03. Public HearingsAgenda -December 15,1997 AGENDA ITEM 3 - PUBLIC HEARINGS BACKGROUND/CONSIDERATION: As previously discussed, we received verification of receipt of a $400,000 HOME Grant for additional improvements to the Samaritan House. This hearing and amendment to the budget is required to allocate those funds. B. BUDGET AMENDMENT HEARING-FEMA GRANT BACKGROUND/CONSIDERATION: As previously discussed, we received a verification (and the check from FEM[A) of reimbursement of flood damage 1 expenditures ($43,510). This hearing and amendment to the budget is required to allocate those funds. C. BUDGET AMENDMENT HEARING -CLARIFICATION OF TOTAL BUDGET BACKGROUND/CONSIDERATION: I have enclosed a list of potential expenditures that have either been budgeted in this year's budget or are currently identified in the Capital Improvement Plan. This does not include all of the needed expenditures within the TIF area. As an example, extensive Storm Sewer Improvements are not considered in this list. The basic question seems to be: Can we use $2.5 million for other expenditures? My answer is an unqualified yes - but the priorities and goals of the City were set by the t Agenda -December 15, 1997 Council and Central School Museum was one of the top priorities. The City needs far outweigh the funds available from our budget, TIF funds, or any other sources. The staff, not because we like to spend money, but because of the major needs of this City, can fill the expenditures for TIF funds for many years. (The Mayor -Elect had requested this information. As per our policy, I am including the information for everyone.) TIF PROJECTS - PUBLIC WORKS FY 1998 Budget ' Traffic Signals 1" Ave East & Center $220,000 l'Ave E & Yd St East Center & 5'b Ave West Phase I $70,000 Center & 3" Ave West (crosswalk) $70,000 Sidewalks $100,000 Chipseal $120,000 9'b St West Storm Sewer Improvements $90,000 Design in house and contract for construction of 3 blocks 8" storm sewer in 9thSt. West with catch basins at 2", 3`d and 4"' Aves. Total FY98 TIF Projects $670,000 CAPITAL IMPROVEMENT PROJECTS Sidewalk Improvements $100,000 Chipseal/Overlay $120,000 6' St Water Main improvements $125,000 Replace 1500' cast iron water main on 6'b St. to Main St. to 1" Ave. East 6'b Ave. West to 9'e Ave. West (TIF ends at 7" Ave. West) Main Street Water Main Replacement $225,000 Replace main along Main Street from Center to Washington Manhole Rehab - Rehabilitate 12 brick manholes $15,000 Various locations Manhole Replacements - Replace manholes at $40,000 5'b Alley East & 56' Street 4'b Alley East & 2nd Street 1" Alley East Trench less Sewer Main rehab $140,000 Slip line 350' of 10" and 350' of 15" Sanitary Sewer main in l' Alley East from l" to 3'd St. J Solid Waste Building Expansion $10,000 Expand east end of building for additional stall