5. Resolution 4292 - Change Order - Teton TerraceBACKGROUND/CONSIDERATION: The Teton Terrace project includes infrastructure improvements. We are currently in this phase of the project.. As is typical, when underground work is being done, we have experienced a need for our first change order. I have enclosed a memo (Exhibit E) concerning this change order from the Consulting Engineer. RECOMMENDATION: The Consulting Engineer and the City Staff have reviewed the need for these changes. Due to the desire to consolidate the electrical work into one common trench that will create less trenching and less disruption of the finish grade as well as give us the control of water service by placement of a new gate valve, all of the reviewers recommend approval of this change order. I concur with this recommendation. The increase in costs is based upon the unit bid prices. The original price of $191,525.76 will increase by $6,298 to a new contract price of $197,823.76. ACTION REQUIRED: RESOLUTION 4292 needs to be approved by the Council to authorize the "increase" change order #1 in the amount of $6,298.00. RESOLUTION NO. 4292 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH SANDON CONSTRUCTION COMPANY ON THE TETON TERRACE PROJECT. WHEREAS, the City on July 8, 1996 did enter into a contract with Sandon Construction Company of 1600 Montana 35 East, Kalispell, Montana for construction of the Teton Terrace project, and WHEREAS, upon the advice and recommendation of Thomas, Dean & Hoskins, Inc., who is the City's consultant on said project, certain changes and alterations of design and specifications have been found necessary and advisable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the construction of the Teton Terrace project, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations. NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Sandon Construction Company, dated August 19, 1996, as set out in Exhibit "A" attached hereto are hereby approved, and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS DAY OF , 1996. Douglas D. Rauthe, Mayor ATTEST: Debbie Gifford, CMC Clerk of Council QUIZU196 16: ZJ 6TA110N . ENGINEERING CONSULTANTS 690 North Morsdian, Suite 101 # Kalisooll, Mo itana 59901 • (405} 752.52d6 • FAX (406) 7E2.5230 August 20, 1996 TO: Susan Moyer FROM: Ian bailey, P.E. RE: Teton Terrace Development Change Order No. 1 Change Order No. 1 includes labor and materials for two separate items: 1. Electrical utility conduit and trenching from the transformers to the meter base locations at each residence. 2. An additional 6" gate valve to be used with the fire hydrant relocation on Iris Court. Justification is as follows: 1. The installation of electrical service trench and conduit has been moved from the actual home construction portion of the project to the infrastructure portion of the project to avoid requiring each home builder to dig electrical service trench through the graded and seeded common area. The change will also consolidate the electrical work under a single contractor versus up to 11 separate contractors. An ultimate project savings should be realized since the infrastructure contractor can install many of the service lines in a common trench with other electrical service lines and the backbone electric lines. The change will result in less trenching and less disruption of finish graded areas. 2. The 6" gate valve is required at the fire hydrant relocation on Iris Court to avoid disruption of service and disinfection procedures on the existing main serving Hawthorn West residents. There is no way to shut down the existing maim close to the new construction. The entire existing main will require a 24 hour disinfection process if the existing valve is removed. The expense of the new valve is outweighed by the cost of temporary service, disinfection and aggravation to water users in Hawthorn West. The contractors prices for the above items are reasonable and consistent with the original bid prices. We recommend approval of this Change Order. Post -It" Fax Note 7671 To _ From coiDepLe Phone # Phone r Fax7,54 THOMAS, DEAN & HOSKINS, INC. 've ' Ian J. B y, P.E. KALISPELL, SPOKANE AND LEWISTON ��« CITY OF ISPELL MEMO AUGUST 20,1996 e— N-1 TO: IAN BAILEY f,+, 7,5�2 52- 3,---) FROM: Carol Grigg FOR SUSAN MOYER RE: SANDON'S CHANGE ORDER NO. I — --(e 40 tJ PER YOUR FAX ON 8/19/96 REGARDING THE CHANGE ORDER FOR ELEC. SERVICE CONDUIT AND TRENCH PLUS AN ADDITIONAL GATE VALVE. I TALKED WITH SUSAN MOYER 8/20/96 REGARDING THIS C.O., AND THERE SHOULDN'T BE A PROBLEM GETTING THE ly COUNCIL'S APPROVAL, BUT SUSAN HAS REQUESTED THAT YOU PREPARE A MEMO AS TO WHY AND HOW THE CHANGE ORDER CAME ABOUT, I.E., PACIFIC POWER'S REQUEST THAT THE ELEC. METERS WILL BE LOCATED FROM THE FRONT OF THE HOUSES TO ALONGSIDE, ETC., AND WHY THE ADD FOR 6" AUXILIARY GATE VALVE AND VALVE BOX, IN -PLACE. PLEASE PREPARE THE MEMO ASAP AS THE NEW CITY MANAGER HAS REQUESTED THIS INFORMATION BEFORE '6 THE CLERK OF COUNCIL CAN PUT 'IT ON THE WORKSHOP 4I I, - AGENDA. PLEASE FAX TO ME AT 758-7739. COUNCIL'S WORKSHOP MEETING 8/26/96, BUT WON'T BE APPROVED UNTIL COUNCIL MEETING 9/9/96 (REG. MONDAY IS A HOLIDAY, SO MEETING MOVED UP A WEEK). WHAT DO YOU WANT TO DO REGARDING SANDON WANTING TO DO THE WORK NEXT WEEK?? THANKS.. ASAP THANKSC� / HLY-7- I Z�_ A 7 ZXD 1Q- 1J r-MLA I I rW-q'U--D L.--M'4 0. M)_N L NM I U (DU r (.311 11. k5l ---77 -A THOMAS, DEAN & HOSKINS INC. ENGINEERING CONSULTANTS 690 North Merldlan, Suite 101 Kaltspull. M" thu id 59901 (400) 702-5240 - rAX FACS1W.F. COVER SHRET DATE: gj��f a �P.01 1 " 6t)llx� SUS_.0A1 lWe t/gve F 7`1 ThoMas, Dew HoSkIns, Inc. fill 690 North Meridian, Wite 101 FAx Nc�__X5-F- 7 Yarlspell. MT &%01 FAX No: (4M) #Z 0 W"W551 61_'T=A*"72 v 2/-w /I (' c,P e o I. le 3 OFFICES IN GREAT FALLS, BOZEMAN, KALISPELL AYD SPOKANE • DEAN & HOSXJNS - CONTRACTOR, SANMN. CONSTRUMION COMPANY, INC. The following changes are hereby made to the CONTRACT DOCUMENTS: Add: 6" auxiliary Gate Valve & Valve Box, In -pure SCHEDULE IV: UTILITY_.IW.RQVBIviBNT$ Add: 535 L.F. Electrical Service Trench, In -place {s Add; 968 L.F. 3" Electrical Conduit, In -place JustificadowIf 2e g +. L Existing 6" gate valve to be left in place to maintain bacteriological integrity of adjacent existing main. Eloctric service work is added to facilitatc subsequent home constmcdon bids and avoid excavation of finish graded common areas. i : t - o jumd-I fig"If g Electrical Servioe Treueh, In Place 535 LF @ $2.001U $ 1,070.00 3" Electrical Conduit, In Place 968 LF 0 $4.751LF 4,598.00 6" Auxiliary Gate Valve & Valve Box, In Place 1 EA @ $630iEA 36 4.00 TOTAL $ 6,298.00 $ISl_525,7b S Ph t. ,�, , ., � - t � i' 1;�I* �. t ,.,yi r ',•_„'�.': fit The new CONTRACT PRICE imIuding this CHANGE ORDER will be $197,823.76. I — a - : --- a.,+ .a, -r . — I 111v Ina isv_ra I Q n .1--WN L N.D 1 u ( € ('(�� H. 03 CHANGE of CONTRACT The CONTRACT TWE will ' se by 0 days. The date for completion of all work will remain October 17, 1996. TnTAI P 917