Loading...
5. Change Order - Woodland Park DREAM Traila � i ��Ivll 0i0l Incorporated 1892 Telephone (406) 758-7700 FAX (406) 758-7758 Post Office Box 1997 Kalispell, Montana Zip 59903-1997 TO: FROM: RE: DATE: Al, Al Thelen, Interim City Manager Michael Baker, C.L.PAeea Director, Parks & Reion Change Order - Woodlan-d--P—ark DREAM Trail May 10, 1996 Please consider this a request for change order as a result of the Pre -construction meeting recently held at Woodland Park. In attendance were the contractor, NuPac, consultant, Jeff Larson, and myself. Due to the excessive amount of moisture received this year, I feel it is necessary to submit a change order to protect our construction investment by addressing the springs creating saturation problems on the Woodland Pond. The work for the change requirements of all plans in original documents. The bidder submitted a total of $8,555.62 order: order is subject to the the specification on the having examined the plans for the following change Change the original project to include 405 linear feet of engineering fabric typical section. In addition the work will include installing 405 linear feet of french drain trench with relief pipes every 25 feet on center. The work will also include topsoiling and sodding to prepare the typical section as shown on the typical section included. I met with the Montana Department of Transportation C.T.E.P. representative to confirm the work order and prices. He has assured me this price either meets or are below standard bid amounts for similar work. The City will be responsible for $1,145.45. The CETP matching fund will be $7,409.17. The project total still falls well within the engineer's estimates of $55,484.00. Thank you for your consideration on this matter. MB/dlw Douglas Rauthe Mayor Al Thelen Interim City Manager City council Members: Gary W. Nystul Ward i Cliff Collins Ward I Norbert F. Donahue Ward ii Dale Haarr Ward 11 Jim Atkinson Ward III Lauren Granmo Ward III Pamela B. Kennedy Ward IV M. Duane Larson Ward IV ' 05/09/96 10:46 MDT M1SSOU-A 4 406 752 5767 ,NO.024 I STATE OF MONTANA CHAN(M ORDER NO: 1 JE EP PE HICHWAYS DIVISION NA .40odland Park TO: Pack • Company CONTRACMit !.. s mb dir e. e. • . .; a :�. s ♦ �..0 s, o s•f 1 u • ... .. • -, ad ds:.: �e d. ! r.,� . rThe1 "a ► .x- re rill }._f. i:. ::. for :tiv d { F•: d 1►:.. d ! • .i. lid.. .d . 1t is I':' _ dtl..i L:: rd i.t.:.♦ Change the original project to include 405 linear feet of engineering fabric typical section. In addition the work will include installing 405 linear feet of french drain trench with relief pipes every 25 feet on center. The work will also include topsoiling and sodding to prepare the typical section as shown on the typical section included. Discussed with Ed Hedlund The psynexxt shall be frill compensation for Am isb N all labor, tools, equipment, materials ad meidentsls ueseuaty to Ise the Work. ESTIMATE AND COST FEDERAL FUtD: S LOCAL AOEWY:S CLiWN. TYPE CODE UEM NO. SPM QUANTTI'Y UNrr DsscKwnoN UNrr PRICE S ARdOLWr CO-1-1 01 90 C.Y. Pit Run sub -base 20.84 1,875.60 CO-1-2 O1 460 Sq.Yd Eng. Fabric 1.16 5.33.6iT CO-1-3 01 405 LEFT French Drain 6.14 2,486.70 CO:_1-4-4 01. _ 16 Each Relief Pipes 110.92 1,774.72 CO-1-5 01 1 LumSum Additional Topsoil/Sod 1,885 1,885.00 T 6 daps Tow cast $8, 5 5 5.6 2 I hereby undergmid and agree to the teems. Prepared by aed conditi0W set forth m this =9trnment By Contraor Approved Own" Title Approved District Cmmruction Approved by CTEP Fuigineering Coordinator i