Loading...
17. Schedule Public Hearing - Water Connection ChargesCITY OF KALISPELL NOTICE OF PROPOSED RATE INCREASE A proposal to increase the water connection fees charged by the water utility of the City of Kalispell will be presented in a Public Hearing, Monday, May 20th, 1996, in the Council Chambers of City Hall at 7:00 P.M. The increase would be less than 12% of the total revenue and would be effective after 10 days of being filed with the City Clerk. The present connection fee schedule is attached hereto as Exhibit "A". The proposed increase will result in connection fees as set forth in Exhibit "B" and will only apply to those customers desiring to hook into the water system after May 1996. The purpose of the connection fee increase is to provide for the replacement and improvement of the water supply and distribution systems. Any person concerned with these proposals may appear at this hearing and make oral statements or present the same in writing. Written comments may be submitted for Council consideration by delivering them to the City Clerk of Council prior to the hearing. Detailed schedules for services are on file in the Department of Public Works and are available for examination by anyone interested. If there are questions about the fee that might be answered by telephone you may call the Department of Public Works at 758-7720. Provisions for multiple dwelling units will be eliminated in the proposed connection fee schedule. Fees will be based on the size of the water meter. The out of City charge will be increased from 125% to 150% of the in City fees. EXHIBIT "A" Schedule G Connection Fees and New Services Rate: BEFORE THE SYSTEM MAY BE TAPPED FOR ANY SERVICE A CONNECTION FEE MUST BE PAID AS INDICATED HEREIN: Size of Service to the premises Fee A fee of $112 per Dwelling Unit Served with minimum charge as detailed herein: 3/4" Service $ 112 1" 224 1 1/2" 336 2" 448 3" 672 4" and larger 896 CONNECTION OF SERVICE AT THE MAIN: The Utility will perform all required excavation over and around the main to make the service connection and will provide and install the Service Saddle and Corporation Cock and tap the main. For this service the user will be billed at the current city rate for time spent including hourly rate for backhoe and truck, and for material used. Temporary Services and Private Fire Protection Lines will be billed in the same manner. EXHIBIT "B" Indexed Water Connection Fee Schedule (no inflation, 5 percent interest) This revised connection fee schedule is calculated in accordance with the accepted practices published by the American Planning Association. A 5% indexed adjustment is applied to the unamorit:ized infrastructure investment to place the carrying cost of excess capacity on the late coming customers. These tables are derived from formulas identical to those which have been applied in the past for sewer connection fees. Indexed Water Connection Fees (Per household equivalent) YEAR IN CITY OUT OF CITY 1996 $642 $963 1997 $674 $1,011 1998 $708 $1,062 1999 $743 $1,115 2000 $780 $1,171 2001 $819 $1,229 2002 $860 $1,291 2003 $903 $1,355 2004 $949 $1,423 2005 $996 $1,494 2006 $1,046 $1,569 2007 $1,098 $1,647 2008 $1,153 $1,729 2009 $1,211 $1,816 2010 $1,271 $1,907 2011 $1,335 $2,002 2012 $1,401 $2,102 2013 $1,471 $2,207 Special Terms and Conditions: Out of City Fee = City Fee X 1.5 Indexed Connection Fee Schedule for 1996 Meter In City Out of City Size Fee Fee 5/8" $642 $963 3/4" $924 $1,387 1" $1,644 $2,465 11/2" $3,698 $5,547 2" $6,574 $9,861 3" $14,792 $22,188 4" $26,296 $39,444 Connection fees for larger services are not anticipated. If such service is requested, the connection fee will be calculated using the same methodolgy as applied above.