04. Resolution 4303 - Woodland Court/Teton Terrace Change OrderAgenda -December 30, 1996 AGENDA ITEM 4 Woodland Court/Teton Terrace Change Woodland Construction: BACKGROUND/CONSIDERATION: I have enclosed a lengthy explanation of this item from Mike Fraser, engineer for Thomas, Dean and Hoskins Inc. As you will see, the construction of Schedule I & II took an extreme amount of time to compete their portion of the Woodland Court Project. Forty three working days were allowed by contract but the project was completed in 122 working days. This delay caused the City to incur additional engineering fees for this portion of the contract of $8,636.00. Based upon the analysis done by the engineer, we should recover this amount from NuPac since this amount of additional costs is directly related to the delay of the contractor. This would be a recovery of actual damages rather than liquidated damages. Woodland Construction Schedule II improvements were contracted by "A-1 Paving. This phase of construction was also delayed causing additional engineering costs of $3,240.53. The engineer also recommends assessing those fees to the contractor. This is also a recovery of actual damages rather than liquidated damages. Teton Terrace: These improvements were completed by Sandon Construction as per the specified contract time frame. There are no damages considered in this project. RECOMMENDATION: Susan Moyer, Glen Neier, Mike Fraser and I have reviewed and discussed the engineering report for these projects. Agenda -December 30, 1996 We concur and recommend the damage recovery for NuPac and for A-1 Paving. We also concur in the increased fee for the engineering services. ACTION REQUIRED: A. Motion approving the assessment of actual damages to the City from NuPac in the amount of $8,635.80. This amount will be deducted from the final payment. B. Motion approving the assessment of actual damages to the City from A-1 Paving in the amount of $3,240.53. This amount will be deducted from the final payment. C. Motion to approve change order #2 to the A-1 Paving to increase the contract by $10,960.00. This includes: sidewalk relocation, concrete base for light poles, and a road culvert extension of length. This also increases the contract time by 16 days. D. Approval of the final pay estimates as enclosed should be approved by motion of the Council. 1. NuPac-$18,916.86-If damages are approved as recommended this amount will be $10,281.06. 2. A-1 Paving-$40,521.49-If damages are approved as recommended this amount will be $37,280.96. E. Approval of addendum D to the Thomas, Dean & Hoskins Inc. contract to reflect the additional fees required due to the additional observation needed with the contractor extended time frames. This addendum increases the fees to $59,225.00 to cover all of the engineering costs for Woodland. * Woodland Court Project Costs * Teton Terrace Project Costs Budget $282,840.00 Actual $240,787.35 RESOLUTION NO. 4303 A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITH A-1 PAVING ON THE WOODLAND COURT PROJECT, MT HOME M94-SG300117/MT--CDBG-94HR-06. WHEREAS, the City on November 15, 1995 did enter into a contract with A-1 Paving, Kalispell, MT fbr the construction of certain improvements connected with the Woodland Court Project, and WHEREAS, certain elements in the project required additional work, as well as time to complete; and said. additional work and time requirements could not have been necessarily foreseeable when the original construction contract was entered into, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advise and recommendation of Roger Sommerville, of Thomas, Dean and Hoskins, Inc, (the City's Consulting Engineers) it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and A-1 Paving, dated November 13, 1996, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the alterations and modifications are agreed to in writing, signed by the City Manager, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROSTE� BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS ((�� DAY OF aiA u-Q , 1997. Dougl s D. Rauthe, Mayor ATTEST: Debbie Gif CMC Clerk of Council is\wp\chngeord.wpd EXHIBIT SOUTH WOODLAND COURT CHANGE ORDER CONTRACTOR: A-1, Inc. PROJECT: K94-46-4 Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of drainage ditch to the east edge of South Woodland Drive. Add extension of access road drainage culverts. Includes setting culvert section to grade, attaching to existing culverts and backfilling with 3/4 inch crush gravel base course subgrade and top soil materials. Add construction storm drainage swale per direction of City of Kalispell Engineer to the north and east side of the subdevelopment area. Add place top soil on access right-of-way in the boulevard between the curb and sidewalk and along the outside edge of the sidewalks. ITT NO. DESCRIPTION QUANTITY COST AMOUNT 1. Concrete Light Pole Bases, in Place 4 EA $300.00 $ 1,200.00 2. Clearing and Excavation 4 HRS $100.00 $ 400.00 3. Extend 12" CMP Culvert 16 LF $ 35.00 $ 560.00 4. Construct Drainage Swale 8 HRS $100.00 $ 800.00 5. Place Top Soil 80 HRS $100.00 $ 8,000.00 TOTAL $10, 960.00 CHAINTGE ORDER P Q ORE DAB AGREEMENT DATE: 11/15/95 NAME OF PROJECT CITY OF KALISPELL MT "WOODLAND COURT PROJECT" MT HOME M94-SG300117/MT-CDBG-94HR-06 OWNER CITY OF KALISPELL CONTRACTOR A-1 PAVING The following changes are hereby made to the CONTRACT DOCUMENTS: Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfsll for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with an imported borrow of subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of the right of way drainage ditch on South Woodland Drive to the edge of the road. Add extend the north and south access road drainage culverts to match the existing ditch and fill slope. This includes removing existing vegetation and soils to match ditch grade and backfilling with materials to match existing culvert fill. Add construct storm drainage Swale along north and east sides of subdivision to drain storm waters to south east corner. Add place top soil on boulevard right-of-way and outside edge of the subdivision sidewalks. Add above to Schedule III contract, based on unit prices from the original contract and as shown on Exhibit A. Justification: The concrete bases for the subdivision light poles were not included in Change Order No. 1 documents and must be added to the contract. The City of Kalispell directed the sidewalk re -located from the center of the street right-of-way to the east edge of the right-of-way then the west edge. This requires the contractor to clear, grub, remove the topsoil and import fill to re-establish natural compacted grade. The contractor will place the crushed gravel base course and concrete sidewalk per contract prices. The access road culverts were found to be too short with the designed 4:1 fill slope and were at a 1:1 slope. For safety reasons and standard design the culvert must be extended to give adequate ground slopes at the culverts ends. The City Engineer requested the drainage Swale construction to move spring and summer storm run-off away from the north edge of the project. Schedule I covered placing top soil back over the disturbed construction areas in the street right-of-way. Contractor must place top soil between road curb and sidewalk and along the outside edge of the sidewalks, throughout the right-of-way. Change to CONTRACT PRICE: Original CONTRACT PRICE: $ 80,056.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER:$102,865.50 The CONTRACT PRICE due to this CHANGE ORDER will increase: $10,960.00 The new CONTRACT PRICE including this CHANGE ORDER will be $113,825.50 CHANGE of CONTRACT TIME: The CONTRACT TIME will increase by 16 days. The date for completion of all work will be 70 days after the lst day of Schedule III contract time. � Recommended By: Accepted By: RogerSq�ierville, P.E., Thomas, Dean & Hoskins, Inc. Clarence Krepps, City Manager, City of Kalispell SOUTH WOODLAND COURT CHANGE ORDER NO. 2 CONTRACTOR: A-1, Inc. PROJECT: K94-46-4 Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of drainage ditch to the east edge of South Woodland Drive. Add extension of access road drainage culverts. Includes setting culvert section to grade, attaching to existing culverts and backfilling with 3/4 inch crush gravel base course subgrade and top soil materials. Add construction storm drainage swale per direction of City of Kalispell Engineer to the north and east side of the subdevelopment area. Add place top soil on access right-of-way in the boulevard between the curb and sidewalk and along the outside edge of the sidewalks. ITEM NO. DESCRIPTION QUANTITY COST AMOUNT 1. Concrete Light Pole Bases, in Place 4 EA $300.00 $ 1,200.00 2. Clearing and Excavation 4 HRS $100.00 $ 400.00 3. Extend 12" CMP Culvert 16 LF $ 35.00 $ 560.00 4. Construct Drainage Swale 8 HRS $100.00 $ 800.00 5. Place Top Soil 80 HRS $100.00 $ 8,000.00 TOTAL $10,960.00 #' 1 ' DATE 1143-96 AGREEMENT DATE: 11115/95 NAME OF PROJECT CITY OF KALISPELL, MT "WOODLAND COURT PROJECT" MT HOME M94-SG3001I7/MT-CDBG-94HR-06 - OWNER CITY OF KALISPELL CONTRACTOR A-1 PAVING The following changes are hereby made to the CONTRACT DOCUMENTS: Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with an imported borrow of subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of the right of way drainage ditch on South Woodland Drive to the edge of the road. Add extend the north and south access road drainage culverts to match the existing ditch and fill slope. This includes removing existing vegetation and soils to match ditch grade and backfilling with materials to match existing culvert fill. Add construct storm drainage Swale along north and east sides of subdivision to drain storm waters to south east corner. Add place top soil on boulevard right-of-way and outside edge of the subdivision sidewalks. Add above to Schedule III contract, based on unit prices from the original contract and as shown on Exhibit A. Justification: The concrete bases for the subdivision light poles were not included in Change Order No. 1 documents and must be added to the contract. The City of Kalispell directed the sidewalk re -located from the center of the street right-of-way to the east edge of the right-of-way then the west edge. This requires the contractor to clear, grub, remove the topsoil and import fill to re-establish natural compacted grade. The contractor will place the crushed gravel base course and concrete sidewalk per contract prices. The access road culverts were found to be too short with the designed 4:1 fill slope and were at a 1:1 slope. For safety reasons and standard design the culvert must be extended to give adequate ground slopes at the culverts ends. The City Engineer requested the drainage swale construction to move spring and summer storm run-off away from the north edge of the project. Schedule I covered placing top soil back over the disturbed construction areas in the street right-of-way. Contractor must place top soil between road curb and sidewalk and along the outside edge of the sidewalks, throughout the right-of-way. Change to CONTRACT PRICE: Original CONTRACT PRICE: $ 80,056.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER:$102.865.50 The CONTRACT PRICE due to this CHANGE ORDER will increase: $10,960.00 The new CONTRACT PRICE including this CHANGE ORDER will be $113,825.50 CHANGE of CONTRACT TIME: The CONTRACT TIME will increase by 16 days. The date for completion of all work will be 70 days after the lst day of Schedule III contract time. Requested By: Recommended By: ing P.E., Thomas, Dean & Hoskins, Inc. Accepted By: Clarence Krepps, City Manager, City of Kalispell CONTRACTOR: A-1, Inc. PROJECT: K94-46-4 Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of drainage ditch to the east edge of South Woodland Drive. Add extension of access road drainage culverts. Includes setting culvert section to grade, attaching to existing culverts and backfilling with 3/4 inch crush gravel base course subgrade and top soil materials. Add construction storm drainage swale per direction of City of Kalispell Engineer to the north and east side of the subdevelopment area. Add place top soil on access right-of-way in the boulevard between the curb and sidewalk and along the outside edge of the sidewalks. ITEM NO. DESCRIPTION QUANTITY COST AMOUNT 1. Concrete Light Pole Bases, in Place 4 EA $300.00 $ 1,200.00 2. Clearing and Excavation 4 HRS $100.00 $ 400.00 3. Extend 12" CMP Culvert 16 LF $ 35.00 $ 560.00 4. Construct Drainage Swale 8 HRS $100.00 $ 800.00 5. Place Top Soil 80 HRS $100.00 $ 8,000.00 TOTAL $10,960,00 ....m,..___ ENGINEERING CONSULTANTS 690 North Meridian, Suite 101 • Kalispell, Montana 59901 • (406) 752-5246 • FAX (406) 752-5230 December 5, 1996 Susan Moyer City of Kalispell P.O. Box 1997 Kalispell, MT 59903-1997 RE: Woodland Court/Teton Terrace Dear Susan: Attached is the financial summary on the two projects. We will discuss each project in detail but may summarize project status as saying both projects are substantially complete and under budget. Woodland Court: Schedule I & II, NUPAC is the contractor for the water, sewer, drainage and subbase preparation. Contract amount was $280, 847.00. Change orders were approved by the council allowing work to progress on a working day and days worked basis. The contractor worked intermittently thru the winter, spring and summer of 1996. Sixty calendar days or 43 working days were allocated by contract. With the change orders, the project was completed in 122 working days. First day of contract time was December 6, 1995, at which time work commenced on a days worked contract per Change Order No. 1. On March 16, 1996, the 37th day worked, the contract time was changed to working day, any day on which site conditions allowed proceeding. The 60th day was May 6, 1996. Contract work was substantially complete on August 16, 1996 the 122nd day. Enclosed is the final pay estimate for processing. Section 1005 provides for fees and liquidated damages. Paragraph 3.2 defines the fees and Paragraph 3.2.5 states "the Contractor shall reimburse the Owner for all costs incurred as a result of the Contractor's failure to complete the work within the time period specified..." Engineering fees from bidding through May 6, 1996 are $29,190.82. Our fee estimate was $27,165.00 for 90 calendar days or sixty-four working days of construction for all three schedules. Sixty for Schedules I & II and 30 for Schedule III. This fee was expended in six months of construction or sixty working days because of the increased pay estimates, administration and the extended construction time of the working day contract. The amount of GO% OFFICES IN GREAT FALLS, BOZEMAN, KALISPELL, SPOKANE AND LEWISTON ACEC Susan Moyer December 5, 1996 Page 2 $2,025.82 should be a contract increase to the engineer. After May 6, 1996, through August 16, 1996, TD&H incurred fees of $8,635.80. which should be deducted from the Contractor NUPAC. The contract provides for a $200.00 per day liquidated damages fee. We recommend the City refer the assessments of damages to the attorney. Final construction contract amount with all change orders will be $276,736.50 or $4,110.50 less than the original contract. Schedule III. Contractor is A-1 Paving for a contract amount of $80,056.00. Contract time was 30 calendar days. Enclosed is the final pay estimate and change order for processing. First day of contract was August 19, 1996, construction commenced on a calendar day basis. Change Orders to the A-1 contract added the basic electrical, telephone and cable t.v., street light bases and top soil behind the curb. With Change Order No. 1 and proposed Change Order No. 2, enclosed, contract time is 58 calendar days. The last day of contract time was October 25, 1996, which was the 68th day. Engineering fees from August 16, 1996 through October 15, 1996, the 54th day are $18,293.49. These fees should be added to the engineering agreement. Fees from October 11, 1996 through October 25, 1996 are $3,240.53. We recommend assessing the Contractor the fees from October 15, 1996 through completion, $3,240.53. A-l's final contract amount will be $132,222.00 which is for the base course, asphalt, sidewalk curb and gutter, drainage swale and backbone electrical. The engineers construction management contract should be increased to $58,735.00 to cover these increases in time and services. Completion costs for Woodland court including the increased engineering is $488,914.00 compared with a budget of $489,748.00. TETON TERRACE Contractor is Sandon Construction with a contract amount of $191,525.76. The first day of construction was July 22, 1996. The project was substantially complete on October 19, 1996. Contract time was 90 calendar days. The project was completed on time. Susan Moyer December 5, 1996 Page 3 The electrical service to the lots was added to Sandon's contract which increased the contract to $197,823.76. Final contract amount will be $198,252.35. Final pay estimate is enclosed. Inspection fees were budgeted for $27,165.00. The final invoice will total $25,298.24, which is $1, 866.76 under the contract. Completion costs for Teton Terrace including all construction and engineering is $240,787.35 compared with a budget of $282,840.00. We have also enclosed a contract amendment increasing the engineering in Woodland from $27,900.00 to 59,255.00 and decreasing Teton Terrace from $27,165.00 to $25,300.00 Please contact us if you have any questions. Very truly yours, THOMA , DEAN & HOSKINS, INC. V� Michael W. Fraser MWF: sb K94-46-5 K94-46-4 c: dec5moye.ltr Encl: A A 1 _ SITES I & 2 -- CONSTRUCTION & ENGINEERING COSTS 2_ 3 Contract w/Nupac for Schedules I & II 4 Change Order 41 - Change to working day 5 Change Order 42 - Relocate water main which was too close to sewer line, add asp 6 s replacement at driveways which had been in A-1 Paving's scope of work 7 Contract w/A-I Paving for Schedule III Con! B G- 3riginthe contractors to pay for J dgt;:ontract time. This would amount to 4upac and $3,241 from A-1 Paving i �r cost would be $19,274. f 9 ,ommended dama4es from the two i 10 ` b ultimately will bring the 'I 1 ie for $12,915 under the current 12 Total of Schedules I, II and III $327,4 r budget for both sites. 13 Contingency Budget 20 G j 4 Total Construction Budget and/or Expenses $347,4 —1' 16 . Engineering Design. 17 Engine ermg -Construction Management Total Engineering Costs $59,4 19 Speciality Utility Work: `^ 20 PTI -Design & installationof phone service $7, -- 21 22 PP&L -'Line extension forlstreei lighting : „ .. $14,4c>. sst 23 PP&L -De of Elecd3cal Backiione System, - 14 z. r y,. 24 $41,F 25 26 Total Site Construction & Engineering Costs $448, i --- 27 — 28 Contract with Sandon $272J i 29 Contingency Budget6 30 Total Construction Budget $289,5 _ 31_ 32 Engineering Design � ` l 33 Engineering - Construction it?ana erirent 34 Total Engineering Costs $49,! ! 35 PTI -Design and 'rnstallatioci of phone servree r $7, 36 Utility Trench Work Change Order #1 Sandon $5, 37 PP&L -Lino extension forstreet IIg}ff#ng 14, Z$ PP&L-DeaignofElect<teatBackbone Systeas >: . �14,'- r — 9 _ a Speciality Utility Work .,. $41,f 40 41 Total Site Construction & Engineering Costs $380,1 E 42 TOTAL BOTH SITES FOR CONSTRUCTION & ENGINEERING $829,, 09-Dec-96 09::3 AM CITY OF KALISPELL PROJECT: WOODLAND COURT Date: November 20, 199(. Pay Estimate No. 7 JOB #: K94-46-4 Page I of 3 Amount Complete6 To Date $269,936.50 Less Retained Percentage (5 % of the total) JI3 496.83 Subtotal $256,439.67 Dept. of Amount Due Revenue Contractor Estimate #1 $40,263.37 $402.63 $39,860.74 Estimate #2 $81,927.83 $819.28 $81,105.55 Estimate #3 $84,387.60 $843.88 $83,543.77 Estimate #4 $6,251.40 $62.51 $6,188.89 Estimate #5 $8,486.21 $84.86 $8,401.35 Estimate #6 $16,015.32 $160.15 $15,855.17 Less Previous Payments $237,331.73 Amount Due Contractor $19.107.94 Less 1 % Dept. of Revenue $191.08 TOTAL AMOUNT DUE $18,916.86 We hereby certify the work for which payment is hereon requested has been performed in accordance with the specifications. CONTRACTOR: PACK AND COMPANY Paul fira ham We hereby certify the foregoing is a true and correct statement of the amount due the Contractor for construction, to date, of the above project, and payment for same is hereby recommended. ENGRDMR: THO & HOSKINS, INC. By. og me CITY OF KALIBSPELL APPROVE f1san Moyer, City o CITY OF KALISPELL PROJECT: WOODLAND COURT JOB #: K94-46-4 SCHEDULE I - SITE GRADING AND DRAINAGE IMPROVEMENTS BID Q114�tj�M 1. MOBILIZATION LUMP SUM 2. IMPORTED BORROW 3900 CY 3. EXCAVATION, TYPE I W/ TYPE A BACKFILL 40 CY 4. 12" STORM DRAIN PIPE, CLASS H, IN PLACE 120 LF 5. 12- CMP CULVERT, IN PLACE 104 LF 6. STORM DRAIN INLET I EA 7. RIP RAP, IN PLACE 12 CF SUBTOTAL SCHEDULE I SCHEDULE H - WATER AND SEWER IMPROVEMENTS WATER 1. TYPE 11 PIPE BEDDING MATERIAL, IN PLACE so CY 2. IMPORTED BACKFILL 1050 CY 3. WATER MAINS, IN PLACE 8" PVC DR 18 1242 LF 12" PVC DR 18 369 LF 4. GATE VALVES & VALVE BOX, IN PLACE 8- 4EA 12" 2EA 5. FIRE HYDRANTS W/ AUXILIARY GATE VALVES AND BOX, IN PLACE 3EA 6. 314- WATER SERVICE, IN PLACE -INCLUDING PIPE, CORPORATION STOP, CURB STOP AND CURB BOX 24 EA 7. CONNECTION TO EXISTING WATER MAIN, IN PLACE IEA 8. PRESSURE AND LEAKAGE TEST, COMPLETED & ACCEPTED -MIN OF 7§% OF ITEM 7 LUMP SUM 50% 2102.3 CY OCY 120 LF 104 LF IEA 12CF OCY 881.3 CY 1248 LF 363 LF 4EA 2EA PRICE UNIT $10,000.00 $4.60 $7.00 $25.00 $35.00 $1,500.00 $20.00 $18.00 $13.00 7.00 6.00 $750.00 $1,200.00 3EA $2,500.00 Date: November 20,1994 Pay Estimate No. 7 Page 2 of 3 VALUE OF WORK COMPLETED TO DATE $5,000.00 $9,670.58 $0.00 $3,000.00 $3,640.00 $1,500.00 $240.00 $23,050.58 $0.00 $11,456.90 $21216.00 $9:438.00 22EA $600.00 $13,200.00 IEA $1,500.00 $1,500.00 100% $500.00 $500.00 CITY OF KALISPELL PROJECT: WOODLAND COURT JOB#: K94464 BID UANTITY Q ITEM DESCRIPTION Y COMPLETED 9. CLEANING OF WATER MAINS -MIN OF 7§% OF ITEM 7 LUMP SUM 100% 10. DISINFECTION AND BACTERIOLOGICAL TESTING OF WATER MAINS -MIN OF 5% OF ITEM 7 LUMP SUM IEA IL CAST IRON FITTINGS, IN PLACE 1240 LBS 1023 LBS SEWER 12. TYPE 11 PIPE BEDDING MATERIAL, IN PLACE 80 CY 18 CY 13. IMPORTED BACKFILL 3170 CY 3074.1 CY 14. EXCAVATION TYPE 2 W/ TYPE A BACKFILL 2250 CY 3697.1 CY TYPE I W/ TYPE A BACKFILL 1615 CY OCY 15. SANITARY SEWER, IN PLACE 8" PVC SDR 35 2423 LF 2428 LF 8" PVC DR 18 290 LF 310LF 16. TESTING COMPLETE AND ACCEPTED - MIN OF 3% OF ITEM 15 LUMP SUM 100% 17. SANITARY SEWER MANHOLE, IN PLACE 10 EA 8EA 18. SANITARY SEWER DROP MANHOLE, IN PLACE 2EA 2EA 19. EXTRA DEPTH OF MANHOLE, IN PLACE 27 VF 33.8 VF 20. EXTRA DEPTH OF DROP MANHOLE, IN PLACE 16 VF 16.4 VF 21. SANITARY SEWER SERVICE, IN PLACE 712 LF 830 LF 22. CONNECTION TO EXISTING SEWER lEA IEA SUBTOTAL SCHEDULE H SUB -TOTAL SCHEDULES I & 11 APPROVED ADDITIONS AND DELETIONS I. Connect to Existing Water Service (3) 2. Water Main Adjustment 3. Asphalt Pavement Replacement SUB -TOTAL ADDITIONS PROJECT TOTAL UNIT PRICE 0 $18.00 $13.00 $6.00 $6.00 13.00 16.00 $1,700.00 $3,665.00 $4,490.00 $180.00 $180.00 $10.00 $500.00 Date: November 20, 19% Pay Estimate No. 7 Page 3 of 3 VALUE OF WORK COMPLETED TO DATE $500.00 $500.00 $3,069.00 $324.00 $39,963.30 $22,182.60 $0.00 $31,564.00 $4,960.00 $1,700.00 $29,320.00 $8,980.00 $6,094.00 $2,952.00 $8,300.00 $500.00 $231,109.80 $254,160-38 $1,168.01 $8,261.11 $6,347.00 $15,776.12 $269,936.50 CITY OF KALISPELL Date: November 19, 1996 PROJECT: WOODLAND COURT Pay Estimate No. 2(A1) JOB #: K94-46-4 Page I of 2 Amount Completed To Date $132,222.00 Less Retained Percentage (5 % of the total) 16,611.10 Subtotal $125,610.90 Dept. of Total Revenue Contractor Estimate #1 $84,680.10 $846.80 $83,833.30 Estimate #2 $40,930.80 $409.31 $40,521.49 Estimate #3 Estimate #4 Less Previous Payments $84,680.10 r Amount Due Contractor $40,930.80 Less 1 % Dept. of Revenue $409.31 TOTAL AMOUNT DUE $40,521.49 We hereby certify the work for which payment is hereon requested has been performed in accordance with the specifications. CONTRACTOR: A-1 PAVING, INC. Arnie Mohl We hereby certify the foregoing is a true and correct statement of the amount due the Contractor for construction to date, of the above project, and payment for same is hereby recommended. ENGINEER: THOMA-'-',�N & HOSKINS, INC. By. Roge S ervz e, CITY OF KALISPELL APPROVED: Susan Moyer, City of Kalispell E CITY OF KALISPELL PROJECT: WOODLAND COURT JOB °#: K94-46-4 SCHEDULE III - STREET PAVING IMPROVEMENTS BID QUANTITY ITEM DESCRIPTION QUANTITY COMPLETED 1. Subbase Course Material 1550 CY 1675 CY 2. Crushed Gravel Material 312 CY 684 CY 3. Bituminous Prime Coat 1270 GAL 0 GAL 4. Bituminous Tack Coat 360 GAL 170 GAL 5. Asphalt Pavement 3640 SY 3957 SY 6. Combined Curb & Gutter 1190 LF 2535 LF 7. Concrete Sidewalk 9750 SF 12545 SF 8. Concrete Inlet Apron 4 SY 0 SY 9. Concrete Valley Gutter 13 SY 13.3 SY 10. Moved to Schedule I&11 0 0 11. Asphalt Pavement Overlay 250 SY 0 SY CO #1 Electrical Utility Const. LUMP SUM 1 CO #2 Concrete Light Pole Bases 4 EA 4 EA Clearing & Excavation 4 HRS 8 HRS Extend 12" CMP Culvert 16 LF 16 LF Construct Drainage Swale 8 HR 8 HR Place Top Soil 80 HR 80 HR TOTAL SCHEDULE III Date: November 19, 1996 Pay Estimate No. 2(A1) Page 2 of 2 UNIT VALUE OF WORK PRICE COMPLETED TO DATE $12.00 $20,100.00 $18.00 $12,312.00 $2.00 $0.00 $3.00 $510.00 $5.50 $21,763.50 $7.00 $17,745.00 $2.00 $25,090.00 $0.00 $0.00 $40.00 $532.00 $0.00 $0.00 $11.00 $0.00 $22,809.50 $22,809.50 $300.00 $1,200.00 $100.00 $800.00 $35.00 $560.00 $100.00 $800.00 $100.00 $8,000.00 $132,222.00 AMR Q -2t4� �a DATE 11-13-96 AGREEMENT DATE: 11/15/95 NAME OF PROJECT CITY OF KALISPELL MT "WOODLAND COURT PROJECT" MT HOME M94-SG300117/MT-CDBG-94HR-06 OWNER CITY OF KALISPELL CONTRACTOR A-1 PAVING The following changes are hereby made to the CONTRACT DOCUMENTS: Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with an imported borrow of subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of the right of way drainage ditch on South Woodland Drive to the edge of the road. Add extend the north and south access road drainage culverts to match the existing ditch and fill slope. This includes removing existing vegetation and soils to match ditch grade and backfilling with materials to match existing culvert fill. Add construct storm drainage swale along north and east sides of subdivision to drain storm waters to south east corner. Add place top soil on boulevard right-of-way and outside edge of the subdivision sidewalks. Add above to Schedule III contract, based on unit prices from the original contract and as shown on Exhibit A. Justification: The concrete bases for the subdivision light poles were not included in Change Order No. 1 documents and must be added to the contract. The City of Kalispell directed the sidewalk re -located from the center of the street right-of-way to the east edge of the right-of-way then the west edge. This requires the contractor to clear, grub, remove the topsoil and import fill to re-establish natural compacted grade. The contractor will place the crushed gravel base course and concrete sidewalk per contract prices. The access road culverts were found to be too short with the designed 4: 1 fill slope and were at a 1: 1 slope. For safety reasons and standard design the culvert must be extended to give adequate ground slopes at the culverts ends. The City Engineer requested the drainage swale construction to move spring and summer storm run-off away from the north edge of the project. Schedule I covered placing top soil back over the disturbed construction areas in the street right-of-way. Contractor must place top soil between road curb and sidewalk and along the outside edge of the sidewalks, throughout the right-of-way. Change to CONTRACT PRICE: Original CONTRACT PRICE: $80J_056.00 . Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $102,865.50 The CONTRACT PRICE due to this CHANGE ORDER will increase: $10,960.00 The new CONTRACT PRICE including this CHANGE ORDER will be $113,825.50 . CHANGE of CONTRACT TIME: The CONTRACT TIME will increase by 16 days. The date for completion of all work will be 70 days after the lst day of Schedule III contract time. Requested By: Recommended By: Accepted By: Paving , P.E., Thomas, Dean & Hoskins, Inc. Clarence Krepps, City Manager, City of Kalispell DATE 11-13-96 AGREEMENT DATE: 11/15/95 NAME OF PROJECT CITY OF KALISPELL, MT "WOODLAND COURT PROJECT" MT HOME M94-SG300117/MT-CDBG-94HR-06 OWNER CITY OF KALISPELL CONTRACTOR A-1 PAVING The following changes are hereby made to the CONTRACT DOCUMENTS: Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with an imported borrow of subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of the right of way drainage ditch on South Woodland Drive to the edge of the road. Add extend the north and south access road drainage culverts to match the existing ditch and fill slope. This includes removing existing vegetation and soils to match ditch grade and backfilling with materials to match existing culvert fill. Add construct storm drainage swale along north and east sides of subdivision to drain storm waters to south east comer. Add place top soil on boulevard right-of-way and outside edge of the subdivision sidewalks. Add above to Schedule III contract, based on unit prices from the original contract and as shown on Exhibit A. Justification: The concrete bases for the subdivision light poles were not included in Change Order No. 1 documents and must be added to the contract. The City of Kalispell directed the sidewalk re -located from the center of the street right-of-way to the east edge of the right-of-way then the west edge. This requires the contractor to clear, grub, remove the topsoil and import fill to re-establish natural compacted grade. The contractor will place the crushed gravel base course and concrete sidewalk per contract prices. The access road culverts were found to be too short with the designed 4: 1 fill slope and were at a 1: 1 slope. For safety reasons and standard design the culvert must be extended to give adequate ground slopes at the culverts ends. The City Engineer requested the drainage swale construction to move spring and summer storm run-off away from the north edge of the project. Schedule I covered placing top soil back over the disturbed construction areas in the street right-of-way. Contractor must place top soil between road curb and sidewalk and along the outside edge of the sidewalks, throughout the right-of-way. Change to CONTRACT PRICE: Original CONTRACT PRICE: $ 80,056.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $102,865.50 The CONTRACT PRICE due to this CHANGE ORDER will increase: $10960.00 The new CONTRACT PRICE including this CHANGE ORDER will be $113,825.50. CHANGE of CONTRACT TIME: The CONTRACT TIME will increase by 16 days. The date for completion of all work will be 70 days after the 1st day of Schedule III contract time. Requested By: Recommended By: Accepted By: ving ) P.E., Thomas, Dean & Hoskins, Inc. Clarence Krepps, City Manager, City of Kalispell CONTRACTOR: A-1, Inc. PROJECT: K94-46-4 Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of drainage ditch to the east edge of South Woodland Drive. Add extension of access road drainage culverts. Includes setting culvert section to grade, attaching to existing culverts and backfilling with 3/4 inch crush gravel base course subgrade and top soil materials. Add construction storm drainage swale per direction of City of Kalispell Engineer to the north and east side of the subdevelopment area. Add place top soil on access right-of-way in the boulevard between the curb and sidewalk and along the outside edge of the sidewalks. ITEM NO. DESCRIPTION QUANTITY COST AMOUNT 1. Concrete Light Pole Eases, in Place 4 EA $300.00 $ 1,200.00 2. Clearing and Excavation 4 HRS $100.00 $ 400.00 3. Extend 12" CMP Culvert 16 LF $ 35.00 $ 560.00 4. Construct Drainage Swale 8 HRS $100.00 $ 800.00 5. Place Top Soil 80 HRS $100.00 $ 8,000.00 TOTAL $10,960.00 i DATE I 1-13-96 AGREEMENT DATE: 11/15/95 NAME OF PROJECT CITY OF KALISPELL, MT "WOODLAND COURT PROJECT" MT HOME M94-SG300117/MT-CDBG-94HR-06 OWNER CITY OF KALISPELL CONTRACTOR A-1 PAVING The following changes are hereby made to the CONTRACT DOCUMENTS: Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfzll for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with an imported borrow of subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of the right of way drainage ditch on South Woodland Drive to the edge of the road. Add extend the north and south access road drainage culverts to match the existing ditch and fill slope. This includes removing existing vegetation and soils to match ditch grade and backfilling with materials to match existing culvert fill. Add construct storm drainage swale along north and east sides of subdivision to drain storm waters to south east corner. Add place top soil on boulevard right-of-way and outside edge of the subdivision sidewalks. Add above to Schedule III contract, based on unit prices from the original contract and as shown on Exhibit A. Justification: The concrete bases for the subdivision light poles were not included in Change Order No. 1 documents and must be added to the contract. The City of Kalispell directed the sidewalk re -located from the center of the street right-of-way to the east edge of the right-of-way then the west edge. This requires the contractor to clear, grub, remove the topsoil and import fill to re-establish natural compacted grade. The contractor will place the crushed gravel base course and concrete sidewalk per contract prices. The access road culverts were found to be too short with the designed 4: 1 fill slope and were at a 1: 1 slope. For safety reasons and standard design the culvert must be extended to give adequate ground slopes at the culverts ends. The City Engineer requested the drainage swale construction to move spring and summer storm run-off away from the north edge of the project. Schedule I covered placing top soil back over the disturbed construction areas in the street right-of-way. Contractor must place top soil between road curb and sidewalk and along the outside edge of the sidewalks, throughout the right-of-way. Change to CONTRACT PRICE: Original CONTRACT PRICE: $80-056.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDER: $102,865.50 The CONTRACT PRICE due to this CHANGE ORDER will increase: $10,960.00 The new CONTRACT PRICE including this CHANGE ORDER will be $113,825.50 _. CHANGE of CONTRACT TIME: The CONTRACT TIME will increase by 16 days. The date for completion of all work will be 70 days after the ist day of Schedule III contract time. ��l N Recommended By: Accepted By: -1 Paving , P.E., Thomas, Dean & Hoskins, Inc. Clarence Krepps, City Manager, City of Kalispell WE`:� CONTRACTOR: A-1, Inc. PROJECT: K94-46-4 Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of drainage ditch to the east edge of South Woodland Drive. Add extension of access road drainage culverts. Includes setting culvert section to grade, attaching to existing culverts and backfilling with 3/4 inch crush gravel base course subgrade and top soil materials. Add construction storm drainage swale per direction of City of Kalispell Engineer to the north and east side of the subdevelopment area. Add place top soil on access right-of-way in the boulevard between the curb and sidewalk and along the outside edge of the sidewalks. ICI NO. DESCRIPTION QUANTITY COST AMOUNT 1. Concrete Light Pole Bases, in Place 4 EA $300.00 $ 1,200.00 2. Clearing and Excavation 4 HRS $100.00 $ 400.00 3. Extend 12" CMP Culvert 16 LF $ 35.00 $ 560.00 4. Construct Drainage Swale 8 HRS $100.00 $ 800.00 5. Place Top Soil 80 HRS $100.00 $ 8,000.00 TOTAL $10,960.00 Add four (4) street light pole concrete bases along the access road for Woodland Court, see enclosed sketch. Add clearing and excavation, Type I with Type A backfill for sidewalk parallelling South Woodland Court. This includes removing the vegetation and topsoil and filling with subbase course and crushed gravel material for 415 lineal feet. Moving sidewalk from center of drainage ditch to the east edge of South Woodland Drive. Add extension of access road drainage culverts. Includes setting culvert section to grade, attaching to existing culverts and backfilling with 3/4 inch crush gravel base course subgrade and top soil materials. Add construction storm drainage Swale per direction of City of Kalispell Engineer to the north and east side of the subdevelopment area. Add place top soil on access right-of-way in the boulevard between the curb and sidewalk and along the outside edge of the sidewalks. ITEM NO. DESCRIPTION QUANTITY COST AMOUNT 1. Concrete Light Pole Bases, in Place 4 EA $300.00 $ 1,200.00 2. Clearing and Excavation 4 HRS $100.00 $ 400.00 3. Extend 12" CMP Culvert 16 LF $ 35.00 $ 560.00 4. Construct Drainage Swale 8 HRS $100.00 $ 800.00 5. Place Top Soil 80 HRS $100.00 $ 8,000.00 TOTAL $10,960.00 RESOLUTION NO. ---43-02- A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITH THOMAS, DEAN &: HOSKINS, INC. ON THE WOODLAND COURT/TETON TERRACE PROJECTS. WHEREAS, the City on May 5, 1994 did enter into a contract with Thomas, Dean & Hoskins, Inc., for the construction of certain improvements connected with the Woodland Court/Teton Terace Projects, and WHEREAS, certain elements in the project required additional work, as well as time to complete; and said additional work and time requirements could not have been necessarily foreseeable when the original construction contract was entered into, and said changes are contained in Addendum "DR, attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advise and recommendation of Roger Sommerville, of Thomas, Dean and Hoskins, Inc., (the City's Consulting Engineers) it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and Thomas, Dean & Hoskins, Inc., dated January 6, 1997, as set out in Addendum "DR attached hereto are hereby approved, and 2. As soon as the alterations and modifications are agreed to in writing, signed by the City Manager, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS - DAY OF 1 1997. Douglas D. Rauthe, Mayor i:\wp\chngtdh.wpd ATTEST: Debbie Gifford, CMC Clerk of Council i:\wp\chngtdh.wpd The Agreement dated the 5th day of May, 1994, by and between the City of Kalispell and Thomas, Dean & Hoskins, Inc. is hereby amended as follows: Part IY - Payment for Services Paragraph F, add the following: The fee for construction management services for the Woodland Court Project shall not exceed fifty-nine thousand, two hundred and twenty-five and NO/ 100 dollars ($59,225.00). Fee shall be billed at two tines payroll plus out of pocket expenses at actual cost plus ten percent (10%). Mileage shall be charged at a rate of $0.35 per mile. The fee for construction management services for the Teton Terrace Project shall not exceed twenty-five thousand, three hundred and NO/100 dollars ($25,300.00). Fee shall be billed at two times payroll plus out of pocket expenses at actual cost plus ten percent (10%). Mileage shall be charged at a rate of $0.35 per mile. In Witness whereof the parties hereto have executed this amendment to the contract this the _ day of , 1996. THOMAS, DEAN & HOSKINS, INC. 4 J16Al Michael W. Fraser Vice President CITY OF KALISPELL, MONTANA Clarence Krepps City Manager Addendum "D" - 1 CITY OF KALISPELL Date: December 4, 1996 PROJECT: TETON TERRACE DEVELOPMENT Pay Estimate No. 5 JOB #: K94-46-5 Page 1 of 4 Amount Completed To Date $198,252.35 Less Retainage (0%) $0.00 Total $198,252.35 Total Retainag Contractor Estimate #1 $36,899.00 $3,689.90 $33,209.10 Estimate #2 $83,833.96 $8,383.40 $75,450.56 Estimate #3 $116,899.52 $11,689.95 $105,209.57 Estimate #4 $197,752.35 $19,778.95 $177,973.40 Estimate #5 $198,252.35 $0.00 $198,252.35 Less Previous Amount Due Contractor $177,973.40 Amount Due Contractor $20,278.95 Less 1 % Dept. of Revenue $202.79 TOTAL AMOUNT DUE $20,076.16 We hereby certify the work for which payment is hereon requested has been performed in accordance with the specifications. CONTRACTOR: SANDON CONSTRUCTION Greg Sandon We hereby certify the foregoing is a true and correct statement of the amount due the Contractor for construction, to date, of the above project, and payment for same is hereby recommended. ENGINEER: THOMAS, DEAN & HOSKINS, INC. By��`' �yP. IanJ. Bil . CITY OF KALISPELL APPROVED: Susan Moyer, Project Manager CITY OF KALISPELL PROJECT: TETON TERRACE DEVELOPMENT JOB #: K94-46-5 BID SCHEDULE I BID ITEM DESCRIPTION QUANTITY 1. Mobilization Lump Sum 2. Drainage Swale, In place 407 LF 3. Reshape Drainage Ditch 630 LF 4. Site Grading Lump Sum TOTAL BID, SCHEDULE I SCHEDULE If. WATER & SEWER IMPROVEMENTS WATER 1. Type II Pipe Bedding Material In -place 30 CY 2. Imported Backfill 520 CY 3. Water Mains, In -place 8" PVC DR 18 661 LF 6" PVC DR 18 70 LF 4. Gate Valves & Valve Box In -place, 8" 2 EA 6" 1 EA 5. Fire Hydrant with Auxiliary Gate Valve & Box, In -place IEA 6. Relocate Fire Hydrant I EA 7. Water Service, In -place Including pipe, corporation stop, curb stop and curb box 3/4" 23 EA I " 3 EA 8. Connection to Existing Water Main In -place 2 EA 9. Pressure and Leakage Test, Completed & Accepted - Minimum of 7 1/2% of Item 3 Lump Sum 10. Cleaning of Water Mains - Minimum of 7 1/2% of Item 3 Lump Sum 11. Disinfection & Bacteriological Testing of Water Mains Minimum 5 1/2% of Item 3 Lump Sum 12. Cast Iron Fittings, In -place 725 LBS SEWER 13. Type II Pipe Bedding Material, In -place 30 CY 14. Imported Backfill 160 CY Date: December 4, 1996 Pay Estimate No. 5 Page 2 of 4 QUANTITY UNIT VALUE OF WORK COMPLETED PRICE COMPLETED TO DATE $100.00 % $10,000.00 $101000.00 461 LF $6.48 $2,987.28 551 LF $1.60 $881.60 100 % $1,600.00 51,600.00 $15,468.88 0 CY $8.00 569 CY $9.20 695 LF $17.00 57 LF $17.00 3 EA $785.00 1 EA $630.00 1 EA $1,875.00 1 EA $570.00 23 EA $437.00 3 EA $500.00 2 EA $475.00 100 % $500.00 100 % $500.00 100 % $500.00 835 LBS $3.00 0 CY $8.00 144.3 CY $9.20 $0.00 55,234.80 $11,815.00 $969.00 52,355.00 $630.00 $1,875.00 5570.00 $I0,051.00 51,500.00 $950.00 $500.00 $500.00 5500.00 $2,505.00 $0.00 $1,327.56 CITY OF KALISPELL PROJECT: TETON TERRACE DEVELOPMENT JOB #: K94-46-5 ITEM DESCRIPTION 15. Excavation Type 2 w/ Type A Backfill Type 1 w/ Type B Backfill Type 2 w/ Type B Backfill 16. Sanitary Sewer, in Place 8" PVC SDR 35 17. Testing Complete & Accepted Minimum of 3 % of Item 15 18. Sanitary Sewer Manhole, in Place 19. Extra Depth of Manhole, in Place 20. Sanitary Sewer Service, in Place 21. Connection to Existing Sewer 22. Remove and Replace Existing Mahole Rings and Covers f� TOTAL BID, SCHEDULE II t SCHEDULEIH STREET PAVING IMPROVEMENTS 1. Subbase Course Material, in Place 2. Crust Gravel Material, in Place 3. Bituminous Prime Coat, in Place 4. Bituminous Tack Coat, in Place 5. Asphalt Pavement (4" thick, 2 lifts), in Place 6. Concrete Curb & Gutter, in Place 7. Concrete Sidewalk, in Place 8. Concrete Valley Gutter, in Place 9. Asphalt Pavement Replacement, in Place - TOTAL BID, SCHEDULE III Date: December 4, 1996 Pay Estimate No. 5 Page 3 of 4 BID QUANTITY UNIT VALUE OF WORK QUANTITY COMPLETED PRICE COMPLETED TO DATE 200 CY 183.5 CY $9.00 $1,651.50 240 CY 226.3 CY $8.75 $1,980.13 33 CY 27.1 CY $11.00 $298.10 583 LF 580.6 LF $18.00 $10,450.80 Lump Sum 100 % $500.00 $500.00 6 EA 6 EA $1,250.00 $7,500.00 2 VF 0 VF $75.00 $0.00 700 VF 691.33 LF $9.00 $6,221.97 2 EA 2 EA $200.00 $400.00 3 EA 3 EA $50.00 $150.00 $70,434.86 4370 SY 4370 SY $3.00 $13,110.00 4190 SY 4190 SY $3.15 $13,198.50 1540 GAL 0 GAL $3.00 $0.00 390 GAL 390 GAL $2.20 $858.00 3840 SY 3840 SY $6.95 $26,688.00 1500 LF 1484 LF $6.00 $8,904.00 7600 SF 8980.8 SF $3.25 $29,187.60 120 SY 120 SY $31.50 $3,780.00 10 SY 28.7 SY $30.00 $861.00 $96,587.10 CITY OF KALISPELL PROJECT: TETON TERRACE DEVELOPMENT JOB #: K94-46-5 ITEM DESCRIPTION SCHEDULEIV UTILITY IAIPROVEMENTS 1. Utility Trench 2. Electrical Conduit, in Place 2" 1 1/2" 3" 3. Transformer Vaults, in Place 4. Light Pole Bases, in Place 5. Asphalt Pavement Replacement 6. Electrical Service Trench TOTAL BID, SCHEDULE IV TOTAL PROJECT Date: December 4, 1996 Pay Estimate No. 5 Page 4 of 4 BID QUANTITY UNIT VALUE OF WORK QUANTITY COMPLETED PRICE COMPLETED TO DATE 99OLF 990 LF $2.00 $1,980.00 1165 LF 1151 LF $4.26 $4,903.26 260 LF 235 LF $3.70 $869.50 968 LF 905 LF $4.75 $4.298.75 5 EA 5 EA $200.00 $1,000.00 5 EA 5 EA $300.00 $1,500.00 17 SY 0 SY $30.00 $0.00 535 LF 605 LF $2.00 $1,210.00 $15,761.51 $198,252.35