" C-900 PVC Water Main LF 636 $75.00 $47,700.00 $59.85 $38,064.60 $103.00 $65,508.00 $63.00 $40,068.00 5 6" C-900 PVC Water Main LF 20 $65.00 $1,300.00 $87.24 $1,744.80 $120.00 $2,400.00 $59.00 $1,180.00 6 10" DR-11 HDPE Water Main LF 120 $275.00 $33,000.00 $141.09 $16,930.80 $99.00 $11,880.00 $154.00 $18,480.00 7 12" SDR 35 PVC Storm Sewer LF 15 $45.00 $675.00 $92.82 $1,392,30 $135.00 $2,025.00 $124.00 $1,860.00 8 8"M.IGate Valve Each 6 $2,000.00 $12,000.00 $1,812.00 $10,872.00 $1,535.00 $9,210.00 $2,174.00 $13,044.00 9 6" MJ Gate Valve Each 2 $1,500.00 $3,000.00 $1,377.00 $2,754.00 $1,171.00 $2,342.00 $1,804.00 $3,608.00 10 Fire Hydrant Each 2 $4,250.00 $8,500.00 $4,108.00 $8,216.00 $3,300.00 $6,600.00 $4,266.00 $9,532.00 11 8" x 6" MJ Swivel Tee Each 2 $1,200.00 $2,400.00 $707.00 $1,414.00 $1,067.00 $2,134.00 $1,033.00 $2,066.00 12 8" MJ Tee Each I $1,200.00 $1,200.00 $687.00 $687.00 $755.00 $755.00 $1,090.00 $1,090.00 13 8" MJ Bend Each 1 $650.00 $650.00 $537.00 $537.00 $621.00 $621.00 $761.00 $761.00 14 8"x 6" M.1 Reducer Each 1 $500,00 $500.00 $477.00 $477.00 $496.00 $496.00 $635.00 $635.00 15 8" x 10" ID Controlled HDPE Adapter Each 2 $1,000.00 $2,000.00 $430.00 $860.00 $1,130.00 $2,260.00 $1,158.00 $2,316.00 16 8" MJ Plug Each 1 $750.00 $750.00 $365.00 $365.00 $457.00 $457.00 $594.00 $594.00 17 6" Water Main Connection Each 1 $1.500.00 $1,500.00 $2,140.00 $2,140.00 $4,106.00 $4,106.00 $2,084.00 $2,084.00 18 8" Water Main Disconnection Each 1 $200.00 $200.00 $2,332.00 $2,332.00 $3,837.00 $3,837.00 $3,354.00 $3,354.00 19 3/4" Residential Service Each 3 $300.00 $900,00 $3,812.00 $11,436.00 $1,716,00 $5,148.00 $1,976.00 $5,928.00 20 3/4" Commercial Service Each 3 $200,00 $600.00 $2,213.00 $6,639.00 $1,100.00 $3,300.00 $1,104.00 $3,312.00 21 1 " Service Commercial Connection Each 1 $2,750.00 $2,750.00 $567.00 $567.00 $1,2.53.00 $1,253.00 $1,259.00 $1,259.00 22 1 1/2" Commercial Service Connection Each 1 $2,500.00 $2,500,00 $3,357.00 $3,357.00 $1,843.00 $1,843.00 $1,859.00 $1,859.00 23 Remove and Replace 48" Concrete Storm Manhole Each 1 $4,000.00 $4,000.00 $2,875.00 $2,875.00 $4,983.00 $4,983.00 $4,545.00 $4,545.00 2nd Ave WN Water Main Replacement - West Washington St to W. Montana Street Engineer's Estimate LHC Inc. Downing Construction Inc. Sandry Construction Co. Inc. Nn_ n--infirm Unit Tlnnnfifv IWf PA'. Tnfnl PA- Unit Pri- T-1 P�;rn rinif PA- Tnful PA- Tln;f ➢A- T-1 VA,. 24 Plowable Fill Crossing Each 1 $840,00 $840.00 $1,559.00 $1,559.00 $590.00 $590.00 $1,191.00 $1,191.00 25 Type H Bedding LF 50 $7.00 $350.00 $6.67 $333.50 $8.00 $400.00 $4.00 $200.00 26 Asphalt Removal SY 900 $11.50 $10,350.00 $9A3 $8,667.00 $8.00 $7,200.00 $9.00 $8,100.00 27 Concrete Flatwork Removal SF 134 $2.65 $355.10 $5.00 $670.00 $9.00 $1,206.00 $10.00 $1,340.00 28 Concrete Curb Removal LF 90 $4.50 $405.00 $8.53 $767.70 $9.00 $810.00 $21.00 $1,890.00 29 Fire Hydrant Removal Each 2 $750.00 $1,500.00 $955.00 $1,910.00 $500.00 $1,000.00 $736.00 $1,472.00 30 Valve Box Removal Each 4 $450.00 $1,800.00 $236.00 $944.00 $350.00 $1,400.00 $736.00 $2,944.00 31 4" Asphalt Roadway Restoration SY 900 $35.00 $31,500.00 $36.34 $32,706.00 $38.00 $34,200.00 $55.00 $49,500.00 32 4" Concretete Flatwork SF 134 $9.00 $1,206.00 $20.25 $2,713.50 $8.00 $1,072.00 $18.00 $2,412.00 6" Concrete Flatwork SF 20 $15.00 $300.00 $44.64 $892.90 $30.00 $600.00 $30.00 $600.00 33 ADA Truncated Dome Panel Each 2 $275,00 $550.00 $237.00 $474.00 $400.00 $800.00 $259.00 $518.00 34 Concrete Curb LF 91 $35.00 $3,185.00 $4727 $4,301.57 $51.00 $4,641.00 $33.00 $3,003.00 35 Concrete Curb and Gutter LF 8 $25.00 $200.00 $75A3 $603.44 $68.00 $544.00 $52.00 $416.00 36 LandsacpeResporation Lump Sum 1 $5,000.00 $5,000.00 $1,730.00 $1,730.00 $500.00 $500.00 $4,909.00 $4,909.00 Total $217,432.71 $196,848.01 $200,421.00 $214,945.00