5. Resolution 4265 - Change Order - Woodland Park DREAM TrailRESOLUTION NO. 4265
A RESOLUTION TO ALTER AND AMEND THE PLANS AND SPECIFICATIONS OF
CONTRACT WITH PACK & COMPANY ON THE WOODLAND PARK DREAM TRAIL
PROJECT.
WHEREAS, the City did enter into a contract with Pack &
Company of 2335 Highway 93 North, Kalispell, Montana for
construction of the Woodland Park DREAM Trail project, and
WHEREAS, upon the advice and recommendation of Jeff Larson,
who is the City's consultant on said project, certain changes and
alterations of design and specifications have been found necessary
and advisable and in the best interests of the City; and said
changes and alterations could not have been necessarily foreseeable
when the original design and specifications were prepared on this
phase of the construction of the Woodland Park DREAM Trail, and
said changes are contained in Exhibit "A", attached hereto and are
by this reference made a part hereof; and
WHEREAS, it appears in the best interests of the City to
approve said changes and alterations,
NOW THEREFORE, pursuant to the provisions of Section 7-5-
4308(1) MCA be it hereby resolved:
1. The alterations and modifications of the specifications
and plans of the contract between the City of Kalispell and Pack &
Company, dated May 9, 1996, as set out in Exhibit "All, attached
hereto, are hereby approved, and
2. As soon as the price to be paid for said alterations and
modifications are agreed to in writing, signed by the contractor,
as hereby approved by the Council, this approval thereof shall be
in effect.
PASSED AND APPROVED BY THE CITY COUNCIL AND MAYOR OF THE CITY OF
KALISPELL THIS DAY OF I , 1996.
Douglas D. Rauthe, Mayor
ATTEST:
Debbie Gifford, CMC
Clerk of Council
A
STATE OF MONTANA CHANGE ORM NO. 1
DEPARTMEWT OF TRANSPORTATION PROJECT NO: sTP
HIGHWAYS DIVISION DESIGNATION. Woodland Park-KAL
TO: Pack and Company DATE:
CtANTRACrOR
You am bamby duetted to pettmm the work 001mitltin$ dum9ft in the VFCOVW OmMa Tire Divizac
—n --* hw tishts_ inr my wewk "CO nmv"V4 fAr in th.- mmtrM4 *rA t%or wAAA wars to #" anwwwK,r) d.. -o
Change the original project
to include 405 linear feet of
engineering fabric typical
section. In addition the work
will include installing 405
linear feet of french drain
trench with relief pipes every
25 feet on center. The work
will also include topsoiling
and sodding to prepare the
typical section as shown on
the typical section included.
Discussed with Ed Hedlund
The p$ymemt shall be full compensation for R=shin8
all labor, tools, equon m4 matuiais and =deutals nesessary to
oompim the Wo:iL
ESTIMATE AND COST
FEDERAL FUND: S
LOCAL AOENCY3
Ot�ttN'iY:
TYPE CODE
r'rEM NO. SPLIT QUANTrrY UNrr
DESCRtPMN UNIT Ptt= S Atr OEWr
CO-1-1 01 90 C.Y.
Pit Run sub -base 20.84 1,875.60
CO-1-2 01 460 Sq.Yd
Eng. Fabric 1.16 533
CO-1-3 01 405 LEFT
French Drain 6.14 2,486.76
CO-1-4 01. 16 Each
Relief Pipes 110.92 1,774.72
CO-1-5 01 1 LumSum Additional Topsoil/Sod 1,885 1,885.00
Tum 6 dqx
Total Cosa $_ 8, 5 5 5.6 2
I ha-eby understmd and agree to the terms
Prgmnd
cod eonditiom set forth m this mstum=L
Project
By / /
Approved by
Owner
Titke
Approved
District Conmuction En&m
APPr'ed
CTEP Fh&eedng Coor&ww