Staff ReportsDEPARTMENT OF BUILDING & ZONING MEMORANDUM TO: INTERIM CITY MANAGER AL THELEN, MAYOR DOUGLAS RAUTHE & CITY COUNCIL FROM: CRAIG KERZMAN, BUILDING OFFICIAL DATE: FEBRUARY, 1996 RE: PERMIT REPORT PERM FEB 1996 FEES RECEIVED FEB 1996 PERMITS JANUARY TO DATE FEES REC JANUARY TO DATE PERMIT FISCAL YEAR FEES REC FISCAL YR TO DATE Building 20 $6,949 38 $9,864 294 $111,623 Plan Review 7 1,372 16 2,177 104 36,116 Plumbing 12 492 35 1,881 185 14,337 Mechanical 20 850 61 3,120 354 20,377 Moving 0 0 0 0 1 600 TOTALS: 59 $9,663 150 $17,042 938 $183,053 February 1996 Jan to Date Fiscal Year to Date ` BUILDING CITY $872,228 $1,087,586 $11,875,808 { VALUATION COUNTY $133,409 $258,079 6,762,286 TOTAL $1,005,637 $1,345,665 $18,638,094 SEWER CAPITOL IMPROVEMENT FUND $4,952 $7,312 $135,931 WATER CONNECTION FEE $448 $1,008 $12,964 BOARD OF ADJUSTMENT FEE $175 $350 $1,400 CAK/ak DEPARTMENT OF BUILDING & ZONING COMMENTS FOR MONTH OF FEBRUARY, 1996 Building Activity: Permits and revenues were up from January, 1996, but down from February, 1995. Permits were issued for eleven single family homes. No major commercial projects started during February. The level of construction activity is lower than it was a year ago. Nonetheless, the contractors whom we serve are predicting a busy construction season. Zonin The City of Kalispell Board of Adjustment met on Tuesday, February 6, 1996, to consider a variance request from Equity Supply. The variance was approved to allow Equity Supply to add to an existing building, with the condition that all interior property lines on the Equity site, 65 Second Avenue WN, will be eliminated to the satisfaction of the building official. Five sign permits were approved in February. Personnel: Brian Wood left the city on February 29th. He was the city's first full-time zoning administrator. The position vacancy has been advertised. The position should be filled by a qualified individual by mid -April. The Certified Plans Examiner is still scheduled for arrival by mid -March. General: During March, the Building Department will put together its budget for the coming year. C aig Kerzman 0 (2 'a a k 4 \ ƒ 2 o © $ 2 2 a I U- (1) % ƒ / \ � J \ c c g « 7 $ § k ƒ / 2 ) < 2 2 I k f } = o < e = ca k CL ( k \ ® in I o ca 2 G t a a 5 CO �) \ 2cE! § / \ \ 7 m = < o CO / 0 k ® R 06 CO @ 2 = .se z\}\? k / / k / » + ® § e $ = z » ƒ A G ® u =SI § ) 2 § § ± c — = § � � I u- ƒ K 2 a G \ § \ a BUILDING PERMIT LIST FROM 02/01/96 TO 02/29/96 PERMIT NUMBER --------------- 96-17 LARRY HADLEY 601 EAST WASHINGTON LOT 7&8 BLK 8 DUNCANS ADD INSTALL NEW EXTERIOR WINDOWS IN EXISTING PENINGS AND FRAME IN OPENINGS. SELF $1,000.00 96-18 RJS DEVELOPMENT, INC. 364 PONDEROSA STREET LOT 17 BUFFALO HEAD CONSTRUCT A 1,692 SF THREE BEDROOM, 2 BATH SFR ON A CRAWL SPACE WITH 576 SF TWO CAR ATTACHED GARAGE. SELF $112,000.00 96-19 KRISTY RAE LOIACONO 441 SYLVAN DRIVE LOT 4 & SOUTH OF LOT 3 BLK3 CONSTRUCT INTERIOR FLOOR AND INTERIOR PARTITIONS TO CONVERT ATTACHED GARAGE INTO A BEDROOM AND BATHROOM. SELF $2,500.00 96-20 LARRY WAKEFIELD 20 NORTH MAIN CONSTRUCT 6' X 6' X4" GLASS BLOCK PARTITION WALL IN EXISTING RETAIL SPACE. SELF $7,346.00 96-21 CHRIS WEST 227 8TH STREET EAST LOT 6 BLOCK 103 KALISPELL ORIGINAL REPAIR FIRE DAMAGE TO BASEMENT APARTMENT AND INSTALL EGRESS WINDOWS TO BEDROOMS. SADINO & YANCK CONSTRUCTION $29,350.00 96-22 GESN PARTNERSHIP 110 SUNBURST COURT LOT 17A GATEWAY ORCHARD VILLAS CONSTRUCT A 1496 SF 2 BEDROOM, 2 BATH TOWNHOUSE ON A EXISTING CRAWL SPACE FOUNDATION WITH 396 SF ATTACHED GARAGE. J & F CONSTRUCTION $92,944.00 BUILDING PERMIT LIST FROM 02/01/96 TO 02/29/96 PERMIT NUMBER ------------- 96-23 ROGER BRENDAL 182 WEST NICKLAUS LOT 209 VILLAGE GREENS CONSTRUCT A 2,014 SF 3 BEDROOM, 2 BATH SFR ON A CRAWL SPACE WITH A 616 SF 2 CAR ATTACHED GARAGE. HUGH E. HOUSTON CONSTRUCTION $133,409.00 96-24 GESN PARTNERSHIP 112 SUNBURST COURT LOT 17B GATEWAY ORCHARD VILLAS CONSTRUCT A 1496 SF 2 BEDROOM, 2 BATH SFR/TOWNHOUSE ON EXISTING CRAWL SPACE FOUNDATION WITH 396 SF ATTACHED GARAGE. J&F CONSTRUCTION $92,944.00 96-25 RJS DEVELOPMENT, INC. 360 PONDEROSA LOT 16 BUFFALO HEAD CONSTRUCT A 3 BEDROOM, 2 BATH 1,440 SF SFR AND 520 SF TWO CAR ATTACHED GARAGE ON EXISTING FOUNDATION. RJS DEVELOPMENT, INC. $.00 96-26 RJS DEVELOPMENT INC. t k 372 PONDEROSA LOT 19 BUFFALO HEAD CONSTRUCT A 3 BEDROOM, 2 BATH 1,440 SF SFR AND 528 SF TWO CAR ATTACHED GARAGE ON EXISTING CRAWL SPACE FOUNDATION. RJS DEVELOPMENT, INC. $.00 96-27 EQUITY SUPPLY 65 2ND AVENUE WN LOTS 2,3,4,5,& 6 CONSTRUCT A 1,200 SF WOOD FRAMED STORAGE AREA ON A PERMANENT FOUNDATION. TOM WIGGIN $24,000.00 96-28 PETER FENNELLY 118 GREENBRIAR DRIVE LOT 10 GREENBRIAR CONSTRUCT A 1051 SF 2 BEDROOM 2 BATH SFR ON A 957 SF 1/2 BASEMENT WITH A 410 SF TWO CAR ATTACHED GARAGE MACKINAW CONSTRUCTION $82,319.00 BUILDING PERMIT LIST FROM 02/01/96 TO 02/29/96 PERMIT NUMBER ------------- 96-29 PETER FENNELLY 112 GREENBRIAR DRIVE LOT 7 GREENBRIAR SUBDIVISION CONSTRUCT A 1220 SF 3 BEDROOM 2 BATH SFR ON A UNFINISHED BASEMENT WITH A 420 SF TWO CAR ATTACHED GARAGE MACKINAW CONSTRUCTION $85,970.00 96-30 GREG RAIN & COMPANY 1822 NORTH BELMAR LOT 4 CONSTRUCT A 987 SF 3 BEDROOM, 2 BATH SFR ON A CRAWL SPACE WITH A 336 SF SINGLE CAR ATTACHED GARAGE. SELF $63,388.00 96-31 THERESA HUNTER 620 1ST AVENUE WEST LOT 60 ELK 94 KALISPELL TOWNSITE ENLARGE FRONT PORCH FROM 10' X 8' TO 10' X 14' AND REMOVE EXISTING PORCH ROOF AND REBUILD A NEW ROOF OVER NEW 1OX14' PORCH. THE TIMBERLAKE COMPANY $750.00 96-32 KEN MADSEN -- 1217 5TH STREET WEST S 18 T28 R21 TR5 DOA IN L2 CONSTRUCT A 12' X 22' DINING ROOM ADDITION TO EXISTING SFR ON A FULL UNFINISHED BASEMENT. SELF $19,404.00 96-33 WAARDEN, CHRISTIANSEN, JOHNSON, BERG 12B 2ND STREET EAST LOT 12 ELK 58 CONSTRUCT INTERIOR PARTITIONS AND CREATE A HANDICAPPED RESTROOM STEVE LIFE $24,000.00 96-34 US PARTNERSHIP II 140 GREENBRIAR LOT 52 GREENBRIAR SUBDIVISION CONSTRUCT A 1089 SF 2 BEDROOM, I BATH SFR ON A UNFINISHED BASEMENT WITH A 504 SF TWO CAR ATTACHED GARAGE. SELF $87,601.00 BUILDING PERMIT LIST FROM 02/01/96 TO 02/29/96 PERMIT NUMBER --------------- 96-35 BRUCE & NORMA BARDWELL 812 8TH AVENUE WEST LOT 12 SHEPHERDS ADDITION CONSTRUCT A 3 BEDROOM, 2 BATH 1,424 SF SFR ON A FULL BASEMENT WITH 576 TWO CAR ATTACHED GARAGE PLUS 432 SF ATTACHED EXTERIOR DECK. SELF $131,712.00 96-36 MAE CHRISTOPHER 1311 - 4TH STREET WEST CONSTRUCT A 8 X 10 FOOT SUN ROOM TO EXISTING HOUSE. H & H CONSTRUCTION $15,000.00 TOTALS: $1,005,637.00 PUBLIC WORKS DEPARTMENT ACTIVITY REPORT March 1996 ENGINEERING :. •:• :: . . ► . ► •: ••:► .: ► : "Mjrja -Completed 1996 Street Overlay and Chip Sealing Bid Proposals and Specifications. Bids will be opened on the 8th. - Issue excavation permits and inspect construction projects. -Sent Notice of Award to Kalispell Sign Corporation for 1996 Opticom Installation. -Water and Sewer Extensions have been completed on Woodland Court project. -14th Street East Project (street, storm drain, and water line replacement) preliminary design completed. -Completed 220 updates to the Special Assessment data base. OFFICE AND STAFF f -Budget preparation continues. -Implementation of IMS Software beginning. -Received over 100 complaint calls during March 4-7th storm. J -138 repair orders were completed during the month of March -Police .............26 - Streets............. 51 -Fire ............... 8 - Garbage ........... 14 Others .............39 -Repaired rear suspension on 1983 Ford Ambulance. -Replaced head gasket on 1985 Loader. -Replaced head gasket on 1969 Loader. WATER PUMPING. STORAGE. DISTRIBUTION -Produced 61.4 M gallons of water. 10.8 M gallons in the upper zone and 50.6 M gallons in the lower zone. -No chlorine injected. SEWER FACILITIES, LIFT STATIONS} COLLECTION -Weekly maintenance of fifteen lift stations. -Video and jet cleaning of sewer line. SOLID WASTE COLLECTIONIDISPOSAL&ALLEY CLEAN UP. -Responded to 48 reported violations. -Delivered 14 containers to new accounts. -Repaired 6 damaged containers. COMTRUC77ONAND MAINTENANCE STREETS. CURBS, GUTTERS. ALLEYS -March 4-7th Storm (14") - snow plowing and removal. -Crack sealed the Airport. -Crack seal for overlay and chip seal project. -General sweeping, flushing, and patching. -Street Department assisted with surveying for GIS. -Tagged 25 delinquent accounts on the east side of city. -Assisted Street Dept. with snow removal. -Exercised valves. -One main break - (bell joint). -Responded to fire hydrant problem during fire - problem corrected itself prior to crew arrival. SIGNALS. SIGNS. STRIPING. SERVICES -Opticom - reviewed intersection with bidders. -Repaired Airport runway lights. -Pruned trees around signs on east side of city. -Attended meeting on new traffic signal at Whitefish Stage & West Reserve Drive. -Attended Work Zone Signing & Barricading school. -Treatment Plant flows have been higher than average since early February. On February 8th and 9th, the flows were 5.2 million gallons and 5.0 million gallons respectfully. The flow during March has averaged 2.4 million gallons per day, with a peak on March 15th of 2.9 million gallons per day. The design capacity of the Plant is 3.1 million gallons per day. -The Gravity Thickener repair work (sand blasting and coating) has been completed and the unit is back on line. We are monitoring the biological phosphorus removal process to see if we can discontinue the use of alum required during our repairs. The cost of alum is approximately $40 per day.