06. Resolution 4301 - North Meridian Road Change Orderi 11 iiiiFi'! i Ii11111 BACKGROUND/CONSIDERATION: This request for Change Order #1 in the amount of $6,770 for SMD Engineering is due to the unanticipated extent of major underground utilities located in the vicinity of North Meridian Road. This original contract was for $10,771.56 to complete phase 1 of the utility location. However, the actual work performed by the subcontractor of $17,541.90 records research and locating based upon a total of 69 pages of utility drawings was more than anticipated and more time was needed to complete the utility location and relationships. RECOMMENDATION: Although I prefer projects be completed within contracted amounts, I have, after 25 years of experience, learned to anticipate any project that deals with underground work will almost always result in "increase" change orders. Because of the scope of this project, the need to accurately locate all underground structures, and the fact that we would be required to pay for 'the locations whenever the. project is undertaken, I recommend Change Order #1 be approved. ACTION REQUIRED: A MOTION to approve Change Order #1 in the amount of $6,770 will authorize payment for the actual work performed. RESOLUTION NO. --43QJ A RESOLUTION TO ALTER AND AMEND THE CONTRACT WITH ROBERT PECCIA AND ASSOCIATES ON NORTH MERIDIAN ROAD, STPU 6701(5). WHEREAS, the City on October 10, 1995 did enter into a contract with Robert Peccia and Associates, Helena, MT for engineering and design on North Meridian Road, STPU 6701(5), and WHEREAS, SMD, Consulting Engineers, under a subcontract to Peccia and Associates exceeded estimates for location of underground facilities; and said exceeding of estimates could not have been necessarily foreseeable when the original contract on this phase of the engineering was entered into, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, upon the advise and recommendation of Peccia and Associates, it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to t ' he provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the contract between the City of Kalispell and Peccia and Associates, dated October 15, 1995, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the engineer, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS DAY OF , 1996. Douglas D. Rauthe, Mayor ATTEST: Debbie Gifford, CMC Clerk of Council Incorporated 1892 Telephone (406) 758-7700 FAX (406) 758-7758 Post Office Box 1997 Kalispell, Montana Zip 59903-1997 October 16. 1996 Robert Peccia and associates 825 CU�ter avenue P.O. Box 5653 Helena. tilT 59604 Subject: STPU 6701(�) North Meridian Road- Kalispell Control \o.:'`)_U In accordance with article IV. Section 6 of the original agreement between the Cite of Kalispell and Robert Peccia and associates dated October 10, 1995. this letter and attached request for {' additional compensation dated august 1996 «i11 serve as Supplement agreemento. 1. This supplement is to provide additional compensation for conducting subsurface utility work and preparing plans showing existing utilities for the subject project. This supplement provides for an additional actual cost of S6770 with no increase in the fixed fee. This will increase the maximum contract ceiling from S370.149 to S376.919, Bob Babb. P.E. Public %Yorks Director/City Engineer Approved onsultant Date Douglas Rauthe Mayor Clarence W. Krepps City Manager City Council Members: Gary W. Nystul Ward I Cliff Collins Ward I Norbert F. Donahue Ward II Dale Haarr Ward II Jim Atkinson Ward III Lauren Granmo Ward III Pamela B. Kennedy Ward IV M. Duane Larson Ward IV Civil. Transportation & Environmental Engineers Mr. Bob Babb, P.E. Public Works ITirector/City En-ineer City of Kalispell 312 First Avenue East P.O. Box 1997 Kalispell, MT 59903-1997 Subject: STPU 6701(5) North Meridian Road - Kalispell Control No. 2950 Dear Bob: October 17, 1996 Included with this letter as requested by John Wilson is a signed Supplement Agreement No, l for additional compensation to SMD Engineering, Montana Department of Transportation (MDT) was consulted about this matter and they informed us to proceed with the process. Please sign the agreement and send two copies to us. One copy will be forwarded to MDT and the other will be kept in our files. You may keep the original signed copy in your files. Once we receive the funds, we will write another supplement between us and SMD Engineering -ranting them additional compensation. Signed copies the agreement and any correspondence will be forwarded to you and MDT. If you have any questions regarding this matter, please let me know. Thank you. Sincerely, . ROBERT PECCIA & ASSOCIATES Hisham K. Abdelaziz, P.E. Project Engineer HKA/hka Enclosure F:\hi ghways\meridiantcontract\ 1017bb.itr P.O. Box 5653, 825 Custer Helena, Montana 59604 (406) 447-5000 FAX (406) 447.5036 RPA411-N.com ROBERT PECCIA & ASSOCIATES Civil, Transportation & Environmental Engineers August 8, 1996 Mr. Bob Babb, P.E. Director of Public Works/City Engineer City of Kalispell P.O. Box 1997 Kalispell, MT 59903-1997 Subject: STPU 6701(05) North Meridian Road - Kalispell F&-._ ►• Enclosed with this letter is a request for additional compensation submitted by our subcontractor SMD Consulting Engineers, pertaining to phase 1 of the utility location for the Meridian Road project. The original contract between us and SMD shows an amount of $10,771.56 to complete phase 1 of the utility location. This amount was based on their best judgment of the existing field conditions. The actual work performed by the subcontractor was in the amount of $17,54190, creating an overrun amount of $6,770.34. We informed SMD that we do not have additional funds in our contract to absorb this type of extra expense. For this reason we respectfully ask that the City review SMD's request for the additional compensation and issue a supplement to our contract for $6,770.34 to cover their cost overrun. Please contact me or Gordon Larson if you have any questions or need additional information. Sincerely, ROBERT PECCIA & ASSOCIATES AbdelAziz, P.E. Project Engineer HKA/hka Enclosure cc: Sam Naseem. -MDT Consultant Design f.\highways\meridian%cotrespot0808bb i.itr P.O. Box 3653, 825 Custer Helena, Montana 59604 (406) 447-5000 FAX (406) 447.5036 RPA-HLN.com i t th ,\venul f cite 23 i. Box 5255 / Helena, NIT 59604 Telephone & FAX (406) 442-5875 Mr. Gordon Larson, P.E. Hobert Peccia & Associates P.O. Box 5653 825 Custer Avenue Helena, Montana 59604-5653 Dear Gordon: 7 AUG 2 - 1996 Senechal and Snow Consulting Engineers I am writing you in regard to the Meridan St. Kalispell S.U.E. project STPU 5701(5). As you are aware SMD's proposed estimate for phase 1 of this project was $10.771.56 we had actual time and materials totaling $17,541.90. The project engineer assigned to this project failed to read your contract requiring SMD to have written permission to exceed the budget amount of $10.771.56, He treated this project with the same guidelines that we work under for MDOT. We furnish a complete daily diary accounting for every hour charged to this project. When SMD estimates SUE projects we have very incomplete data on the underground facilities in the area therefore we make it quite clear that our proposal is just an estimate and not a firm proposal. Peccia furnished us with a set of highway plans with little to no underground facilities, with these plans Tom Pankratz prepared an estimate. We then requested from your firm additional drawings for water, sewer storm and drainage for the project you sent us 24 sheets of drawings. SMD obtained 21 drawings from the city of Kalispell on their water system, 9 drawings from Montana Power Company on their gas system, 13 drawings from PTI on communications and 2 drawings from MDOT on signal light circuitry. With the amount of underground facilities in the area SMD's estimate was under quoted immediately. Records research and locating would required much more time than estimated. You should have noticed that I reduced the rate for records research and locating engineer on the submitted invoice. I also furnished complete daily diaries for the project. SMD would like to be compensated for the additional work required on the unknown utilities. The SUE contracts with the state function in the same manner. SMD gives an estimate of services, completes the work required, furnishes a complete diary with accurate maps, and invoices actual amounts. If you have any questions please feel free to contact me at 442-5875. St ey A. Senecha P.E / SMD Eng &ring, Inc. J-t 1rrJ e 11th A%e ... Suite"j 1 0. Box 5255 / Fic ena, MT 59604 Telephone & FAX (406) 442-5875 Senechal and Snow March 11, 1996 Consulting Robert Peccia & Associates Engineers ATTN.' Hisham K. AbdelAziz P.O. Box 5653 825 Custer A•;enue Helena, PTT 59604-5653 Re: North Xeridian, Kalispell Invoice No. 95-089-06A STPU 6701(5) Dear Hisham: Please find summarized herein our Invoice No. 95-089-06A for the referenced project STPU 6701(5). This invoice is a progress bill for the Subsurface Utility Engineering performed on the North Meridiin project. This invoice reflects labor and expenses from December 3, 1995 through March 11, 1996. T North Meridian Project Engineer 1.00 hrs $58.00/hr $58.00 Records Research 41.00 hrs $37.12/hr* $1,521.92 Locating Engineer 146.00 hrs $37.12/hr* $5,419.52 Survey Crew 61.50 hrs $74.24/hr $4,565.76 Drafter 70.50 hrs $37.12/hr $2,616.96 Mileage 2413.00 mi $.31/mi $748.03 Meals (2 People) 18.00 dys $50.00/ea $900.00 Lodging (2 People) 11.00 dys $46.80/dy $514.80 Lodging (1 Person) 3.00 dys $33.97/dy $101.91 Metal Detector 6.00 dys $10.00/dy $60.00 Utility Locator 11.00 dys $25.00/dy $275.00 Total Staticn 4.00 dvs $100.00/dy $400.00 Copies Courthouse 2.00 ea $7.50/ea $15.00 Plots 30.00 ea $11.50/ea 5345.00 TOTAL AMOUNT DUE $17,541.90 * Our normal rate is $46.40 for Locating Engineer, due to the winter conditions and excess hours we have reduced our rate to $37.12 for this project. Thank you for using SMD Engineering and we hope to be of service to you and your company in the future. very truly yours, *SMMDEnVginring', Inc ROBERT rECCC.k • it ASSOCIATES 6101, Transportation a 5nvironmentei Lngirseers October 111997 Mr. Jim Han=_ P.E. Public W'ocks Director / City .Engineer City. of K.atispell P.O. Box'1997 Kalispell, MT 59903-1997 Subject: STPU 6701 (5) North Wridiah Road- C.N. 2950. . Dew aim: lax accordance with ArticicSection 6 - Qhauges of Work, of the original agreement between the City. of Kalispell i�d Robert P.ecciaiad Msociates.(RP'A) dated October 10, I995, this.lette'r Will serve as Supplement AgreemcntNo.•4. This supplement is to discontinue the Consultant from performing apy ser;Jces outlined under .Ahkle l., Soetion I2 - Right -of -Way Acquisition a hd allotiv •the Nlont3nzt Dcpartzncnt of Transportation- (MDT) to perfoxvi such. services. The cost esiunate.prepaued by RPA to complete the Deed Exhibits, RigXit-of Way Appraisal, and Negotiations and'•Acguisition' for the Nkrid}an Road project is $59,061.42 actual cost and $9794.1 fixed fee.. The task total is $60,041. 03. For hourly and• cost breakdown please refer to items 61, 62, and 63 of the original cast proposal Pied for this project. This 'suppl' went will decrease the fixed fee. -from V1,691 to' $20,711 and the maximum caiding from ' $40i,219 to $34.8,178. Please call if you have any questiops. _ Sincerely, ROBER T' PECCI,A AND ASSOaATES Hisham K,.A,bdel ziz, P.B. Project Engineer, .. `� fthighwSty'zxzendxank� ola rzst4.wpi 00. Box 5553. 82s C�fotr }'lelena. %lont7ns 59W4 ' (406) 447-5pd4. fAX (446) 447,50M ' xtxxl,n.corn i l I FAX TRANSMfrTAL Date: r d&L I , 1227 Number of Paae(s); MESSAGE TO: Name: Z Finn/Agency: -� Address: FAX Number: 1r J1fSSAGa -. Tt• V,l 825 Custer Avenue • P.O. Box 56.53 • Helena hiT ♦ 59604 9 Telephone_ (406) 447-5000 w Fax: (406) 447-5036