09. Center Street Pedestrian CrossingAgenda -February 10, 1997
AGENDA ITEM 9 - CENTER STREET PEDESTRIAN CROSSING
BACKGROUND/CONSIDERATION: I have enclosed a memo from John Wilson
summarizing the Engineering Study for this potential project. You
may recall that we did not take any action on this item at the
previous discussion meeting. I assume you still have your reports.
If you do not, please let us know before Monday night so we can
make a copy for you.
RECOMMENDATION: I have had several discussions with Mr. Babb and
with John Wilson concerning this report. Due to the costs of the
traffic study recommendation, we have concluded that the
recommendation outlined in John's memo is the only way that we can
achieve the actual traffic signalization.
ACTION REQUIRED: A decision for this project is needed. If you
desire to move ahead with our recommendation, we should have a
motion to authorize Staff to engage an engineer to begin the plan
process.