10-28-14 ARC MinutesMINUTES
ARCHITECTURAL REVIEW COMMITTEE
DATE: Tuesday, October 28, 2014; 7:30 a.m.
Kalispell City Hall, 201 1" Ave E
MEMBERS PRESENT: Mark Norley (Chairman); David Koel; John Hinchey;
Bill Goodman; Janet Clark; Russ Skelton
OTHERS PRESENT: City Staff —PJ Sorensen; Tom Jentz
Guests —2 guests in attendance
Hear the Public: None
Approval of Minutes: Janet moved to approve the October 14 minutes; John seconded.
Approved 6-0.
Old Business: None
New Business:
Three Rivers Bank — 233 E Idaho; new wall sign. David recused himself. Metal sign
on the north wall. Bill moved to approve; John seconded. Approved 5-0.
Historic Jail Renovation — 800 S Main; renovations and addition. David recused
himself. Two story addition on the east side. Includes variation on south building roof.
Glass connection. Separate look due to historical society requirements. Don't match
exactly — match the old courthouse more than the jail. Materials are close to the same.
Discussed south wall area and wall by the yard. Need color rendering. Discussed
chimney and gable features. Bill moved to table; Janet seconded. Motion passed 5-0.
Other Discussion:
Three Rivers Bank — color change during construction; David recused himself. Russ
moved to approve the change; John seconded. Approved 5-0.
Verizon — sent an email with a question regarding a pole on the roof with a small dish for
communications between stores. The committee would want to know some specifics
regarding the pole, location on the building, and the size of the dish.
Next meeting will be November 12 (Wednesday)
Meeting Adjourned at 9:00 a.m.