Loading...
16. Kalispell Golf Association - Request for Capital ImprovementsJUL �J U 1996 P.O. Box 1116 Kalispell, Montana SMI 7-29-96 Phone (406) 7W-4545 City of Kalispell Mr. Al Thelen - Interim City Manager P.O. Box 1997 Kalispell, MT 59903 Dear Al, As you requested, the following is a summary of capital improvements to Buffalo Hill Golf Course proposed by the Kalispell Golf Association. I appreciate your cooperation and effort in presenting this to the City Council for approval. My understanding is that formal action will occur at the 8-5-96 council meeting. Project 1: "Dewatering System" Design and construct a ground/surface de -watering system for all areas of the Buffalo Hill Golf Course impacted by high flows of the Stillwater River. Specifically, holes number 5, 6, 7, 13, 14, 15 and 16 on the Championship 18 golf course. This de -watering system involves the installation of 6-10 de -watering wells which takes the excess surface and ground water back out to the Stillwater River. Six test wells were drilled in 1991 by Spratt and Associates Hydrology Consulting of Kalispell which determined the need for a pumping system that could pump approximately 6,000,000 gallons of water per day. A copy of the hydrology report is available at the KGA main office if further information is requested. The estimated cost of this project is $125,000 which includes design, engineering and construction of the de -watering system. A September 1996 construction date is planned. Project 2: "Greens and Tees Construction" Buffalo Hill Golf Course is in immediate need of general greens and tees rebuilding. This plan calls for rebuilding all 27 greens and approximately 20 of the 27 tee boxes. The estimated cost of this program is $875,000. This project is scheduled to begin as soon as bank financing can be secured. Final plans and design work has not been approved, however, the estimate of $875,000 is considered reasonable for the type of work proposed. If you need additional information Al, please feel free to give me a call. Thank you once again for your efforts in getting this item on tonight's work session agenda. Sincerely, 7 Stephen C. Dunfee Operations Manager