Loading...
5. Resolution 4265 - Change Order - Woodland Park DREAM TrailRESOLUTION NO. 4265 A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF CONTRACT WITH PACK & COMPANY ON THE WOODLAND PARK DREAM TRAIL PROJECT. WHEREAS, the City did enter into a contract with Pack & Company of 2335 Highway 93 North, Kalispell, Montana for construction of the Woodland Park DREAM Trail project, and WHEREAS, upon the advice and recommendation of Jeff Larson, who is the City's consultant on said project, certain changes and alterations of design and specifications have been found necessary and advisable and in the best interests of the City; and said changes and alterations could not have been necessarily foreseeable when the original design and specifications were prepared on this phase of the construction of the Woodland Park DREAM Trail, and said changes are contained in Exhibit "A", attached hereto and are by this reference made a part hereof; and WHEREAS, it appears in the best interests of the City to approve said changes and alterations, NOW THEREFORE, pursuant to the provisions of Section 7-5- 4308(1) MCA be it hereby resolved: 1. The alterations and modifications of the specifications and plans of the contract between the City of Kalispell and Pack & Company, dated May 9, 1996, as set out in Exhibit "All, attached hereto, are hereby approved, and 2. As soon as the price to be paid for said alterations and modifications are agreed to in writing, signed by the contractor, as hereby approved by the Council, this approval thereof shall be in effect. PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF KALISPELL THIS DAY OF I , 1996. Douglas D. Rauthe, Mayor ATTEST: Debbie Gifford, CMC Clerk of Council A STATE OF MONTANA CHANGE ORM NO. 1 DEPARTMEWT OF TRANSPORTATION PROJECT NO: sTP HIGHWAYS DIVISION DESIGNATION. Woodland Park-KAL TO: Pack and Company DATE: CtANTRACrOR You am bamby duetted to pettmm the work 001mitltin$ dum9ft in the VFCOVW OmMa Tire Divizac —n --* hw tishts_ inr my wewk "CO nmv"V4 fAr in th.- mmtrM4 *rA t%or wAAA wars to #" anwwwK,r) d.. -o Change the original project to include 405 linear feet of engineering fabric typical section. In addition the work will include installing 405 linear feet of french drain trench with relief pipes every 25 feet on center. The work will also include topsoiling and sodding to prepare the typical section as shown on the typical section included. Discussed with Ed Hedlund The p$ymemt shall be full compensation for R=shin8 all labor, tools, equon m4 matuiais and =deutals nesessary to oompim the Wo:iL ESTIMATE AND COST FEDERAL FUND: S LOCAL AOENCY3 Ot�ttN'iY: TYPE CODE r'rEM NO. SPLIT QUANTrrY UNrr DESCRtPMN UNIT Ptt= S Atr OEWr CO-1-1 01 90 C.Y. Pit Run sub -base 20.84 1,875.60 CO-1-2 01 460 Sq.Yd Eng. Fabric 1.16 533 CO-1-3 01 405 LEFT French Drain 6.14 2,486.76 CO-1-4 01. 16 Each Relief Pipes 110.92 1,774.72 CO-1-5 01 1 LumSum Additional Topsoil/Sod 1,885 1,885.00 Tum 6 dqx Total Cosa $_ 8, 5 5 5.6 2 I ha-eby understmd and agree to the terms Prgmnd cod eonditiom set forth m this mstum=L Project By / / Approved by Owner Titke Approved District Conmuction En&m APPr'ed CTEP Fh&eedng Coor&ww