09. Resolution 4307 - Teton Terrace Change OrderAgenda -January 13, 1997 AGENDA ITEM 9 - RESOLUTION 4307-TETON TERRACE CHANGE ORDER -TABLED TO 1/21/97 RESOLUTION NO. —A-QZ A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITH THOMAS, DEAN & HOSKINS, INC. ON THE WOODLAND COURT/TETON TERRACE PROJECTS. WHEREAS, the City on May 5, 1994 did enter into a contract with Thomas, Dean & Hoskins, Inc., for the construction of certain improvements connected with the Woodland Court/Teton Terace Projects, and WHEREAS, certain elements in the project required additional work, as well as time to complete; and said additional work and time requirements could not have been necessarily foreseeable when the original construction contract was entered into, and said changes are contained in Addendum "D", attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advise and recommendation of Roger Sommerville, of Thomas, Dean and Hoskins, Inc., (the City's Consulting Engineers) it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and Thomas, Dean & Hoskins, Inc., dated January 6, 1997, as set out in Addendum "D" attached hereto are hereby approved, and 2. As soon as the alterations and modifications are agreed to in writing, signed by the City Manager, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS DAY OF , 1997. Douglas D. Rauthe, Mayor is\wp\chngtdh.wpd ATTEST: Debbie Gifford, CMC Clerk of Council is\wp\chngtdh.wpd The Agreement dated the 5th day of May, 1994, by and between the City of Kalispell and Thomas, Dean & Hoskins, Inc. is hereby amended as follows: Part U - Payment for Services Paragraph F, add the following: The fee for construction management services for the Woodland Court Project shall not exceed fifty-nine thousand, two hundred and twenty-five and NO/ 100 dollars ($59,225.00). Fee shall be billed at two times payroll plus out of pocket expenses at actual cost plus ten percent (10%). Mileage shall be charged at a rate of $0.35 per mile. The fee for construction management services for the Teton Terrace Project shall not exceed twenty-five thousand, three hundred and NO/100 dollars ($25,300.00). Fee shall be billed at two times payroll plus out of pocket expenses at actual cost plus ten percent (10 %). Mileage shall be charged at a rate of $0.35 per mile. In Witness whereof the parties hereto have executed this amendment to the contract this the _ day of , 1996. THOMAS, DEAN & HOSKINS, INC. r Michael W. Fraser v Vice President CITY OF KALISPELL, MONTANA Clarence Krepps City Manager Addendum "D" - 1 CITY OF KALISPELL PROJECT: TETON TERRACE DEVELOPMENT JOB #: K94-46-5 Amount Completed To Date Less Retainage (0%) Total Estimate N1 Estimate A2 Estimate H3 Estimate H4 Estimate #5 Less Previous Amount Due Contractor Amount Due Contractor Less 1 % Dept. of Revenue TOTAL AMOUNT DUE Total Retainage Contractor $36,899.00 $3,689.90 $33,209.10 $83,833.96 $8,383.40 $75,450.56 $116,899.52 $11,689.95 $105,209.57 $197,752.35 $19,778.95 $177,973.40 $198,252.35 $0.00 $198,252.35 We hereby certify the work for which payment is hereon requested has been performed in accordance with the specifications. CONTRACTOR: SANDON CONSTRUCTION Greg Sandon We hereby certify the foregoing is a true and correct statement of the amount due the Contractor for construction, to date, of the above project, and payment for same is hereby recommended. ENGINEER: THOMAS, DEAN & HOSKINS, INC. By: Ian J. Bailey, P. . CITY OF KALISPELL APPROVED: Susan Moyer, Project Manager Date: December 4, 1996 Pay Estimate No. 5 Page I of 4 $198,252.35 $0.00 $198,252.35 $177,973.40 $20,278.95 $202.79 $20,076.16 CITY OF KALISPELL PROJECT: TETON TERRACE DEVELOPMENT JOB #: K94-46-5 BID SCHEDULE 1 BID ITEM DESCRIPTION QUANTITY 1. Mobilization Lump Sum 2. Drainage Swale, In place 407 LF 3. Reshape Drainage Ditch 630 LF 4. Site Grading Lump Sum TOTAL BID, SCHEDULE I SCHEDULE IL• WATER & SEWER IMPROVEMENTS WATER 1. Type 11 Pipe Bedding Material In -place 30 CY 2. Imported Backfill 520 CY 3. Water Mains, In -place 8" PVC DR 18 661 LF 6" PVC DR 18 70 LF 4. Gate Valves & Valve Box In -place, 8" 2 EA 6" 1 EA 5. Fire Hydrant with Auxiliary Gate Valve & Box, In -place IEA 6. Relocate Fire Hydrant 1 EA 7. Water Service, In -place Including pipe, corporation stop, curb stop and curb box 3/4" 23 EA I" 3 EA 8. Connection to Existing Water Main In -place 2 EA 9. Pressure and Leakage Test, Completed & Accepted - Minimum of 7 1/2% of Item 3 Lump Sum 10. Cleaning of Water Mains - Minimum of 7 112% of Item 3 Lump Sum 11. Disinfection & Bacteriological Testing of Water Mains Minimum 5 112% of Item 3 Lump Sum 12. Cast Iron Fittings, In -place 725 LBS SEWER 13. Type II Pipe Bedding Material, In -place 30 CY 14. Imported Backfill 160 CY Date: December 4, 1996 Pay Estimate No. 5 Page 2 of 4 QUANTITY UNIT VALUE OF WORK COMPLETED PRICE COMPLETED TO DATE $100.00 % $10,000.00 $10,000.00 461 LF $6.48 $2,987.28 551 LF $1.60 $881.60 100 % $1,600.00 $1,600.00 $15,468.88 0 CY $8.00 $0.00 569 CY $9.20 $5,234.80 695 LF $17.00 $11,815.00 57 LF $17.00 $969.00 3 EA $785.00 $2,355.00 1 EA $630.00 $630.00 1 EA $1,875.00 $1,875.00 1 EA $570.00 $570.00 23 EA $437.00 $10,051.00 3 EA $500.00 $1,500.00 2 EA $475.00 $950.00 100 % $500.00 $500.00 100 % $500.00 $500.00 100 % $500.00 $500.00 835 LBS $3.00 $2,505.00 0 CY $8.00 $0.00 144.3CY $9.20 $1,327.56 CITY OF KALISPELL Date: December 4, 1996 PROJECT: TETON TERRACE DEVELOPMENT Pay Estimate No. 5 JOB Jl: K94-46-5 Page 3 of 4 BID QUANTITY UNIT VALUE OF WORK ITEM DESCRIPTION QUANTITY COMPLETED PRICE COMPLETED TO DATE 15. Excavation Type 2 w/ Type A Backfill 200 CY 183.5 CY $9.00 $1,651.50 Type 1 w/ Type B Backfill 240 CY 226.3 CY $8.75 $1,980.13 Type 2 w/ Type B Backfill 33 CY 27.1 CY $11.00 $298.10 16, Sanitary Sewer, in Place 8" PVC SDR 35 583 LF 580.6 LF $18.00 $10,450.80 17. Testing Complete & Accepted Minimum of 3% of Item 15 Lump Sum 100 % $500,00 $500.00 18. Sanitary Sewer Manhole, in Place 6 EA 6 EA $1,250.00 $7,500.00 19. Extra Depth of Manhole, in Place 2 VF 0 VF $75.00 $0.00 20. Sanitary Sewer Service, in Place 700 VF 691.33 LF $9.00 $6,221.97 21. Connection to Existing Sewer 2 EA 2 EA $200.00 $400.00 22. Remove and Replace Existing Mahole Rings and Covers 3 EA 3 EA $50.00 $150.00 TOTAL BID, SCHEDULE 11 $70,434.86 SCHEDULE III STREET PAVING IMPROVEMENTS 1. Subbase Course Material, in Place 4370 SY 4370 SY $3.00 $13,110,00 2. Crust Gravel Material, in Place 4190 SY 4190 SY $3.15 $13,198.50 3. Bituminous Prime Coat, in Place 1540 GAL 0 GAL $3.00 $0.00 4. Bituminous Tack Coat, in Place 390 GAL 390 GAL $2.20 $858.00 5. Asphalt Pavement (4" thick, 2 lifts), in Place 3840 SY 3940 SY $6.95 $26,688.00 6. Concrete Curb & Gutter, in Place 1500 LF 1484 LF $6.00 $8,904.00 7. Concrete Sidewalk, in Place 7600 SF 8980.8 SF $3.25 $29,187.60 8. Concrete Valley Gutter, in Place 120 SY 120 SY $31.50 $3,780.00 9. Asphalt Pavement Replacement, in Place 10 SY 28.7 SY $30.00 $861.00 TOTAL BID, SCHEDULE I1I $96,587.10 CITY OF KALISPELL PROJECT: TETON TERRACE DEVELOPMENT JOB #: K94-46-5 ITEM DESCRIPTION SCHEDULE IV UTILITY IMPROVEMENTS 1. Utility Trench 2. Electrical Conduit, in Place 2" 1 1/2" 3" 3. Transformer Vaults, in Place 4. Light Pole Bases, in Place 5. Asphalt Pavement Replacement 6. Electrical Service Trench TOTAL BID, SCHEDULE IV TOTAL PROJECT Date: December 4, 1996 Pay Estimate No. 5 Page 4 of 4 BID QUANTITY UNIT VALUE OF WORK QUANTITY COMPLETED PRICE COMPLETED TO DATE 99OLF 990 LF $2.00 $1.980.00 1165 LF 1151 LF $4.26 $4,903.26 260 LF 235 LF $3.70 $869.50 968 LF 905 LF $4.75 $4,298.75 5 EA 5 EA $200.00 $1,000.00 5 EA 5 EA $300.00 $1,500.00 17 SY 0 SY $30.00 $0.00 535 LF 605 LF $2.00 $1,210.00 2 $15,761.51 $198,252.35