4. Acceptance of NuPac Contract - Woodland Court ProjectAgenda -June 2, 1997 AGENDA ITEM 4 - ACCEPTANCE OF NUPAC CONTRACT -WOODLAND COURT PROJECT BACKGROUND/CONSIDERATION: I have enclosed a memo from the City Attorney concerning the final billing. (You have previously received a copy of this memo.) Based upon the analysis of the contract documents by our consulting engineer, the City Attorney, and an independent engineer's review and meetings with the three parties (Nupac, T D & H, City Staff), I have directed that T D & H prepare final payment based upon the recommendation enclosed within this memo. RECOMMENDATION: Based upon the recommendation of our consulting engineer, the City Attorney's review, and subsequent review of an independent engineer, I concur with the recommendation for a change order of $5,614 for extra services/material costs requested by Nupac. ACTION REQUIRED: Approval of final pay estimate and certificate of substantial completion of the Woodland Court project should be completed by MOTION. Thomas, Dean & Hoskins, Inc. t ff"D&^� Engineering Consultants 1 May 23, 1997 Clarence Krepps, City Manager City of Kalispell P.O. Box 1997 Kalispell, MT 59903-1997 RE: Woodland Court Project Dear Clarence: Enclosed is the Final Pay Estimate for NUPAC. We have included the items recommended for payment by the City Attorney. In all cases, the items added are increases to quantities of work included in the contract. A Change Order is not necessary since there is not change in unit price or time. Also enclosed is the Certificate of Substantial Completion. This should be accepted by the City. After Council approval, the Pay Estimate and Certificate should be forwarded to NUPAC along with the payment. NUPAC should sign and return the Pay Estimate. Very truly yours, THOMAS, DEAN & HOSKINS, INC. vv,) 'J L Michael W. Fraser MWF:mj K94-46-4 Encl: a: may23kre. ltr cc: Susan Moyer Glenn Neier 690 North Meridian, Suite 101 • Kalispell, MT 59901 • (406) 752-5246 • FAX (406) 752-5230 CITY OF KALISPELL PROJECT: WOODLAND COURT JOB #: K94-464 Amount Completed To Date Less Retained Percentage (0% of the total) Subtotal Dept. of Amount Due Revenue Contractor Estimate #1 $40,263.37 $402.63 $39,860.74 Estimate #2 $81,927.83 $819.28 $81,105.55 Estimate #3 $84,387.60 $843.88 $83,543.77 Estimate #4 $6,251.40 $62.51 $6,188.89 Estimate #5 $8,486.21 $84.86 $8,401.35 Estimate #6 $16,015.32 $160.15 $15,855.17 Estimate #7 $19,107.94 $191.08 $18,916.86 Less Previous Payments Amount Due Contractor Less 1 % Dept. of Revenue TOTAL AMOUNT DUE Date: May 23, 1997 Pay Estimate No. 8 (FINI Page 1 of 3 $287,575.12 $287,575.12 $256,439.67 $31,135.45 $311.35 $30,824.10 We hereby certify the work for which payment is hereon requested has been performed in accordance with the specifications. CONTRACTOR: PACK AND COMPANY Paul r m We hereby certify the foregoing is a true and correct statement of the amount due the Contractor for construction, to date, of the above project, and payment for same is hereby recommended. ENGINEER: THO S, DE N &,20SKINS, INC. By: G �c a raser, CITY OF KALISPELL APPROVED: Susan Moyer, City of Kalispell CITY OF KALISPELL Date: May 23, 1997 PROJECT: WOODLAND COURT Pay Estimate No. 8 JOB #: K94-464 Page 2 of 3 SCHEDULE I - SITE GRADING AND DRAINAGE IMPROVEMENTS VALUE OF WORK BID QUANTITY UNIT COMPLETED ITEM DESCRIPTION QUANTITY COMPLETED PRICE TO DATE 1. MOBILIZATION LUMP SUM 100% $10,000.00 $10,000.00 2 IMPORTEBORROWD 3900 CY 3527 CY $4.60 $16,224.20 3. EXCAVATION, TYPE I W/ TYPE A BACKFILL 40 CY 40 CY $7.00 $280.00 4. 12" STORM DRAIN PIPE, CLASS H, IN PLACE 120 LF 120 LF $25.00 $3,000.00 5. 12" CMP CULVERT, IN PLACE 104 LF 104 LF $35.00 $3,640.00 6. STORM DRAIN INLET 1 EA 1EA $1,500.00 $1,500.00 7. RIP RAP, IN PLACE 12 CF 12 CF $20.00 $240.00 SUBTOTAL SCHEDULE I $34,884.20 SCHEDULE II - WATER AND SEWER IMPROVEMENTS WATER i . TYPE II PIPE BEDDING MATERIAL, IN PLACE 50 CY 0 CY $18.00 $0.00 2. IMPORTED BACKFILL 1050 CY 881.3CY $13.00 $11,456.90 3. WATER MAINS, IN PLACE 8" PVC DR 18 1242 LF 1248LF $$17.00 $21,216.00 12" PVC DR 18 369 LF 363 LF $26.00 $9,438.00 4. GATE VALVES & VALVE BOX, IN PLACE 8" 4 EA 4EA $750.00 $3000.00 12" 2 EA 2 EA $1,200.00 $2:400.00 5. FIRE HYDRANTS W/ AUXILIARY GATE VALVES AND BOX, IN PLACE 3 EA 3 EA $2,500.00 $7,500.00 6. 3/4" WATER SERVICE, IN PLACE -INCLUDING PIPE, CORPORATION STOP, CURB STOP AND CURB BOX 24 EA 25EA $600.00 $15,000.00 7. CONNECTION TO EXISTING WATER MAIN, IN PLACE i EA lEA $1,500.00 $1,500.00 8. PRESSURE AND LEAKAGE TEST, COMPLETED & ACCEPTED -MIN OF 7§ % OF ITEM 7 LUMP SUM 100 % $500.00 $500.00 CITY OF KALISPELL PROJECT: WOODLAND COURT JOB #: K94-46-4 BID QUANTITY ITEM DESCRIPTION QUANTITY COMPLETED 9.--------- --------- CLEANING OF WATER_M�___------ -------- --- ------ M4INS-MIN OF 7§% OF ITEM 7 LUMP SUM 100 % 10. DISINFECTION AND BACTERIOLOGICAL TESTING OF WATER MAINS -MIN OF 5 % OF ITEM 7 LUMP SUM 1 EA 11. CAST IRON FITTINGS, IN PLACE 1240 LBS 2010 LBS SEWER 12. TYPE H PIPE BEDDING MATERIAL, IN PLACE 80 CY 76 CY 13. IMPORTED BACKFILL 3170 CY 3074.1 CY 14. EXCAVATION TYPE 2 W/ TYPE A BACKFILL 2250 CY 3697.1 CY TYPE 1 W/ TYPE A BACKFILL 1615 CY 0 CY 15. SANITARY SEWER, IN PLACE 8" PVC SDR 35 2423 LF 2428 LF 8" PVC DR 18 290 LF 310 LF 16. TESTING COMPLETE ,. _. AND ACCEPTED - MIN OF 3 % OF ITEM 15 LUMP SUM 100 % 17. SANITARY SEWER MANHOLE, IN PLACE 10 EA 8 EA 18. SANITARY SEWER DROP MANHOLE, IN PLACE 2 EA 2 EA 19. EXTRA DEPTH OF MANHOLE, IN PLACE 27 VF 33.8 VF 20. EXTRA DEPTH OF DROP MANHOLE, IN PLACE 16 VF 16.4 VF 21. SANITARY SEWER SERVICE, IN PLACE 712 LF 830 LF 22. CONNECTION TO EXISTING SEWER 1 EA 1 EA SUBTOTAL SCHEDULE II SUB -TOTAL SCHEDULES I & II APPROVED ADDITIONS AND DELETIONS 1.Connect to Existing Water Service (3) 2. Water Main Adjustment 3. Asphalt Pavement Replacement SUB -TOTAL ADDITIONS PROJECT TOTAL PRICE $500.00 $500.00 $3.00 $18.00 $13.00 $6.00 $6.00 13.00 16.00 $1,700.00 $3,665.00 $4,490.00 $180.00 $180.00 $10.00 $500.00 Date: May 23, 1997 Pay Estimate No. 8 Page 3 of 3 VALUE OF WORK COMPLETED TO DATE $500.00 $500.00 $6,030.00 $1,368.00 $39,963.30 $22,182.60 $0.00 $31,564.00 $4,960.00 $1,700.00 $29,320.00 $8,980.00 $6,084.00 $2,952.00 $8,300.00 $500.00 $236,914.80 $271,799.00 $1,168.01 $8,261.11 $6,347.00 $15,776.12 $287, 575.I2 CERTIFICATE OF SUBSTANTIAL COMPLETION OWNER's Project No. ENGINEER's Project No Project: South Woodland Court CONTRACTOR Pack & Company (NUPAC) K94-46-4 Contract For Schedules I & II Contract Date November 15 1995 This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: Schedule I, Site Grading and Drainage Improvements Schedule II, Water and Sewer Improvements To City of Kalispell Owner And To Pack & Company (NUPAC) Contractor The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER and Work is hereby declared to be substantially complete in accordance with the Contract Documents on August 16, 1996 DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within NIA days of the above date doff� Substantial Completion. The ENGINEER recommends acceptance of the Certificate of Substantial CotnpieAion in Jcordavce �ithJthe Contract Documents. THOMAS, DEAN & HOSKINS, INC. I Il � Z') t / Engineer L13 Date The City of Kalispell accepts the work as Substantially Complete and will assume full responsibility there of on the day of 1997 at (time). CITY OF KALISPELL Owner By: Date