Loading...
2. Ordinance 1748 - Planned Unit Development - Captain's Marine - 1st Readingix _$ 1� �,' "„ri a� y i •'€`'._;ems a� el* �sr;f ° 1•�y r sJ ''� r?-g � �-� �r a}' My `y c � r F �'� .�,. E ♦r`,y �.� �' � '�2t IL .. .�" October 31, 2014 Mayor Mark Johnson Kalispell City Council 201 First Avenue East Kalispell, MT 59901 Re: Ordinance 1748 -- Planned Unit Development -- Captain's Marine --1st Reading Dear Mayor and City Council: our client Randell Seyfert, the owner of Captain's Marine, is asking for a continuation of the PUD review hearing. Mr. Seyfert will not be available November 3 or November 17 for the regularly scheduled City Council Meetings. This project is very important to hire and Mr. Seyfert wants to provide his personal input to the City Council; we would request to move our hearing to December 1, 2014. Sir M APEC, Inc. Enclosures Cc: Randell Seyfert \\SKYWALKER\Projects�—APECJobs\Seyfert Randell- Captains Marine - PUD-140612\Design\Civil\bocuments\APEC Letter To mayor and council.doc APEC, Inc. A Civil Engineers A I I I Legend Trail, Kalispell, MT 59901 Tel 406.755.1333 Fax 406.755.1310 www.APEC--MT.com PLANNING FOR THE FUTURE, REPORT TO: FROM: SUBJECT: MEETING DATE: r1 Doug Russell, City Manager`° Kevin LeClair, Senior Planner Planning Department 201 1" Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kafispeil.com/planning KPUD 14-02 - Request for Planned Unit Development for Boat and Trailer Sales and Repair Facility November 3, 2014 BACKGROUND: The request from Somer's Bay Trading Company LLC, d.b.a. Captain's Marine, is for a Planned Unit Development for a boat and trailer sales and repair facility, and associated boat storage buildings. The development is intended to occur in three phases. Phase 1 includes the construction of a boat and trailer sales facility consisting of 14,900 square feet of sales, offices, and service areas on the main floor and 1,800 square feet of offices on the second level. Phase 2 includes construction of either one or two wood -framed, metal -sided boat storage buildings and the demolition of several existing residential structures on the property. Phase 3 includes the construction of another boat storage building. The 9.7-acre site is located at 3215 Highway 93 South, on the east side of Highway 93 South approximately 650 feet south of the intersection with the Highway 93 Alternate Route. The property can be legally described as Tract 7C in the northwest quarter of Section 33, Township 28 North, Range 21 West, P.M.M., Flathead County, Montana. Tract 7C was annexed by the city in 2008, as part of the Gardner Investments LLC annexation and PUD. The annexation and PUD included a total of 9 tracts of land covering 81.6 acres on the east side of Highway 93 South, from Lower Valley Road to Snowline Lane. An initial zoning designation of B-5/PUD was assigned. The PUD placeholder that was approved bound the properties in the annexed area to a requirement for a future PUD application. The future PUD application would ensure the annexed area would be developed as an integrated commercial -industrial business park for the south end of Kalispell, rather than in a disconnected, piecemeal fashion. The Kalispell City Planning Board met on September 9, 2014, and held a public hearing to consider the request to develop the boat and trailer sales and repair facility. At the public hearing, staff recommended approval of the PUD for the development on the eastern 3.7 acres of the property. The staff recommendation included a condition that any future development beyond the initial phase would require a subsequent full PUD application, due to a lack of information regarding the future phases intended for the rest of the property. At the meeting, it was agreed that it would be preferable for the PUD to cover the entire site, so the planning board voted to continue the matter to their next regular meeting on October 14, 2014. In the intervening time, the owner's engineer submitted a plan illustrating the three -phases of development described above. At the October 14, 2014, meeting, staff recommended approval of the PUD subject to 22 conditions of approval in the staff report, along with a staff -initiated amendment to one of the conditions. Both the owner and the owner's engineer addressed the Board and requested several modifications to the conditions of approval. The Board held a lengthy discussion of the proposal and the conditions of approval. The main discussion focused on Condition #l, which reserves a "no -build area" on the property in anticipation of a future extension of United Drive. In the course of the discussion, the staff -requested an amendment to add a waiver of protest to a potential future special improvement district to Condition #1 which was approved by the board on a vote of 6-1. The discussion continued and a motion was made to add Condition #23, to deviate from the off-street parking design standards that require asphalt or concrete and instead allow the use of crushed asphalt for temporary parking and outdoor storage areas within the no -build area specified in Condition #1. The motion to add Condition #23 was approved by the board on a vote of 5-2. After some additional discussion, the board voted to forward the proposal with the amended conditions to the city council with a positive recommendation on a vote of 5-2. RECOMMENDATION: It is recommended that the Kalispell City Council approve the Planned Unit Development with the 23 conditions of approval, as amended. FISCAL EFFECTS: Approval of the request will have minimal fiscal impact to the city. ALTERNATIVES: Deny the request. Respectfully submitted, Kevin LeClair Senior Planner Report compiled: October 29, 2014 c: Theresa White, Kalispell City Clerk Somers Bay Trading Company, LLC, 120 Vista Drive, Bigfork, MT 59911 ORDINANCE NO.1748 AN ORDINANCE TO AMEND SECTION 27.02.010, OFFICIAL ZONING MAP, CITY OF KALISPELL ZONING ORDINANCE, (ORDINANCE NO. 1677), BY ATTACHING A PLANNED UNIT DEVELOPMENT OVERLAY ON CERTAIN REAL PROPERTY CURRENTLY ZONED B-5 (INDUSTRIAL/COMMERCIAL), MORE PARTICULARLY DESCRIBED AS TRACT 7C IN THE NORTHWEST QUARTER OF SECTION 33, TOWNSHIP 28 NORTH, RANGE 21 WEST, P.M.M., FLATHEAD COUNTY, MONTANA, IN ACCORDANCE WITH THE KALISPELL GROWTH POLICY 2020, AND TO PROVIDE AN EFFECTIVE DATE. WHEREAS, Somers Bay Trading Company LLC, d.b.a. Captain's Marine, petitioned the City of Kalispell that a Planned Unit Development overlay be attached to the current B-5 zoning classification on the above described tract of land, and WHEREAS, the property is located east of Highway 93 South, south of Lower Valley Road, and north of Snowline Lane, and WHEREAS, the petition of Somers Bay Trading Company LLC was the subject of a report compiled by the Kalispell Planning Department, Staff Report #KPUD-14-01, in which the Kalispell Planning Department evaluated the petition and recommended that a Planned Unit Development overlay be attached to the property as described above, pursuant to Kalispell City Code 27.29.020, and WHEREAS, the Kalispell City Planning Board held Public Hearings on the matter on September 9, 2014 and October 14, 2014, and recommended that a Planned Unit Development overlay be attached to the current City B-5 zoning, pursuant to Kalispell City Code 27.29.030, and WHEREAS, after considering all the evidence submitted on the proposal to attach a Planned Unit Development overlay to the described B-5 zoning, the City Council finds such zoning to be consistent with the Kalispell Growth Policy 2020 and adopts, based upon the criterion set forth in Section 76-3-609, M.C.A., and State, Etc. v. Board of County Commissioners, Etc. 590 P2d 602, the findings of fact of KPD as set forth in Staff Report No. #KPUD-14-01. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, AS FOLLOWS: SECTION 1. Section 27.02.010, of the Official Zoning Map of the Kalispell Zoning Ordinance, (Ordinance No. 1677) is hereby amended by designating the property described above as B-5, Industrial/Commercial, with a Planned Unit Development overlay. SECTION 2. The Planned Unit Development proposed by Somers Bay Trading Company LLC upon the real property described above is hereby approved, subject to the following conditions: General Conditions: 1. In accordance with the Kalispell Growth Policy and the Planned Unit Development provisions in the Kalispell Zoning Ordinance, an area sixty (60) feet wide extending south from the north -south access easement (United Drive) to the southern property boundary shall be kept free of any structural development until such time that future development warrants construction of a roadway in this location per the Kalispell Standards for Design and Construction. A "No Protest To a Special Improvement District" for roadway s required to be constructed as a result of future development shall be signed and submitted by the owner. 2. Phase 1 of the development of Tract 7C shall substantially comply with the following site plan and elevations submitted as part of the Planned Unit Development application (with exceptions noted below): A. Proposed Site Plan dated October 6, 2014, prepared by APEC Engineering B. Renderings of the Captain's Marine boat/trailer sales facility dated June 26, 2014, prepared by R Porch Construction Exceptions: a) A fire hydrant shall be located at the northern terminus of the waterline on the northwest corner of the property, where none is currently shown. b) Separate water service line and fire suppression water lines shall be installed, where only one line is shown at this time. c) One or more fire hydrants shall be installed to provide fire protection for the existing storage building and the existing workshop building on the eastern portion of the property as determined by the Kalispell Fire Chief and Kalispell Public Works. d) The water main to supply the hydrant will need to be placed in an easement location that is reviewed and approved by Kalispell Public Works. 3. To ensure adequate fire protection of the three residential structures on the eastern portion of the property, the property owner shall, in coordination with the Kalispell Fire Department, re -address the residences and provide access and address-signage for the residences from United Drive on the north side of the property. 4. Phase 2 of the development plan shall substantially comply with the Proposed Site Plan dated October 6, 2014, but shall be modified so that any the proposed storage buildings shown in Option A or Option B are located 20 or more feet from the western edge of the extension of the 60-foot wide north -south access easement specified in Condition #1. 5. Phase 3 of the development plan shall substantially comply with the Proposed Site Plan dated October 6, 2014, but shall be modified so that the proposed storage building is located 20 or more feet from the eastern edge of the extension of the 60-foot wide north - south access easement specified in Condition #1. 6. The permitted and conditional uses for Tract 7C are restricted to B-5 uses including retail sales and service. 7. The property owner shall maintain the landscaping on their property and from their property line to the adjacent street or highway travel surface of Highway 93 South as applicable. 8. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. Prior to the issuance of a building permit: 9. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. 10. The proposed site plan for Phases 1, 2, and 3 of the Captain's Marine PUD is required to be submitted to the Kalispell Site Review Committee for review and approval prior to issuance of a building permit for any structural development. Approval of this PUD does not convey or grant any specific authorization or project pre -approvals relative to the duties of the Site Review committee. 11. For each phase of development, a landscape plan shall be submitted to the Parks and Recreation Department for review and approval. The landscape plan shall include an irrigation plan and specify tree and shrub type and size at the time of planting for the parking areas, areas around the building and adjacent right-of-ways. Street trees shall specifically be required in a landscaped boulevard along the west side of the property adjacent to Highway 93 South. All areas of the site not proposed for structural development, parking, and access shall be addressed with some level of landscape treatment. 12. A pedestrian/bike path plan shall be provided to the Parks and Recreation Department and Public Works Department for review and approval. The plan shall show the location of the bike path at the outermost edge of the Highway 93 R/W adjacent to Tract 7C. Note: An asphalt bike trail shall have a minimum width of 10 feet; a concrete bike trail shall have a minimum width of 8 feet. 13. All improvements shall be completed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards; and shall be certified by an engineer licensed in the State of Montana. All work shall be reviewed and approved by the Kalispell Public Works Department prior to construction. 14. Water and sewer main extensions shall be reviewed and approved by the Kalispell Public Works Department prior to installation. 15. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water management plan that meets the requirements of the current city standards for design and construction. The approved storm water management plan for on -site facilities shall be completed prior to the issuance of a building permit. 16. The proposed structure for the Captain's Marine Boat and Trailer Sales and Repair Facility is required to be submitted to the Kalispell Architectural Review Committee prior to issuance of a building permit. Approval of this PUD does not convey or grant any specific authorization or project pre -approvals relative to the duties of the Architectural Review committee. 17. The proposed storage buildings depicted on the Proposed Site Plan, dated October 6, 2014, and the Typ. Storage Building Elevations, dated October 6, 2014, are required to be submitted to the Kalispell Architectural Review Committee prior to issuance of a building permit. Approval of this PUD does not convey or grant any specific authorization or project pre -approvals relative to the duties of the Architectural Review committee. Prior to the issuance of a certificate of occupancy: 18. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that all water and/or sewer lines have been installed per the approved plan. 19. Any on -site storm water management facilities shall be installed per the approved plan. 20. All landscaping shall be installed per the approved landscape plan. 21. The bike trails shall be installed per the approved plan. 22. The property owner of Tract 7C shall obtain the appropriate permit for the approaches onto Highway 93 and receive an approval from MDT on the completion of conditions or requirements attached to the approach permit. The approved approach permit and MDT approval shall be submitted to the Kalispell Planning Department. 23. A variance is granted to allow the use of recycled asphalt for parking and boat storage and on the non -circulation areas in the 100 foot no -build area. SECTION 3. The balance of .Section 27.02.010, Official Zoning Map, City of Kalispell Zoning Ordinance not amended hereby shall remain in full force and effect. SECTION 4. This Ordinance shall take effect from and after 30 days of its passage by the City Council. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL, MONTANA, THIS DAY OF , 2014. ATTEST: Theresa White City Clerk Mark Johnson Mayor Captain's Marine PUD PLANNED UNIT DEVELOPMENT REVISED STAFF REPORT #KPUD-14-01 KALIStPELL PLANNING DEPARTMENT OCTOBER 14, 2014 A report to the Kalispell City Planning Board and the Kalispell City Council regarding a request from APEC Engineering, on behalf of Somer's Bay Trading Company LLC, d.b.a. Captain's Marine, for a Planned Unit Development for a 3-phase development of a boat and trailer sales facility consisting of 14,900 square feet of sales, offices, and services areas on the main floor and 1,800 square feet of offices on the second level; and several wood - framed, metal -sided boat storage buildings. A public hearing was held with the Planning Board on September 9, 2014, in the Kalispell City Council Chambers. At the close of public hearing, the Planning Board refrained from making a recommendation to the Kalispell City Council for final action, but rather forwarded the request back to staff and the applicant for further information and review. The request is now being considered by Planning Board at their regular meeting scheduled for October 14, 2014. BACKGROUND INFORMATION: In November 2008, the Kalispell City Council approved the annexation of 9 tracts of land located east of Highway 93 South, south of Lower Valley Road, and north of Snowline Lane. The PUD placeholder zoned the properties B-5, Industrial Commercial and bound them to a future PUD application. The annexation and PUD placeholder were referred to as the Gardner Investments PUD. The Captain's Marine PUD application involves a portion of one of the southern tracts of the Gardner Investment PUD placeholder, referred to as Tract 7C. The B-5/PUD placeholder zoning is intended primarily to accommodate a variety of business, warehouse, and light -industrial uses in an industrial -commercial park development. Planned unit developments are intended to serve as an overlay zoning district that functions in concert with the underlying zones to provide a comprehensive, integrated development plan which will serve to modify the underlying zone and guide future development. The PUD provides for flexibility in the subdivision standards and architectural designs standards, where appropriate, to preserve and enhance the integrity and environmental values of the area. The PUD placeholder is typically involved with annexations and initial zoning requests and notes the applicant's intent to develop a full PUD application at a later date. The Captain's Marine PUD replaces the Gardner Investments placeholder PUD for Tract 7C. A. Owner: Somers Bay Trading Company LLC d.b.a. Captain's Marine 120 Vista Drive Bigfork, MT 59911 406-755-2666 Technical Assistance: APEC Engineering 111 Legend Trail Kalispell, MT 59901 406-755-1333 Figure 1: Vicinity Map Aerial (Google Earth, July 2013) Captains Marine PUD KPUD-14-01 Paste 2 of 14 B. Overall Project Description: The PUD is being proposed to be developed in three phases. The first phase involves development of a boat and trailer sales facility consisting of 14,900 square feet of sales, offices, and services areas on the main floor and 1,800 square feet of offices on the second level. The facility is proposed for the western 500 feet of the property and includes two accesses onto Highway 93 South; the boat sales and repair facility; parking for customers, employees, boats, and trailers; driving surfaces; landscaping; a multi -use path along the highway frontage; lighting; and signage. This constitutes approximately 3.7 acres of the overall site. East of the main 3.7-acre, phase 1 area, the applicant is proposing to pave additional accesses to an existing storage building, existing workshop, and the three existing residences. A stormwater management facility is proposed to be located in a slightly depressed area east of the existing storage building, existing workshop, and septic drainfield on the property. Phase 2 calls for the removal of the residential structures and their associated septic drainfields; and the development of one of two options: - Option A includes two separate wood -framed, metal -sided storage buildings (30' x 140' and 30' x 200) on the north and south property lines, or - Option B includes a single wood -framed, metal -sided storage building (100' x 2001 in the approximate center of the property. Phase 3 calls for the development of another storage building (30' x 2001 along the northern property boundary and associated paving. In the revised submittal, dated October 6, 2014, the applicant is requesting a deviation from Kalispell Zoning Code design standards for off-street parking that pertains to the paving of off-street parking and access areas with either asphalt, concrete, or a comparable permanent hard surface (KMC 27.24.030 (4)). The applicant is requesting to use crushed asphalt outside of the parking and access areas for exterior boat and trailer storage. Figure 3: Rendering of phase 1 - Proposed boat sales facility, NW view (Porch Construction) Captains Marine PUD KPUD-14-01 Page 3 of 14 :5 d-.:aucr acrtsz a-u>s;�.'#-AT2r'D9AY��F rws¢E mA fts n ITT m 'xf:S£sMA 4Y1� tAoRrMK6 .. .( tce "IM41 SIMI ..------r--r7 6 _ In� TTT- r_'j- ID4V.Si� `JDy a x.9XPiP.tiA t t �usonza �r�a � saMYsM M � � ' tx e4tA",£+ AFyi`xi4Er,:, s�es.,a�-tea E wY +Rd �E ;cuw "� -..•..,,,, PHASE 3-161=, j.•e.ay.8'e�ta- &$cst rv�t 8avz'N6 � U 7 PrtasE z • zo:-r Rfrns.:. PHASE S-20.0 tc�ax #1Crt� +i+ra'r.. un�r�u�a c.rz ,s K*$54d�3RtA r�a(iri 49 iF:4t9F3� Figure 4: Proposed Site Plan (APEC Engineering) C. Location and Description of Property: The Captain's Marine site is located at 3215 Highway 93 South and can be legally described as Tract 7C in the northwest corner of Section 33, Township 28 North, Range 21 West, P.M.M., Flathead County, Montana. The property is 9.7 acres in size with 330 feet of frontage on Highway 93 South and a depth of 1280 feet. Figure 5: Site aerial of existing conditions (Google) The eastern half of the property contains multiple structures, containing the following uses, from north to south: a carport, two residential structures, a storage building, a workshop, and another residence. The driving and parking surfaces around the structures are gravel. The western half of the property is undeveloped, Captains Marine PUD KPUD-14-01 Page 4 of 14 except for an asphalt driveway from Highway 93 South to the southern residence and workshop structures. There is also an unpaved, gravel/dirt driving path north of the paved driveway. The western 500 feet of the property is where the proposed boat and trailer sales and repair facility is planned to be located. The property is level for most of its area. East of the developed structures, the elevation drops approximately five feet. Further east, the property drops another 15 to 20 feet in elevation and contains a surface water channel/slough that appears to have been formed by an historic meander bend of the Flathead River. D. Lusting Land Use and Zoning: As stated above, the property is zoned B-5/PUD. The Kalispell Zoning Ordinance describes the intent of the B-5 Industrial Business zoning districts as: "A zoning district intended primarily to accommodate a variety of business, warehouse, and light -industrial uses and incorporating these uses into an integrated design for compatibility. Compatibility issues may be addressed through development of an industrial -commercial park development or through a planned unit development (PUD) overlay zoning district. Such uses would typically not create objectionable characteristics (such as dirt, noise, glare, heat, odor, smoke, etc.) which extend beyond lot lines. This district should be located near major arterials or rail services. This zoning district would typically be found in areas designated as industrial or urban mixed use on the Kalispell Growth Policy Future Land Use Map." (KMC 27.15.010) The B-5 zoning district permits a wide variety of commercial and light industrial uses, including boat and trailer sales and repair facilities and warehousing. Residential uses are not permitted in the B-5 zoning district. Any existing uses lawfully established on the property prior to the annexation and adoption of the initial zoning, shall be allowed to remain in accordance with the non -conforming uses statutes contained in the Kalispell Zoning Ordinance section 27.23.030. E. A41acent Land Uses and Zoning: North: A hardwood flooring business, a heavy equipment repair business and mini -storage; County I-lH zoning; and a 60-foot wide segment of gravel road/access easement zoned City B-5/PUD East: Agricultural; County I-1H zoning South: Scattered industrial/commercial uses with individual highway access driveways; County I-1H zoning. West: Mini -storage and U-Haul Rental; County I-1 H zoning F. General Land Use Character: The area of the proposed development can be described as a mixture of commercial and light -industrial uses with a dependence on convenient and visible access to the arterial roadway system. This description holds true especially to the north and west of the property, where commercial businesses have developed and expanded around the intersection of Highway 93 South and the intersection of the newer, Alternate Highway 93 (Kalispell Bypass). The area to the south is somewhat less developed but each of the properties is being put to some combination of commercial, industrial, and residential use, similar to the subject property. One of the defining characteristics of the area is the number of individual Captains Marine PUD KPUD- 14-01 Page 5 of 14 driveways and the scattering of multiple structures on narrow and relatively deep properties. This lot configuration and land use pattern makes the efficient use of the properties challenging as one gets further from the highway and presents access difficulties onto the highway frontage when multiple driveways are close together. There is a shared access easement running east -west north of the property that provides vehicular access to the east of the lots that front the highway. This shared access easement connects to another access easement that runs north - south. This 60-foot wide, north -south easement is part of the original Gardner Investment PUD placeholder and connects to the property's northern boundary. This easement area and its connection to the property tie this property to the overall Gardner Investments PUD placeholder. Kalispell's Future Land Use Map indicates a roadway running parallel one block east of Highway 93. This roadway is consistent with this north -south access easement and would provide local street access to the off -highway portions of the properties. The Kalispell Planning Board, in their October 2008 discussion regarding the annexation, referenced this roadway as an important roadway for creating a grid road system. Other than the private driveways on the east side of Highway 93, the nearest public roadway intersection on the east side of Highway 93 South is United Drive, 1,300 feet to the north of the property between the existing Mergenthaler Transport business and the recently constructed Fred's Appliance retail establishment. The nearest roadway to the south is Snowline Lane, which is approximately 1,000 feet to the south. As stated above, the Kalispell Growth Policy and its Future Land Use Map indicate a desire to develop a coordinated roadway and system of shared access points onto Highway 93 South, likely using United Drive and Snowline Lane, and an off -highway collector roadway to serve the eastern half of the properties along Highway 93 South. G. Utilities and Public Services: Sewer: City of Kalispell (adjacent to the property in the Highway 93 right-of-way) Water: City of Kalispell (approximately 175 feet south of the property on the east side of Highway 93 right-of-way) Refuse: Private contractor Electricity: Flathead Electric Cooperative Gas: NorthWestern Energy Telephone: CenturyTel Schools: School District #5 Fire: Kalispell Fire Department Police: City of Kalispell H. EVALUATION OF THE PLANNED UNIT DEVELOPMENT PROPOSAL: Criteria for the Creation _of a Planned Unit Develovment IPUDI District The following information and evaluation criteria are from Sections 27.21.020(4), of the Kalispell Zoning Ordinance. The intent of the planned unit development district is to serve as an overlay zoning district. The district shall function in concert with one or more of the underlying zones to provide a comprehensive, integrated development plan Captains Marine PUD KPUD-14-01 Page 6 of 14 which will serve to modify the underlying zone and, where appropriate, subdivision standards with the intent of providing flexibility of architectural design and density as well as providing the option to mix land uses and densities while preserving and enhancing the integrity and environmental values of an area. Review of Application Based Upon PUD Bvaluation Criteria: The zoning regulations provide that the planning board shall review the PUD application and plan based on the following criteria: 1. The compliance of the proposed PUD with the city growth policy and in particular the density and use policies of the plan; The proposed PUD is located within an area designated as "urban mixed use" on the City of K dispell's Growth Policy Future Land Use Map. The Growth Policy calls for expanding "the depth of urban highway commercial areas as mixed -use corridors, in order to provide an alternative to continued linear commercial development, to concentrate more intensive uses along traffic arterials, to improve business district circulation and transportation efficiency areas, by secondary street access, to provide flexibility for larger development sites, and to expand small business opportunities." The Growth Policy continues, "Within these corridor areas, provide for higher - intensity, mixed -use areas roughly two blocks on both sides of urban highways." The proposed PUD complies with the Growth Policy in terms of urban mixed use of the site because it is developing a more intensive use along the highway frontage, while utilizing the area to the east for future depth of the highway commercial area. The proposed development pattern should provide for efficient development of the relatively narrow, deep lot, and potentially allow for future extension and development of a secondary roadway system parallel to the higher speeds and congestion of the highway itself. At this time the proposal provides east -west vehicular access by traveling through the parking areas on the property. The proposal does not provide for a reasonable extension of the north -south axis depicted on the Kalispell Growth Policy Future Land Use Map, implied by the Gardner Investments annexation and PUD placeholder, and emphasized by the Kalispell City Planning Board in 2008. 2. The extent to which the PUD departs from the underlying zoning and the reasons why such departures are or are not deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; The applicant is requesting a departure from one provision of the Kalispell Zoning Ordinance with regard to the paving of all parking and access areas with asphalt, concrete, or a comparable permanent hard surface (KMC 27.24.030 (4)). The request is that exterior boat and trailer storage, outside of the parking and travel lanes, would be surfaced with a crushed asphalt material. No additional information was provided that substantiates why this deviation would be in the public interest or how this deviation would be mitigated by other measures in the Captains Marine PUD KPUD-14-01 Page 7 of 14 PUD proposal. The provision for paving of parking and travel lanes is intended to maintain air quality within Kalispell and Flathead County, which can be deteriorated with vehicle traffic on unpaved surfaces. The standard treatment of areas that are not developed with structures, parking, or access areas is to provide landscaping that contributes to neighborhood aesthetics, conserves environmental quality, and provides areas for stormwater interception and infiltration. 3. The extent to which the PUD departs from the subdivision regulations (if subdivision is anticipated) and the public works standards for design and construction applicable to the subject property, the reasons why such departures are deemed to be in the public interest, and the mitigating conditions that the PUD provides to address the deviations; The applicant is not proposing to subdivide the property. No departures from the subdivision regulations or public works standards for design and construction have been requested. As a single development on the property, the City of Kalispell Standards for Design and Construction require that water and sewer services be brought up to the building and be sized appropriately for the water usage and fire suppression requirements of the developed portion of the property. For phase 1, the Standards require extension of the water main to the northwest corner of the property to facilitate a logical development pattern to the north, and ultimately result in a looped system with the subsequent development in the balance of the Gardner Investments PUD. The use of the former Northwestern Truss Company buildings requires that a fire hydrant be located so that the structures can be protected in the event of a fire on or near the property. When Tract 7C was annexed, it was understood by the former owner that a fire hydrant would be installed in order to provide fire protection for the former truss company buildings. This fire hydrant has not yet been installed. (See attached letters to Gardner Investments LLC dated November 5, 2009 and August 27, 2010) The hydrant should be installed to allow fire protection of the existing structures in use on the eastern portion of the property. Phase 2 includes additional development to the east with structures and additional paving. The addition of these structures also requires one or more fire hydrants in order to protect these structures. Fire hydrant placement shall be approved by the Kalispell Fire Chief and meet the Kalispell Standards for Design and Construction. 4. The overall internal integrity of the PUD including the appropriate use of internal design elements, the use of buffers between different land uses, the use of transitions between uses of greater and lesser intensity, the use of enhanced design features to provide connectedness for both vehicle and pedestrian traffic throughout the PUD and the use of innovative and traditional design to foster more livable neighborhoods; This PUD application provides for the appropriate use and development of the Captains Marine PUD KPUD-14-01 Page 8 of 14 western 500 feet of the property with the ability to expand and develop the eastern portion in future phases as needs and plans dictate. Use of the existing elements of the property are allowed to remain in their current status as existing uses that were lawfully established prior to the adoption of the existing zoning on the property. Internal design elements would include a coordinated vehicular circulation system that efficiently serves the subject property, as well as the community as a whole by encouraging shared access points on the highway and a shared, common internal road system. In October 2008, a member of the Kalispell Planning Board, in the discussion of Gardner Investments LLC annexation, initial zoning, and PUD placeholder overlay, stated, that "a grid road system is really important." And, "the existing parallel road... should be extended and other roads should intersect it." Phases 2 and 3 of the proposed site plan will need to be modified slightly to follow through with this and preserve the property owner's long-term investment by allowing for a potential vehicular connection of the property to the north and the south. (See attached Kalispell City Planning Board Minutes of the meeting of October 14, 2014, Page 4 of 5) 5. The nature and extent of the public parks and common open space in the PUD, the reliability of the proposal for maintenance and conservation of these areas and the adequacy or inadequacy of the amount and function of the parks and open space in terms of the land use, densities and dwelling types proposed in the PUD; The applicant is not proposing to provide any public parks or common open spaces. As a commercial development, there is no requirement for such provisions. 6. The manner in which the PUD plan makes adequate provision for public services, provides adequate control over vehicular traffic and furthers the amenities of recreation and visual enjoyment; The PUD is proposing to access public services such as sewer and water by connecting to the sanitary sewer line located in the Highway 93 right-of-way and the water main located approximately 175 feet south of the property, also on the east side of Highway 93, respectively. Kalispell Design and Construction Standards require the water main to be extended to the northern extent of the property so that it may serve further development on the properties to the north. A hydrant should be installed at the terminus of the line. Vehicular circulation on the PUD is served with two access points onto Highway 93. These accesses require review and approval from the Montana Department of Transportation. Access to the area immediately adjacent to the proposed boat and trailer sales and repair building will be a combination of parking lot and a fenced, secured outdoor storage area. Access to the eastern half of the property will be through the fenced, secured area, or by way of the north -south easement that connects to the property's midpoint. No other circulation through and connecting Captains Marine PUD KPUD-14-01 Page 9 of 14 with the overall Gardner Investments PUD placeholder properties has been proposed. Although not required to be developed as a roadway at this time, the property should provide adequate space for a potential future extension of the 60-foot wide access easement from the north property line to the southern property boundary, consistent with the existing easement area that connects the property to the overall PUD. This will not only provide for adequate developable property on Tract 7C, but also enhance the property's integration into the overall mixed -use commercial industrial park concept that was discussed and anticipated at the time of annexation. Any structures should be set back a minimum of 20 feet from this extension of the access area, in order to ensure future compatibility with the zoning ordinance and build out of the area. For pedestrian accessibility, the applicant is proposing to construct a minimum 10-foot pedestrian/bicycle path along the frontage of Highway 93, which will eventually connect to other sections as properties develop in the future. The applicant is proposing to install landscaping in and around the parking lot and building. The landscaping plan will be reviewed and approved by the Kalispell Parks Department prior to issuance of the building permit. The applicant intends to design and construct an architecturally pleasing structure. All new commercial buildings will be reviewed and approved by the City of Kalispell Architectural Review Committee prior to issuance of the building permit. 7. The relationship, beneficial or adverse, of the PUD plan upon the neighborhood in which it is proposed to be established in concert with the underlying zone; As stated above, the proposal is generally compliant with the Future Land Use Plan, as shown in the Kalispell Growth Policy. The neighborhood in which it is located is a mixture of commercial and light -industrial uses. The addition of a boat and trailer sales and repair facility is complimentary to the established neighborhood character. The proposed use conforms with the permitted uses in the B-5 land use zoning district. Consideration should be given to protecting a future north -south access across the eastern portion of the property site in accordance with the Kalispell Growth Policy future land use map. S. In the case of a plan which proposes development over a period of years, the sufficiency of the terms and conditions proposed to protect and maintain the integrity of the PUD; The applicant is proposing to develop the property in three phases. The first phase includes the boat and trailer sales and repair facility on the western 500 feet of the property and continued use of the existing storage building and existing workshop building. Phases 2 and 3 expand the overall operation into the eastern portion of the property with storage structures that will allow the property owner to keep additional inventory on -hand, and lease dry, winter storage for privately - owned boats. The use of the property in this way is a desirable improvement of Captains Marine PUD KPUD-14-01 Page 10 of 14 the property. It is important that future phases do not restrain the future use and development of the narrow deep lots to the south of the subject property. By maintaining integration with the PUD to the north, future development options are enhanced for the subject property and to the south. 9. Conformity with all applicable provisions of this chapter. No other deviations from the Kalispell Zoning Ordinance or Kalispell Subdivision Regulations have been requested. I. RECOMMENDATIONS Staff recommends that the Kalispell City Planning Board and Zoning Commission adopt Revised Staff Report KPUD-14-01 as findings of fact and recommend to the Kalispell City Council that the Captain's Marine PUD be approved subject to the conditions listed below: CONDITIONS OF APPROVAL PUD Conditions General Conditions: 1. In accordance with the Kalispell Growth Policy and the Planned Unit Development provisions in the Kalispell Zoning Ordinance, an area sixty (60) feet wide extending south from the north -south access easement (United Drive) to the southern property boundary shall be kept free of any structural development until such time that future development warrants construction of a roadway in this location per the Kalispell Standards for Design and Construction. 2. Phase 1 of the development of Tract 7C shall substantially comply with the following site plan and elevations submitted as part of the Planned Unit Development application (with exceptions noted below): A. Proposed Site Plan dated October 6, 2014, prepared by APEC Engineering B. Renderings of the Captain's Marine boat/trailer sales facility dated June 26, 2014, prepared by R Porch Construction Exceptions: a) A fire hydrant shall be located at the northern terminus of the waterline on the northwest corner of the property, where none is currently shown. b) Separate water service line and fire suppression water lines shall be installed, where only one line is shown at this time. c) One or more fire hydrants shall be installed to provide fire protection for the existing storage building and the existing workshop building on the eastern portion of the property as determined by the Kalispell Fire Chief and Kalispell Public Works. d) The water main to supply the hydrant will need to be placed in an easement Captains Marine PUD KPUD-14-01 Page 11 of 14 location that is reviewed and approved by Kalispell Public Works. 3. To ensure adequate fire protection of the three residential structures on the eastern portion of the property, the property owner shall, in coordination with the Kalispell Fire Department, re -address the residences and provide access and address-signage for the residences from United Drive on the north side of the property. 4. Phase 2 of the development plan shall substantially comply with the Proposed Site Plan dated October 6, 2014, but shall be modified so that any the proposed storage buildings shown in Option A or Option B are located 20 or more feet from the western edge of the extension of the 60-foot wide north - south access easement specified in Condition # 1. 5. Phase 3 of the development plan shall substantially comply with the Proposed Site Plan dated October 6, 2014, but shall be modified so that the proposed storage building is located 20 or more feet from the eastern edge of the extension of the 60-foot wide north -south access easement specified in Condition # 1. 6. The permitted and conditional uses for Tract 7C are restricted to B-5 uses including retail sales and service. 7. The property owner shall maintain the landscaping on their property and from their property line to the adjacent street or highway travel surface of Highway 93 South as applicable. 8. All utilities shall be placed underground and in locations that are approved by the Kalispell Public Works Department in accordance with the Kalispell Standards for Design and Construction. Prior to the issuance of a building permit: 9. A development agreement shall be drafted by the Kalispell City Attorney between the City of Kalispell and the developer outlining and formalizing the terms, conditions and provisions of approval. The final plan as approved, together with the conditions and restrictions imposed, shall constitute the Planned Unit Development (PUD) zoning for the site that shall be completed and signed by the city and owner prior to the issuance of a building permit. 10. The proposed site plan for Phases 1, 2, and 3 of the Captain's Marine PUD is required to be submitted to the Kalispell Site Review Committee for review and approval prior to issuance of a building permit for any structural development. Approval of this PUD does not convey or grant any spec authorization or project pre -approvals relative to the duties of the Site Review committee. 11. For each phase of development, a landscape plan shall be submitted to the Parks and Recreation Department for review and approval. The landscape plan shall include an irrigation plan and specify tree and shrub type and size at the time of planting for the parking areas, areas around the building and adjacent Captains Marine PUD KPUD-14-01 Page 12 of 14 right-of-ways. Street trees shall specifically be required in a landscaped boulevard along the west side of the property adjacent to Highway 93 South. All areas of the site not proposed for structural development, parking, and access shall be addressed with some level of landscape treatment. 12. A pedestrian/bike path plan shall be provided to the Parks and Recreation Department and Public Works Department for review and approval. The plan shall show the location of the bike path at the outermost edge of the Highway 93 R/ W adjacent to Tract 7C. Note: An asphalt bike trail shall have a minimum width of 10 feet; a concrete bike trail shall have a minimum width of 8 feet. 13. All improvements shall be completed in accordance with the City of Kalispell's Standards for Design and Construction and Montana Public Works Standards; and shall be certified by an engineer licensed in the State of Montana. All work shall be reviewed and approved by the Kalispell Public Works Department prior to construction. 14. Water and sewer main extensions shall be reviewed and approved by the Kalispell Public Works Department prior to installation. 15. The developer shall submit to the Kalispell Public Works Department for review and approval a storm water management plan that meets the requirements of the current city standards for design and construction. The approved storm water management plan for on -site facilities shall be completed prior to the issuance of a building permit. 16. The proposed structure for the Captain's Marine Boat and Trailer Sales and Repair Facility is required to be submitted to the Kalispell Architectural Review Committee prior to issuance of a building permit. Approval of this PUD does not convey or grant any specific authorization or project pre -approvals relative to the duties of the Architectural Review committee. 17. The proposed storage buildings depicted on the Proposed Site Plan, dated October 6, 2014 and the Typ. Storage Building Elevations, dated October 6, 2014, are required to be submitted to the Kalispell Architectural Review Committee prior to issuance of a building permit. Approval of this PUD does not convey or grant any specific authorization or project pre -approvals relative to the duties of the Architectural Review committee. Prior to the issuance of a certificate of occupancy: 18. A certification from an engineer licensed in the State of Montana shall be submitted to the Public Works Department stating that all water and/or sewer lines have been installed per the approved plan. 19. Any on -site storm water management facilities shall be installed per the approved plan. 20. All landscaping shall be installed per the approved landscape plan. Captains Marine PUD KPUD-14-01 Page 13 of 14 21. The bike trails shall be installed per the approved plan. 22. The property owner of Tract 7C shall obtain the appropriate permit for the approaches onto Highway 93 and receive an approval from MDT on the completion of conditions or requirements attached to the approach permit. The approved approach permit and MDT approval shall be submitted to the Kalispell Planning Department. Captains Marine PUD KPUD-14-01 Page 14 of 14 PUBLIC HEARING Ted Sokalowski, 225 Snowline Lane described fencing issues along one of these properties where the fence is 10 feet off the property line. Mr. Sokalowski noted that the fence cannot be just torn down and then put up again in the right place because the animals will get loose. Hull asked if the fence was on the east boundary of the Northwestern Truss property and Sokalowski said yes going east toward Demersville Road. MOTION Clark moved and Williamson seconded a motion to adopt staff report KA.-08-05 as findings of fact and recommend to the Kalispell City Council that the initial zoning for the properties upon annexation be B-5/PUD, (Industrial- Commercial/Planned Unit Development). BOARD DISCUSSION Hull stated the board feels a grid road system is really important. He likes the existing parallel road and he added it should be extended and other roads should intersect it. Hull said he has appraised the Northwestern Truss property twice and part of that property is in the floodplain and is wetlands and is not developable. Hinchey asked if the entire 80+ acres could be developed as industrial uses and Conrad said the growth policy designates this land as industrial so whatever is permitted in the B-5 or I-1 zones would be appropriate. Hinchey added the board will be able to review the appropriateness of the proposed development when they review the PUD. There was discussion on the uses that would be allowed in the B-5 zone. Jentz said the purpose of the B-5 with the PUD overlay is to ultimately create a well -designed project with mixed uses that relate to each other. Hinchey said he is very encouraged to have the PUD aspect as part of this proposal. Williamson noted there are a couple tracts of land with this proposal that are separated from the rest and he asked if anyone had any concerns about trying to incorporate the separated tracts into a cohesive plan for the PUD. Hull said he feels if the annexation 8s initial zoning is approved it will encourage the other properties to annex in between. Hinchey said this would be a good start. ROLL CALL The motion passed unanimously on a roll call vote. OLD BUSINESS None. NEW BUSINESS Jentz said the scheduled work session for October 28th has instead been scheduled as a work session with staff and the West Valley and Riverdale Land Use Advisory Committees to discuss the Kalispell West Growth Policy Amendment. Jentz suggested the planning board is welcome to attend but it is Kalispell City Planning Board Minutes of the meeting of October 14, 2008 Doses A -,PC Planning Department 2011 Avenue East Kalispell, Mr 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 wwwAaUsnelLcom/ulanning November 5, 2009 Gardner Investments, LLC Attn: Davar Gardner P.O. Box 958 Kalispell, MT 59903 -0958 RE: Fire requirements for Tract 7C and Lot 5 of the Lost Creek Subdivision upon annexation Dear Mr. Gardner: This morning Dan Diehl, Kalispell Fire Chief, and D.C. Haas, Kalispell Fire Marshal, met with you to discuss fire related concerns for buildings located on Tract 7C and Lot 5 of the Lost Creek Subdivision. If annexed, the fire department will provide the fire suppression for these buildings however, no fire hydrants serve either of the properties. It was agreed that for the small office located on Lot 5 of the Lost Creek Subdivision the power would be cut to the building within the next week. For the existing truss company on Tract 7C, it was agreed that annexation could occur but a fire hydrant would be installed by you at a location approved by the Kalispell Fire Department no later than June 1, 2009. If you have any questions please contact me at 758-7940 or by email at sconrad@kalispeU.com. Sincerely, Sean Conrad Senior Planner c: Kalispell Fire Department PLANNING FOKTHr. FVruRt. August 27, 2010 Gardner Investments, LLC Attn: Davar Gardner P.O. Box 958 Kalispell, MT 59903 -0958 RE: Fire requirements for Tract 7C Dear Mr. Gardner: Planning Department 201 1" Avenue East Kalispell, NIT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kalispell.com/plannigg In November of 2009 I sent you a letter regarding a meeting which took place between you, Dan Diehl, Kalispell Fire Chief, and D.C. Haas, Kalispell Fire Marshal to discuss fire related concerns for the building located on Tract 7C (former truss company site). The letter reflected that during your meeting it was agreed the annexation of the property could occur but a fire hydrant.would be installed by you at a location approved -by the Kalispell Fire Department no later than June 1, 2009. To date, this has not been completed. Please contact Chief Diehl at 758- 7760 to determine an appropriate time frame for installation of the fire hydrant. If you have any questions please contact me at 758-7940 or by email at sconrad@,kalispell.com. Sincerely, Sean Conrad Senior Planner c: Dan Diehl, Kalispell Fire Department City Manager enclosure October 6, 2014 Kevin LeClair Kalispell Planning Office 201 1st Ave. E. Kalispell, MT 59901 Re: Captains Marine PUD Tract 7C, NW Quarter of Section 33, T 28 N, R 21 W, Kalispell, Flathead County Kalispell Planning Review Comments September 12, 2014 Dear Kevin: Please find our written response to your September 12, 2014 comments in the same order. 1. We are not requesting deviations from the underlying zoning district. 2. We will ask for a deviation from the requirement to pave the entire area used for exterior boat and trailer storage. We would rather use crushed asphalt outside of the travel lanes and parking areas within the project area to be used for exterior boat and trailer storage. 3. See plan for footprint. The sales and service bldg is to b32' high. The phase 2 option A bldgs would be 35' high. The phase 2 option B bldg would be 40' maximum in high maximum. 4. a., b., c. Vehicular Traffic, Parking, Pedestrian route Phase 1—The new boat and trailer sales and service facility will be served from the two existing approaches from highway 93. The main customer and employee parking area will be to north of the new sales facility (34 spaces). There will be paved boat and trailer storage to the east and north of the building. A new north -south bike and walking path will be provided running adjacent to hwy 93. There will be a paved access road continuing to the rear of the property to serve the existing shop, storage bldg and residences. Additional new paving will be extended over the existing gravel roadways serving the storage building and residences to the north. There is existing parking for 16 cars located to the east of the southern residence and shop. There will be new paved parking provided for the existing residences to the north. Phase 2 —Additional paving will be provided to service the new dry stacked boat storage buildings — Option A, or option B will be served from the existing paved surfaces. Phase 3 —Additional paving will be provided to service the final dry stacked storage building. d., e. Water and Sewer extensions Phase 1— Water and sewer service to the new boat and trailer sales and service facility will be from existing utilities along highway 93. Water will be brought in from where the main crosses the APEC, Inc. Civil Engineers 111 Legend Trail, Kalispell, MT 59901 Tel 406.755.1333 Fax 406.755.1310 www.APEC-MT.com Captains Marine PUD 10/7/2014 Page 2 of 3 highway to the south. It will be continued to the north property boundary. Sanitary sewer will connect directly to the existing sewer main along the east side of Highway 93. Fire service requirements will be coordinated with the city. Phase 2 —When the existing residences are removed during phase 2 the existing septic drainfields will be decommissioned. Water and sewer utilities will be extended at that time to the existing workshop. The new dry stacked storage building(s) will not require water and sewer service. Fire service requirements will be coordinated with the city. g. Typical fencing is to be galvanized chain link — 8' high h. Relocated pylon sign as previously submitted. See plan for location. i. Exterior lighting will comply w/ city regulations. i. See Plan 5. See previously submitted for Sales and Service bldg. See attached drawing for typical dry stack storage bldg. 6. See plan. 7. See plan. 8. See plan 9. See plan Captains Marine PUD 10/7/2014 Page 3 of 3 Narrative Format Items: 1. In looking at the Growth policy Future Land Use Map (GPFLUM) shows two small arrows vaguely located on Lower Valley Road and Snow Line Lane. No road location or alignment was discussed or presented as part of the GPFLUM preparation and process, nor is it shown on the Hwy 93 South Corridor Map (Figure 12) included in the Highway 93 South Corridor Area Plan. Demersville Road however is prominently indicated on the same map running north/south and connection Lower Valley Road to Snowline Lane near the Old School Station. Our clients had concerns about a future road bisecting the property from the first response to your office. A requirement from the city, before the purchase of the property, requiring a roadway crossing this tract would have stopped the purchase of this property. This property, as pointed out previously, will function properly only if kept in one piece. Even a road reservation would permanently damage the intended use of this property. This intended "taking" brings no benefit to this project and would in fact irreparably harm the business potential of the venture. 2. If allowed, Captains Marine will act as a pleasing and inviting gateway element at the southern entrance to the city. The attractive new sales and service facility is exactly the type of business that the city is looking for along this stretch of the southern entrance corridor. Traffic generated to and from the site will utilize the two existing accesses onto hwy 93 as already approved by MDT which does not see this facility as being a big traffic generator in itself. There will also be a gated entrance to a private roadway easement to the north. We will utilize the existing city water and sewer services located along hwy 93, extending the water service to the north edge of the site. As additional development occurs, services will be extended as needed. Sincerely, Marc A. Liechti APEC, Inc. Enclosures Cc: Randell Seyfert Project File \\Skywalker\proiects\_APEC lobs\Seyfert Ra ndell -Captains Marine - PUD-140612\Design`Shared\Submittals\PUD - City Response & Comments\10-2014 Response to Kevin LeClair\APEC Letter to Kevin LeClair -City of Kalispell-10-6.doc Planning Department 201 1-t Avenue East Kalispell, MT 59901 Phone: (406) 758-7940 Fax: (406) 758-7739 www.kaHspe]U.com/ planning APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) PROJECT NAME New Captains Marine Development 1. NAME OF APPLICANT: Somers Bay Trading Co. LLC (owner) 2. MAIL ADDRESS: 120 Vista Drive 3. CITY/STATE/ZIP: Bigfork, MT 59911 PHONE: 406-755-2666 NAME AND ADDRESS OF OWNER IF DIFFERENT THAN APPLICANT: 4. NAME: -— N.A. 5. MAIL ADDRESS: N . A _ 6. CITY/ STATE/ZIP: N.A. PHONE: N . A. 7. TECHNICAL ASSISTANCE: APEC Engineering Inc. 8. MAIL ADDRESS: Ill Legend Trail 9. CITY/STATE/ZIP: Kalispell, MT 59901 PHONE. 406-755-1333 If there are others who should be notified during the review process, please list those. Check One: X Initial PUD proposal -.,.,_, Amendment to an existing PUD A. Property Address: 3211, 3 213 & 3 215 Hwy 93 S B. Total Area of Property: 9.6 acres C. Legal description including section, township & range: Tract 7C, NW corner of Section 33, Township 28N, Range 21W D. The present zoning of the above property is: B-5 /PUD 1 E. Please provide the following information in a narrative format with supporting drawings or other format as needed: a. An overall description of the goals and objectives for the development of the project. b. In cases where the development will be executed in increments, a schedule showing the time within phase will be completed. C. The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks and use, and the reasons why such departures are or are not deemed to be in the public interest; d. The nature and extent of the common open space in the project and the provisions for maintenance and conservation of the common open space; and the adequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed in the plan; e. The manner in which services will be provided such as water, sewer, storm water management, schools, roads, traffic management, pedestrian access, recreational facilities and other applicable services and utilities. f. The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established g. How the plan provides reasonable consideration to the character of the neighborhood and the peculiar suitability of the property for the proposed use. h. Where there are more intensive uses or incompatible uses planned within the project or on the project boundaries, how with the impacts of those uses be mitigated. i. How the development plan will further the goals, policies and objectives of the Kalispell Growth Policy. j. Include site plans, drawings and schematics with supporting narratives where needed that includes the following information: (1). Total acreage and present zoning classifications; (2). Zoning classification of all adjoining properties; (3). Density in dwelling units per gross acre; (4). Location, size height and number of stories for buildings and uses proposed for buildings; (5). Layout and dimensions of streets, parking areas, pedestrian walkways and surfacing; (6). Vehicle, emergency and pedestrian access, traffic circulation and control; (7). Location, size, height, color and materials of signs; (8). Location and height of fencing and/or screening; (9). Location and type of landscaping; (10). Location and type of open space and common areas; (11). Proposed maintenance of common areas and open space; (12). Property boundary locations and setback lines (13). Special design standards, materials and / or colors; (14). Proposed schedule of completions and phasing of the development, if applicable; (15). Covenants, conditions and restrictions; (16). .Any other information that may be deemed relevant and appropriate to allow for adequate review. If the PUD involves the division of land for the purpose of conveyance, a preliminary plat shall be prepared in accordance with the requirements of the subdivision regulations. Please note that the approved final plan, together with the conditions and restrictions imposed, shall constitute the zoning for the district. No building permit shall be issued for any structure within the district unless such structure conforms to the provisions of the approved plan. The signing of this application signifies that the aforementioned information is true and correct and grants approval for Kalispell Planning staff to be present on the property for routine monitoring and inspection during review process. Signature) 3 -7ill /I (Date) Captains Marine Development PUD Application Narrative PUD Application Narrative for Captains Marine Development City of Kalispell, Flathead County, Montana Italicized text is verbatim from City of Kalispell PUD application, answers follow text to complete the formal application. All supplemental information and project layouts are included as appendixes. E Please provide the following information in a narrative format with supporting drawings or other formats as needed: (a) An overall description of the goals and objectives for the development of the project, - The intent of the new Captains Marine development is to relocate an existing boat and trailer sales facility located south of Kelly Rd on Hwy 93 to a new location just south of the west side Kalispell bypass on Hwy 93 providing additional needed parking and boat storage. The new location will complement and encourage the mixed use commercial intended for this southern entrance to Kalispell. The new facility will include sales, office and service areas on the 14,900 s.f. main floor and offices on a 1,800 s.f. second level. There is an existing private residence and a small manufacturing facility located on easternmost portion of the property. There will be no change anticipated for these at this time although in the future this area may be used for additional boat storage. (b) In cases where the development will executed in increments, a schedule showing the time within phase will be completed, - N/A (c) The extent to which the plan departs from zoning and subdivision regulations including but not limited to density, setbacks and use, and the reasons why such departures are or are not deemed to be in the public interest; NA (d) The nature and extent of the common open space in the project and the provisions for maintenance and conservation of the common open space; and the adequacy of the amount and function of the open space in terms of the land use, densities and dwelling types proposed for the plan Landscaping requirements, storm drainage detention and infiltration of storm water to the site will inherently provide the common open space required by the city. In addition, at the east edge of the site there are approx. 2 acres of grass, timber and a slough area which will remain undisturbed. This will also act as a buffer for any future potential development to the east. See also noted site plan. Pagel of 3 Captains Marine Development PUD Application Narrative (e) The manner in which services will be provided such as water, sewer, storm water management, schools, roads, haffic management pedestrian access, recreational facilities and other- applicable services and utilities: The development will connect to existing city water and sewer utilities available along hwy 93. Storm water will be directed and detained via bio-swale or similar overland storage type drainage facility per city of Kalispell standards. Emergency overflow will be directed to the slough area mentioned previously one the east portion of the site which would eventually feed into Ashley creek. Traffic to and from the site will be via existing approaches onto hwy 93. No new roadways will be added. A bike path will be incorporated into the site plan along hwy 93. Due to the commercial nature of the project services such schools, recreation facilities, etc. will not be required. (0 The relationship, beneficial or adverse, of the planned development project upon the neighborhood in which it is proposed to be established: As mentioned above, the development is located along a stretch of hwy 93 that already contains multiple equipment, recreational vehicle, trailer sales, automobile dealerships, etc. and will complement and encourage the mixed use commercial intended for this area. (g) How the plan provides reasonable consideration to the character of the neighborhood andpeculiar suitability of the property for the proposed use: Located just to the south of the Kalispell bypass, the location of the development is ideally located in that it allows direct highway access for truck or trailer delivery without making trucks continue though the Kalispell downtown area. It also provides the opportunity to market product to traffic continuing into Kalispell as well as that portion opting to take the bypass to the west and north around the city. (h) Where there are more intensive uses or incompatible uses planned within the project or on the project boundaries, how will the impacts of those uses be mitigated: NA (i) How the development plan will further the goals, policies and objectives of the Kalispell growth policy: Located in B-5/PUD zoning which specifically allows boat sales and repairs, the intent is to provide a facility that will enhance the entrance to Kalispell with landscaping and boulevard trees per city standards, a bike/pedestrian path and an attractive dealership building. It is the intent to connect to the existing city water and sewer provided along hwy 93. (j) Include site plans, drawings and schematics with supporting narratives where needed that includes the following information: (1) Total acreage andpresent zoning classifications: Total acreage: 9.6 acres, Zoning: B-5/PUD (2) zoning classification of all adjoining properties: East SAG-5 (county), South I-1H (county), West I-111 (county), North I-111 (county) and B-5/PUD (city) Page 2 of 3 Captains Marine Development PUD Application Narrative (3) Density per dwelling units per gross acre: N.A. (4) Location, size, height and number of stories for buildings and uses proposed for buildings: 15,000 sf, one story, boat & trailer sales and service. (5) Layout and dimensions of'streets, parking areas, pedestrian walkways and su► facing: See attached drawings (6) Vehicle, emergency and pedestrian access, traffic circulation and control: See attached drawings (7) Location, size, height, color and materials of signs: See attached image and site plan (8) Location and height of fencing and/ or screening.- 8 ft. high chain -link security fencing will be provided at outdoor boat storage. (9) Location and type of landscaping: See attached drawings — landscaping will be per city standards (10) Location and type ofcommon areas and open space: See attached drawings (11) Proposed maintenance of common areas and open space: Maintenance by owner (12) Property boundary locations and setback lines: See attached drawings (13) Special design standards, materials, and/or colors: See attached architectural schematic design (14) Proposed schedule of completions and phasing of the development if applicable: Estimated completion date: May 2015 (15) Covenants, conditions, and restrictions: N.A. (16) Any other information that may be deemed relevant and appropriate to allow for adequate review. As attached End of Narrative Page 3 of 3 0868 IR�IAIIN111111f1lllllll1111111N1111110111N111L1�1111111111111�1I Fees:W00 1 t14/20142:22 PM Exhibit A LEGAL DESCRIPTION That portion of the North half of the Northwest Quarter of Section 33, Township 28 North, Range 21 West, P.M.M., Flathead County, Montana, described as follows: Commencing at the Northwest corner of said Section 33i thence along the North boundary line of said Section 33, South 89056104" East 43.01 feet to a point on the East right of way line of U.S. Highway No. 93 said point being the Point ofBeginning, thence along the North boundary line of said Section 33, South 8905610V Bast 1320.03 feet; thence South 00003'56" West 330.00 feet; thence North 89156'04" West 1320.03 feet to a point on the East right of way line of U.S. highway No. 93; thence along said right of way line North 00-04' 14" East 330.00 feet to the point of beginning. Excepting Therefrom: that portion conveyed to the State of Montana for public highway purposes as granted in Deed recorded June 1, 1948 AND that portion lying within the right of way of Highway No. 93 as disclosed in the Amended Judgment and Final order of Condemnation to the State of Montana, Montana Department of Transportation recorded November 6, 2000, Instrument No. 2000-311-14300, records of Flathead County, Montana. Q o0ceumeent~Number: ^200700036390 Y '• Lt CUP t ! , ■ 1 11 STORAGEEMERGEN ACCESS ! STORAGEPHASE 2 - 30'x 140" ASSOCIATED PAVING WETLAND BOUNDARY NEW i • ASSOCIATED CARPORTOPTION A EXISTING N TO BE REMOVED ws EXISTING DRA EXISTINE RESIDENCES ABANDONEDPHi 10 MEN I'MEN, 1 ; ,+ .� �! �� ,�•"11��11��w�`� � AEI � � � A/ � ■ t FI ■ f � i i• No MAW' r�\\\\ � �►a•►•:�i�...�+'� . Y'' -r sew '.r■ - - I��•• i Y fN L ■ uu � e r PROPOSED N SITE PLAN 2015 EMSTING STRUCTURE:>f 117 . BE REMOVED 1 1 r A L�•r•• •i;. / 1 1 1 TO REMAINi4�ii��i!a!►R AREA > 25% SLOPE WAL WD*C uEru SONS ia%ntlul: �[a wew n• m x ann: wae. ra. STORAGE BUILDING ELEVATIONS A 401 F i LEGEND EMSTING WATER LINE r IEXlSnNGSEWER UNE EXISTING SEWER FORCE MAIN "• GeaanlNrcelpda Tau Id:Y82lX33-M(-= Aefe prf6+'�ap A 9 AprW :m A1Yex s awoou air 0-upl s43dlr. SO US RAY Hk oM*xr. seams RAY 7RApril, LA liC Adkm OM UDNSG OR hWFOM Wr sMt Omer.. SOMEAS stir i1w9016 M LLC Add—'(M 3213 MWAY 93 S IALLWI LL M7599R_ $Ehw P irm Name sOME15 5Ow4ADbVtrr Numberl9 HlhSdwd MN MRMWEAD VUO pall Weld NYmbe A "14.1 ion of 56" ccc I � T .i , lift • � 1 Nlp� O n-} V, Vats. MOM ?` .r Ole --'��• - _• YF ,f . - _ _ � {AYE• .��� � R - 1 LOCATION y p mm f 4 i i w c ■ s { HGR :Al11RL5G-1 ! no — 1 U a pq emxlm: >.xa uwY' tRW �x Ifi*qcs. 31Rti IFICDUrr cur C 1 _ �xrap:aq�'i STUDY PLAN T M, nem wow.a..w.,a.�o...ns.wwer.cwc. 9MT. v�YO+R MIKi�QOtita�LAGw Fc, �crnOrvnp[nfgxWMf bl v R wNP� Cawr��rnCK�cu�r+K �.�i�nex rWgfp�Or RIV/G�60aiwA:l�n Rs m I- A-2 z: �l a F �f CLIENT n� r nm4 6/26/2014 � u Frdminvy Drauings Not for GonstrudW /RP'R0r6nr0't•�wm4[LwFM.'LTGR K. vcNaonm�nu ocawn+wiorK rc.rw carKn.�cmia rsaniaeaa�.u�v oohcra coRrwm ny.ona�wrnei.i.nni AM0lOIiC'RTOKN WHRRW'LM iY D np1�ImI�K IHr�JIR�IYOU ipw[UM WR A-3 z� 0 U z m LU na.p�lYM •WiF•iiP11 C 1 I— 1- �f CLIENT 4 A RLY -V-6F-a4 """' PmUnOhmV Vtadngs Not for Constru lm need to get together and determine how to go about having a right of first refusal for every home sale that occurs within '/2 block of Flathead High School and the district should come up with a plan for land acquisition. Matulevich said the single space per parcel was a good suggestion. It doesn't require bureaucracy to manage it and only requires someone to put green paint on the curb. He also suggested that the City of Kalispell could waive the stormwater treatment requirements so that the district could maximize the amount of parking that they could put on any piece of land that they acquired. When students are classified as a sub -standard class of citizens and are excluded from the ability to park on public property that is bad government. He strongly urged the board to recommend to the city council that they do not institute a parking district. The problem needs to be solved in other ways. Grace Cady, 911 8t' Avenue West said one issue that hasn't been properly addressed is the "Graduation Matters" effort. It is important to get the kids to school and if you want the kids in school, getting a diploma and at Flathead High School then you have to make that easy for them. Casey Petek (no address provided) said she just came back from a volleyball game in Missoula and was picked up by her mother because if she had ridden the bus she would have arrived between 11:45 and midnight. She read from a letter that was provided to the board prior to the hearing dealing with the safety issues that are faced by the athletes having to walk to their vehicles in the dark and with the sex offenders in the neighborhood. Please keep the students safe. BOARD DISCUSSION President Graham noted they have received a lot more information on this issue that needs to be considered by the board. He asked for a motion to table this item to the October 28, 2014 work session. MOTION Lorch moved and Regier seconded a motion to table the discussion of a parking district near Flathead High School to a work session to be held on October 28, 2014. ROLL CALL The motion passed unanimously on a roll call vote. BOARD MEMBER Board Member Osorio-Khor returned to her seat. RESEATED OLD BUSINESS: CAPTAIN'S MARINE A request from APEC Engineering, on behalf of Captain's Marine Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 9 of 17 PLANNED UNIT (Somers Bay Trading Co. LLC), for a Planned Unit Development DEVELOPMENT for the development of a boat and trailer sales and service facility consisting of 14,900 square feet of sales, offices, and service areas on the main floor and 1,800 square feet of offices on the second level. The PUD proposal also includes associated parking, landscaping, and public utility connections and extensions as needed or required. The property is located at 3215 Highway 93 South. STAFF REPORT KPUD-14-01 Kevin LeClair, representing the Kalispell Planning Office recapped the revised staff report sent to the board. At the last meeting the proposal submitted was a single-phase of the development on the western half of the property. The owner/ applicant wanted to have the full PUB reviewed so they provided additional materials for the staff s review. This PUD application consists of three phases of development on the property: Phase 1 is the boat and trailer sales facility, associated parking lot, landscaping and access to some of the other buildings that exist on the property; phase 2 is the addition of boat and storage facilities and wood -framed metal sided buildings that would be available for dry storage. Also included in phase 2 is the removal of the three residential structures; and phase 3 is an additional boat storage facility on the far eastern part of the property. LeClair described the dimensions and building uses currently on the property. He noted there is a slough area on the eastern portion and geotechnical information will have to be obtained in order to determine how close to the steep slopes the owner will be able to build. He also reviewed the elevation drawings and a site plan of the PUD. LeClair reviewed the PUD placeholder that was put on this property by the Gardners' which was set up to provide access to city services and when the property was developed a full PUD application would have to be submitted. LeClair noted since then full PUD applications were submitted and approved for Fred's Appliances and the Volkswagen dealership that was to be located on the northeast corner of the PUD. Both projects included development of not only how the applicant would use the property but also how it would integrate with the overall mixed -use industrial business park that was planned when the PUD was fully developed. The same is true for Captains Marine. Not only will they have to look at how this property will be developed for the owner but also look at how it will integrate with the overall PUD even though the balance has not been developed. LeClair noted the Growth Policy always intended for an internal Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 10 of 17 routing system in this area that would create additional access points for the properties as it was built out. Condition #1 is the placement of a no -build area that would extend the 60 foot R/W of United Drive south across the property. The city would require that this area be reserved so that in the future when development occurs that warrants access, it will be available. LeClair added with the information submitted by the developer it appears there are other building placement options that would still provide adequate access to the buildings and other areas of the property and therefore condition #1 can still be met and allow them to use the property as they proposed. LeClair referenced an email from the city's Public Works Department, copies of which have been given to the board, which raised concerns with condition #1 and how the condition was meeting the policies in the City of Kalispell's Extension of Services Plan. LeClair reviewed the memo and indicated that the Public Works Department has requested that additional language be added to condition #1 to state: "A no protest to a special improvement district for roadways is required to be constructed as a result of future development shall be signed and submitted by the owner." LeClair said that would add a level of protection to ensure the R/W would be available if and when a roadway would be required in that area. Staff recommends that the Kalispell Planning Board adopt the staff report KPUD-14-01 as findings of fact and recommend that the Kalispell City Council approved the planned unit development subject to the 22 conditions of approval as amended. BOARD DISCUSSION Osorio-Khor said when she was first appointed to the board they were working on the growth policy and it was pointed out to her that planning was flexible and we didn't need to fixate on the specific wording. She said condition #1 bothers her because this is one lot, one business and the idea of bisecting it, basically turning it into two lots, seemed odd and not what the owner was proposing in the first place. In addition it is a safety issue with employees or customers having to cross a city street to get to the other portion of the business. The road would not connect to anything and if we insist that a portion of his property be condemned so that a road can be put in she asked if the city would compensate this property owner for the loss of his property. LeClair said no, that is not proposed at this time. Young said staff is trying to highlight the need to take a step back and look at the Gardner Investment PUD that was put into place. As a condition of that PUD and for the privilege of being annexed Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 11 of 17 into the city the Gardner's PUD was allowed a placeholder status. Part of that status is that you have to provide a long-term plan that shows roads, sewer and water and he added there was always a suggestion that a road would be there. Young said this is an issue between the owner/developer and the person that he purchased the property from. The property was allowed to be annexed into the city on the condition that the whole property would be considered and because they only bought one chunk is unfair to say they are no longer a part of the overall PUD. Graham noted there is an island of the PUD further to the south and if the road was not required through the Marine property the island would not be connected to the rest of the PUD in the future. There was lengthy discussion regarding the PUD placeholder, the properties included, a lack of an infrastructure plan for the entire PUD, and the ability to do a full PUD for a single parcel or an assemblage of parcels in order to develop an overall development plan for an area. In relation to the roadway no -build area the city is not requiring a roadway easement at this time because there are no other development plans to the south and it is not warranted. No public access will be allowed and the owner can still use their property with the exception of the 100 foot no -build area. Further discussion was held. Young asked for an explanation of how the waiver of protest to a special improvement district would be set up and LeClair explained. APPLICANT/TECHNICAL Kim Larson, APEC Engineering said they don't have a problem SUPPORT with most of the findings in the staff report with the exception of condition #1 and they request that the condition and associated references in conditions 4 & 5 be deleted. The 60 foot access easement (approximately 1 acre of the property) would bisect the property contrary to the best interests of the owner. The intent of purchasing the 10 acre property was to have one consolidated sales/service/boat storage facility and the easement would severely limit the owner's flexibility in further development of the property. The issue is complicated by the existence of a wetland area on the east portion of the property with a 100 foot setback further reducing the area remaining for development on the eastern portion of the site. The required storm water retention area west of the wetland will also cut into the area left. Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 12 of 17 By providing a phased development plan with adequate traffic circulation to serve the area in the rear of the property they can responsibly develop the property without the north -south roadway. Larson indicated the roadway only shows up on the Growth Policy Future Lane Use Map as two small arrows on Lower Valley Road and Snowline Drive and nowhere else. Larson concluded by saying there are frequent references in the staff report referring to the growth policy and please keep in mind that the growth policy is only a guideline and does not necessarily constitute law. They need to do what makes sense and it is not sensible to take that road through at this time, or at all. Randall Seifert, Somers Trading Company and owner of Captain's Marine quoted from an article from the Daily Inter Lake that states: "While the growth policy is an official public document it doesn't create law or regulate development. It is rather a community guide for making land use decisions." Seifert said he feels the city is regulating that he has to have an easement and although it has been referred to as a no -build zone it still prevents him from using his property the way he wants. Seifert said he keeps hearing the discussion that these lots are deep and narrow and he can't develop the back half. He said his plan clearly shows that you can develop a piece of property well. In fact there is such a small percentage of land that is actually usable in the back the argument to develop a road to further develop the back of the lot doesn't really make a lot of sense. The maps he has seen, including the city maps, have always shown United Drive turning to the north of his property and to suggest that he would have known or had any belief that there was a road that was supposed to go through the middle of his property is just a bit off. The bottom two properties of the PUD already have good access through Highway 93 South and Snowline Drive so those properties shouldn't even be in the discussions. Seifert continued that although it is currently called a no -build zone it is an easement because the city is saying he can't do what he needs to with his property and he isn't getting any compensation for it. Seifert pointed out that he is also requesting approval to use crushed asphalt in some of the parking areas. He noted the area is for boat storage and there won't be cars driving over it all the time. MOTION Young moved and Pesola seconded a motion to adopt revised staff report KPUD-14-01 as findings of fact and recommend to the Kalispell City Council that the planned unit development for Captain's Marine be approved subject to the 22 conditions listed in Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 13 of 17 the staff report. MOTION TO AMEND Lorch moved and Pesola seconded a motion to adopt the CONDITION #1 AS amendment to Condition #1 recommended by the Public Works RECOMMENDED BY THE Department to add the following statement: "A no protest to a PUBLIC WORKS special improvement district for roadways is required to be DEPARTMENT constructed as a result of future development shall be signed and submitted by the owner." BOARD DISCUSSION Regier asked if the applicant would be opposed to a jog in the road and moving it more towards the back of the property and Siefert noted that would actually take up more of the land. Jentz said the road needs to connect at the north and south ends but it could wind through the property. Pesola said he supports the amendment because should there be a need for a road in the future there would be a means to have it built. He added there is no requirement to build the road at this time. Osorio-Khor clarified is the motion that condition #1 as it presently is written will be amended to add the language recommended by the Public Works Department and Graham said yes. Osorio-Khor added then the next step would be to determine whether condition #1 remains as a condition and Graham said yes. ROLL CALL — AMENDMENT The motion passed on a roll call vote of 6 in favor and 1 opposed. TO CONDITION # 1 BOARD DISCUSSION Lorch asked where the crushed asphalt is proposed to be placed and Seifert said for exterior areas used for boat and trailer storage. Osorio-Khor stated she has a great deal of difficulty with condition #1. She thinks it is unnecessary, doesn't make sense and isn't good planning. She was assured by the board that the growth policy was flexible and she agrees we need to be flexible otherwise it is almost as if we are making it punitive to do business. She understands the concept but on this particular property with this configuration, with the wetlands and the fact that it is one business, and whether this roadway gets built now or 40 years from now she will not be voting in favor of the PUD with condition 41. Graham said he understands Osorio-Khor but there was a lot of work done on the original Gardner PUD overlay in 2008 and it had a designed purpose and Graham has a hard time moving away from that purpose. Street connectivity was planned and without that it would disconnect the lower portion of this PUD from the intended PUD overlay as a whole stopping city growth south. Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 14 of 17 Further discussion was held regarding location of the utilities, extension of services, and the need to secure R/W for future road extensions, should development warrant those extensions. MOTION TO STRIKE Osorio-Khor moved to strike condition #1. The motion failed due CONDITION #1 1 to a lack of a second. BOARD DISCUSSION Young asked if Public Works had any comments regarding the developer's request for a variance on surfacing materials and LeClair said it was not discussed with Public Works as the city didn't have enough information from the developer. In other projects in the city there are often requests to use a soft surface for any kind of storage areas which is generally not allowed. Graham said this came up with Kalispell Toyota's expansion of their lot and when it comes to deviations we have to apply equal application of the design standards. LeClair said in order to have parity on projects the idea is that you pave the areas that you are planning to use for parking and circulation. Parking of motor vehicles also includes trailers. The fact that it might be incidental or slow moving is not really a consideration. There are also air and storm water quality issues and without any justification the city would deny the request. Lorch said that is why he asked for clarification on the variance request because he couldn't see where on the plan this material would be used. It would be hard to respond without specifics. Lorch added he would probably have more sympathy toward that request in the 100 foot no -build area which could also reduce the area required for storm water and could enable the back portion of the property to be more usable. LeClair noted the board could make a motion to add a condition that a crushed asphalt surface could be used in areas of the no -build area, outside of parking and circulation for incidental storage or something along those lines. Anyone who has dealt with development within the city knows that a hard line is drawn on this issue. When you talk about paving your parking and access circulations areas and having the rest of the area landscaped with something that is desirable it makes the quality of the development look better in the long run v. having rough parking fields. Osorio-Khor said the board is supposed to serve as a balance. Everything is a guideline and we are trying to do what we think is best. She doesn't see any problem with them using the crushed asphalt and also allowing this material in the 100 foot no -build area as suggested. LeClair noted that the paving standard is not a Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 15 of 17 guideline it is a regulation that is applied to every project that comes in to the city. Osorio-Khor said just because something is a rule doesn't mean that there aren't exceptions to a rule. Young said he has used recycled asphalt and it can turn out great but as an advisory board we would be ill-advised to tamper with city standards that are probably incorporated by ordinance from the city council. LeClair said it might be entirely appropriate to ask for a deviation of this standard but it needs to be done in a very limited and confined way because when you approve a deviation for one developer it cascades to the next project and then the next. LeClair said he doesn't think it is necessarily a bad idea for storage around the outbuildings on the back part of the property. The city would need to have additional information on what areas the crushed asphalt would be placed. Lorch clarified that his suggestion was for areas of non -circulation and recognizes the fact that the owner of the property isn't going to be able to invest a lot in the no -build area without it being at risk when further development occurs. MOTION — REQUEST FOR Lorch moved and Regier seconded a motion to add condition #23 PAVING SURFACE that states as follows: "A variance is granted to allow the use of MATERIALS VARIATION recycled asphalt for parking and boat storage and on the non - circulation areas in the 100 foot no -build area." BOARD DISCUSSION I Jentz noted that this variance would not be a substitute for the landscaping requirements within the development. Osorio-Khor asked if the city often allows PUD's that have islands of county land in between the city properties and LeClair said yes. Osorio-Khor asked if there have been road requirements like this and LeClair said there have been discussions on how the properties will be integrated in the future and Jentz added with Glacier Town Center there were 4-6 roads that went straight north out of that property, so yes it is a normal condition. The difference is they would have been using those roads after the property was developed. LeClair added in an ideal situation you might bring United Drive into this property and actually have a cul-de-sac that would terminate at the southern boundary so there would be a turnaround. Right now there would be a dead end road which is an undesirable condition for people who are driving south on United Drive as they have to turn west and drive across an easement that may be other people's private property. Osorio-Khor asked if the areas of the recycled asphalt would be Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 16 of 17 determined by the applicant and if so if that wording is part of the condition and LeClair said not as part of the motion but anytime a structure comes in for development it would go through Site Review and the conditions of the PUD would be reviewed at that time. Osorio-Khor thought the wording should be included in the motion and LeClair noted the applicant can propose anything they would like but added final engineering rarely matches the original conceptual designs. ROLL CALL - VARIANCE The motion was approved on a roll call vote of 5 in favor and 2 opposed. BOARD DISCUSSION Osorio-Khor said she does not like condition #1 and she will be voting against it. ROLL CALL — ORIGINAL The motion was approved, as amended, on a roll call vote of 5 in MOTION favor and 2 opposed. NEW BUSINESS: None. ADJOURNMENT The meeting adjourned at approximately 10:40 p.m. NEXT MEETING The next regular planning board meeting is scheduled for November 12, 2014 (Wednesday due the Veteran's Day Holiday) beginning at 7:00 p.m. and located in the Kalispell City Council Chambers, 201 1 st Avenue East, Kalispell. Chad Graham President APPROVED as submitted/corrected: / /14 Michelle Anderson Recording Secretary Kalispell City Planning Board Minutes of the meeting of October 14, 2014 Page 17 of 17