Loading...
24. Authority to Bid - Storm Sewer Project - 14th St EastMEMO TO: Al Thelen FROM: Bob Babb RE: Storm Sewer Project - Bridge Park DATE: March 27, 1996 14th Street East from 5th Ave. East to Dry The Storm Sewer Project on 14th Street East from 5th Avenue East to Dry Bridge Park has been designed by City staff. We are now at the point where we would like to have permission to go to bid. It is a budgeted item and we would like permission to use these funds. We would also like to buy the materials for the storm drains on 1st Avenue East from 7th to 1 lth Street East. Our City crews will be installing the drains. Incorporated 1892 i ephone (406) 758-7700 FAX (406) 758-7758 Post Office Box 1997 Kalispell, Montana Zip 59903-1997 Date: April 12, 1996 To: Al Thelen, Interim City Manager From: John Wilson, Assistant City Engineer Re: Curb and Gutter for 14th Street East Storm Sewer/Water Project This memorandum is to request authorization from the City Council to order in curb and gutter in the area associated with the 14th Street East Storm Sewer/Water Project. This area includes all of 14th Street between 5th and 8th Avenues East, with the exception of on half block on the north side of the street between 6th and 7th Avenues East. The project includes 1715 feet of curb and gutter to be ordered in and 505 feet of alleys, curve radii and replacement of existing curb to be paid for by the Storm Sewer fund. We estimate a unit price of $9.00IL.F. for this work. Douglas Rauthe Mayor Al Thelen Interim City Manager City Council Members: Gary W. Nystul Ward I Cliff Collins Ward I Norbert F. Donahue Ward II Dale Haarr Ward II 1im Atkinson Ward III Lauren Granmo Ward III Pamela B. Kennedy Ward IV M. Duane Larson Ward IV