3. Change Order for Engineering Contract/Meridian RoadAgenda -May 27, 1997 AGENDA ITEM 3 - CHANGE ORDER FOR ENGINEERING CONTRACT ON MERIDIAN ROAD RECONSTRUCTION PROJECT BACKGROUND/CONSIDERATION: A request for a change order to the engineering agreement with Peccia and Associates is enclosed. The additional cost of $31,300 is due to an expansion in the scope of work. Additional time required for actual locations of existing underground utilities, revising drawings and base data, and adjusting construction documents to allow construction to be phased in (to accommodate financing) all have contributed to the increase in cost. RECOMMENDATION: The Public Works Staff has reviewed the request and `.. find it to be justified and acceptable. Upon your approval, we will forward the change order to the Montana Department of Transportation to add to the contract for engineering services. ACTION REQUIRED: A RESOLUTION to approve the change order is required. Current Status of Meridian ;+V 1. Clarence Krepps, Jim Hansz, John Wilson Meeting with Peccia Reps. On 5-15-97 Major delays to date have been: 1. Decision to reconfigure lanes by the Council caused further review delay by the Montana Department of Transportation. 2. Preliminary hydraulic study information provided to Peccia by MDOT was incomplete - additional study (both field and office) caused an additional 200 hours of unexpected work. 3. Phasing of the project and funding discussion took additional time with MDOT and the City. Phase 1 - U.S. 2 to Three Mile - Right -of -Way Acquisition, Paving, with Signal Installation at Two Mile Drive, Intersection Street Lights. Phase 2 - North of Three Mile Intersection - Paving, Signal Installation at Three Mile Drive, Intersection Street Lights. Phase 3 - U.S. 93 - Street Lights for the Remainder of the Project, Signal Installation at Liberty. Preliminary Right -Of -Way (ROW) plans are going to MDOT the week of May 22. Expect final ROW plans approval in June/July from MDOT - will then submit to Federal DOT for approval - approximately one month. Will, upon approval from FDOT, begin ROW appraisal and negotiation process in late July/August. Currently reconfirming some underground utilities will be complete week of May 22. Final plans to be submitted in July/August. Will then have an informational meeting in Kalispell for public/Council review. e (lN 0i KJllg I Incorporated 1892 elephone (406) 758-7700 FAX (406) 758-7758 Post Office Box 1997 Kalispell, Montana Zip 59903-1997 Date: May 15, 1997 To: Clarence Krepps, City Manager From: John Wilson, Assistant City Engineer �� Re: Meridian Road Reconstruction Supplement to Engineering Contract Attached please find a copy of the proposed Supplemental Agreement No. 2 for the Meridian Road Reconstruction engineering contract. We have reviewed the request and find it to be justified and acceptable. Given Council approval, this document will be forwarded to the Montana Department of Transportation and added to the contract for engineering services. Douglas Rauthe Mayor Clarence W. Krepps City Manager City Council Members: Gary W. Nystul Ward I Cliff Collins Ward I Norbert F. Donahue Ward II Dale Haarr Ward rl Jim Atkinson Ward III Lauren Granmo Ward III Pamela B. Kennedy Ward IV M. Duane Larson Ward IV Telephone (406) 7SS-7700 Douglas Rauthe FAX (406) 7S8-7738 Mayor Post Office Box 1997 Zip 59903-1997 Clarence W. Krepps City Manager City Council April 9, 1997 Members: Robert Peccia and Associates Gary d I Nystul 825 Custer Avenue Cliff Collins P.O. Box 5653 ward I Helena, MT 59604 Norbert F. Donahue Ward II Subject: North Meridian Road - Kalispell STPU 6701(5) Dale Haarr Ward II Control No. 2950 Jim Atkinson Ward III In accordance with Article IV, Section 6 of the original agreement between the City of Kalispell and Robert Peccia and Associates dated October 10, 1995, this letter and Lauren Granmo Ward nl attached request for additional compensation dated April 9, 1997 will serve as Supplemental Agreement No. 2. Pamela B. Kennedy Ward IV This supplement is to provide additional compensation for changes in the scope of work M. Duane Larson Ward IV to reduce the project cost and extra design and plan preparation necessary to accommodate the construction phasing plan recently approved by the City. This supplement provides for an additional actual cost of $28,802 and an additional fixed fee of $2,498 for a total of $31,300. This will increase the fixed fee from $19,913 to $21,691 and the maximum contract ceiling from $376,919 to $408,219. Clarence Krepps City Manager Approved Bert P ccia and Associates Date 4f 4Z?7 CONTRACT SUPPLEMENT SCOPE OF SERVICES AND COST PROPOSAL ROBERT PECCIA AND ASSOCIATES NORTH MERIDIAN ROAD - KALISPELL APRIL 8, 1997, GILL ITEMS F WORK PRIOPAU MJeCTI ENGINEER ENGINEEF� S28.851 $21.491 TRANS ENGINEE S23.75 TRANS! PLANNERI S17.971 IGN I TE HNICIA ENGINEER $18.581 $1514 ADMIN( ASSISTJ S10.82 T TOMPUTER AL RPA PERSONTIME W#W C S10.00 1. Extra coord., est., meetings, etc. (( 24 I I 961 1 120 76.8 2. Reviseplans- narrow 2WLTL I ( 4 8 12 11.0 3. Revise Int. layouts 2 81 161 26 22.4 4.Revise striping confi uration 2 4 8 14 11.4 5. Elim. striped & paved area 2 4 6 5.5 6. Adjust storm drain I 8 8 16 14.0 7. Adjust cross -sections 81 16 I 24 22.0 S. Rerun earthwork & split 1 1 12 4 17 13.2 S. Correct typical sections !) I 2 12 14 13.5 10. Add connections @ 3 Mile 4 2 28 28 62 50.2 11. Extra PIH & report 16 241 81 21 50 30.2 12. New title shts., note shts., etc. ! 2 -T 41 32 I 38 35.4 13. Extra final plan rev. & report report 14. Revise scope of work re I 12 1 16I 4 i 5 3.2 15. Revise env, document 1 8 2 11 5.2 16. Provide new approach 4 8 12 11.0 17. Misc. - contract admin. 4 1 1 4 0.8 LABOR COS S RPA SALARY OVER- LOADED DIRECT ADDITIVES HEAD RPA LABOR (0.6666) (0.5461) LABOR DIRECT JOB COSTS TOTAL PROFIT (Based on Labor Costs) $2,498.29 TOTAL PROJECT COST $31,300.00