Loading...
Subdivision Improvement Agreement /Phase 4AI Return to: Theresa White Kalispell City Clerk 201 1 st Avenue East Page: I of 7 Kalispell, MT 59901 Paula Robinson, Flathead Countv MT bv NC Fees: $49.0o 8/19/2014 9:54 AM APPENDIX E SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT, made and entered into this day of August _, 20 14 by ant between the CITY COUNCIL, CITY ®F KALISPELL, MONTANA, Party of the First Part and hereinafter referred to as the CITY, and TOUCHSTONE, LLtj. (Name of Developer) a LIMITED LIABILITY CORPORATION (Individual, Company or Corporation) located at 135W IDAHO, SUITE B, KALISPELL, MT. 59901 (Street Address/P. ®. Box) (City, County, State, Zip) Party of the Second Part and hereinafter referred to as DEVELOPER. WITNESSET H: THAT WHEREAS, the Developer is the owner and developer of a new subdivision known as (Location of Subdivision) RANGE 22 WEST, P.M.M., FLATHEAD COUNTY, MONTANA and, WHEREAS, the Citv has conditioned it's approval of the final plat of MOUNTAIN VISTA, -a57-040`7-eZ5 PHASE 4A upon the conditions as set forth (Name of Subdivision) in the Preliminary Plat of the Subdivision being completed and all improvements, as cited in "Exhibit A" have not been completed at this time, and the Developer wishes to bond for the completion of those improvements set forth in "Exhibit A"; and WHEREAS, the City's Subdivision Regulations require that a subdivider shall provide a financial security of 125% of the estimated total cost of construction of said improvements as evidenced by an estimate prepared by a licensed public engineer included herewith as "Exhibit B"; and WHEREAS, the estimated total cost of construction of said improvements is the sum of $— 2623703.00 NOW THEREFORE, in consideration of the approval of the final plat of said Subdivision by the City, Fe=°;ggfao85 1111111IN 8/19/2014 9:54 AM the Developer hereby agrees as follows: 1. The Developer shall deposit as collateral with the City a Letter of Credit, or other acceptable collateral as determined by the City Council, in the amount of $ 328,378.75 . Said Letter of Credit or other collateral shall have an expiration date of at least sixty (60) days following the date set for completion of the improvements, certifying the following: a. That the creditor guarantees funds in the sum of $ 328,378.75 — the estimated cost of completing the required improvements in. MOUNTAIN VISTAZ,5�7r4;r676 ,PHASE4A (Name of Subdivision) b. That if the Developer fails to complete the specified improvements within the required period, the creditor will pay to the City immediately, and without further action, such funds as ar"; necessary to finance the completion of those improvements up to the limited of credit stated in thcs letter; 2. That said required improvements shall be fully completed by August 4 20 15 _- 3. That upon completion of the required improvements, the Developer shall cause to be filed with the City a statement certifying that: a. All required improvements are complete; b. That the improvements are in compliance with the minimum standards specified by the City for their construction and that the Developer warrants said improvements against any and all defects for a period of two (2) years from the date of acceptance of the completion of those improvements by the City; d. That these improvements are free and clear of any encumbrances or liensi e. That a schedule of actual construction costs has been filed with the City; and, f. All applicable fees and surcharges have been paid. 4. The Developer shall cause to be filed with the City copies of final plans, profiles, grades and specifications of said improvements, with the certification ®f the registered professional engineer responsible for their preparation that all required improvements have been installed in conformance with said specifications. IT IS ALSO AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS, TO -WIT: That the Developer shall provide for inspection of all required improvements by a registered professional engineer before the Developer shall be released from the Subdivision Improvement Agreement. That if the City determines that any improvements are not constructed in compliance with the specifications, it shall furnish the Developer with a list of specific deficiencies and may withhold collateral sufficient to insure such compliance. If the City determines that the Developer will not construct any or all of the improvements in accordance with the specifications, or within the required time limits, it may 201400015985 Page: 3 of 7 Fees: $49.00 8/19/2014 9:54 AM withdraw the collateral and employ such funds as may be necessary to construct the improvement or improvements in accordance with the specifications. The unused portions of the collateral shall be returned to the Developer or the crediting institution, as is appropriate. IN WITNESS WHEREOF, the Parties have hereunto set their hands and seals the day and year herein before written. MOUNTAIN VISTA PHASE 4A / TOUCHSTONE LLC (Name of Subdivision/Developer/Firm) by (Name) (Title)" STATE OF MONTANA COUNTY OF j On this 20 day of j 0 /y 20 before me, a Notary Public for the State of Montana, pers nally appeared d 177 —0-A IEP- known to me to be the I of — 7-o u c-,� in A z e 4. whose name is subscribed to the forege(ingjistrument and acknowledged to me that he/she executed the same. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my Notarial Seal this day and year first above written. uT�MARILYN RAUTHE rD1j,'jjS'01-L ` , 71� NOTARY PUDLlc fr-T the s t a, a T,) f cti I t i,,-i na, Notary Vublic for the State of Montana '� SEAL Residing at Kalispell, most". � 'i Printed Name my cofyla-zissir-'n Expires Residing at OF February 05, 2015 My Commission Expires MAYOR, CITY OF KALISPELL ATTEST: tl 4 k\ MAYOR CITY CLERK F,e9"$69Oe85 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 8/19/2014 9:54 AM EXHIBIT 111311 CERTIFICATION OF WORK TO BE COMPLETET MOUNTAIN VISTA PHASE 4A I Completed To Date: 7/2912014 1 Unit Estimated Quantity Total Cost Description Measure Quantity UnitPrice J, Total Price Completed Completed Strip Topsoil @ 6" $9$223.60 Replace Topsoil @ 4' Haul -Off Excess Topsoil $3366.00, Embankment In-Place(Cut to fill onsite,compaction,' grading) MStabation Fabric (Not including Extra for Joint Overlap) 1 1/2" Select Subbase in Roadway (incl. 3'Outside EOP & Hammerhead) 13/4" Crushed Gravel in Roadway 4" Asphalt Paving (incl. Hammerhead) $19,372.6 0 'ICurb & Gutter with Base Material 6'Sidewalk with Base Material (incl. ADA Ramp t I t F I Areas) ',ADA Access Ramps w1 Truncated Domes SUBTOTAL ITEMS 101 - 111 WATER SYSTEM Completed To Date: 7/2912014 Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost Completed 8" Water Main $16716.00 8" Gate Valves, Boxes, & Concrete Collars 4.01 Fittings/Tees/Reducer/Plugs $4,726.001 Fire Hydrant Assembly w/ Pipe, 6" Gate ValveII & Boy! Water Services 3/4" $9,800.00 'Connect to existing $1$700.00' SUBTOTAL ITEMS 201 - 206 $40,,186.00 $40,186.00 Item Unit Estimated No. Description Measure Quantity Unit Price Total Price 301 2" Sewer Force Main L.F. 418 $23.26 $9,718.60 302 2" Ball Valves, Boxes, Concrete Collars EA. 3 $800.00 $2,400.00 303 Sewer Services EA. 7 $1$400.00 $9,800.00 304 New End Run Cleanouts W/ Concrete MH Structure, EA. 2 $2,000.00 $4,000.00 Cover, Concrete Aprons 306 Connect to Existing/Relocate Existing End Run EA. 1 $3,200.00 $3,200.00 Cleanout W/ Concrete Apron jSUBTOTAL ITEMS 301-306 j $29,118.50 Completed To Date: 7129/2014 Quantity Completed Total Cost Completed Mif uuiiiiiiiuiiiuiiimiiuiuiiimiiuiiiiuuiiiimiiuuuiuuuiiiiiiiiiiuiiiii �.a°sas,00e= 8/19/2014 9:54 AM STORM DRAINAGE Completed To Date: 7129120, 4 M Unit Estimated Quantity Total Cost 1 Description Measur%�, Quantity J Unit Price Total Price Completed Completed R emove Existing Catch Basin w/ Infiltration Basin & i -Pipe i #1 PVC !12 Storm Drain =116" PVC Storm Drain $13,772.00 :Catch Basin w/ Ring, Grate, Inlet Apron $12,000.00 INTIMMETAMMH ttl :imp I =rjjrjrjq-TjTj-t, M-ilp 4 0 =Detention Pond Grading/Outlet Structure Outlet Protection W/ Flared End Sections, Riprap, Fabric Temporary Erosion Control For Construction (Silt 'Fence, Straw Wattles, Inlet Protection, Etc. :Permanent Erosion Control (Hydroseeding, Sod, oil Etc.) 'SUBTOTAL ITEMS 401 - 409 ■$5 f 0 Completed To Date: 7129/2014 Description Unit Measur Estimated Quantity Unit Price 7, Total Price Quantity Completed Total Cost Complet ed All Incidentals for Connection to Existing iSubdivision, Including but not limited to: Traffic Control, Asphalt & Concrete Removal, Replacing 'Valve Collar, Curb and SW Replacement After ,Removing Existing Storm Basins, Etc I I ® � �1 1i it ii 1' ',i i� ,Mailboxes Incl. Permits &SWPPP's 6,600.00 (Trees, Benches, Signs, ETC.) Construction Surveying r11 rr ,000.00 'll.�SUBTOTAL ITEMS 601-606 $25,375.00 UTILITIES - TRENCHING, CONDUIT, VAULTS & LIGHTS Completed To Date: 7/29/2014 Item No. Description Unit Measure Estimated Quantity Unit Price Total Price Quantity Completed Total Cost 601 Common Utility Trench w/ Bedding L.F. 862 $9.00 $7,668.00 0 —Completed $0.00 602 1 " Conduit w/ Pull Rope & Sweeps L.F. 66 $2.00 $110.00 0 $0.00 603 2" Conduit w/ Pull Rope& Sweeps L.F. 1704 $2.00 $3,408.00 0 $0.00 604 3" Conduit w/ Pull Rope& Sweeps L.F. 973 $3.00 $2,919.00 0 $0.00 606 1 Phase Transformer Vault EA. 2 $426.00 $860.00 0 $0.00 606 Secondary Pedestals EA. 2 $100.00 $200.00 0 1 $0.00 607 Street Light Bases EA. 2 $1,000.00 $2,000.00 0 $0.00 iSUBTOTAL ITEMS 601-607 1 1 1 $17,155.00 $0.00 Total Construction = $2755308.00 Total Construction Completed to Date = $0.00 IIIiuimuiiiuiiiiiiiiiiiiiiiiuiiiimiiiiiiiiiiiimuiiiuiiiuiiiiiii .�e="sas�ooa= Completed To Date: 7/29/2014 Description Unit Measure7l Estimated Quantity Unit Price Total Price QUANTITY COMPLETED TOTAL• COMPLETED Mi,Flathead Electric - PH4A M(Enineering, Design - P_H4A__ �law I J# =�Engineedn�, C�onstruction - PH4A IE��lll $9,378.001 TOTAL PROJECT TOTAL. COST OF • _ • AMOUNT COMPLETED PRIOR TO BONDING • •&Tffoj- ORIGINAL ■ AMOUNT AMOUNT OF BOND TO BE RETAINED (126% OF REMAINING WORK) BOND AMOUNT TO BE RELEASED PREVIOUSLYAMOUNT , AMOUNT O BE 1.SED AT TIME $ 312,267.00 $ 49,664.00 $ 262,703.00 328,378.76 4,664.00 16% 262,703.00 } ,378.76 'r 1 ` ' i 1 1` AS PROJECT ENGINEER FOR THE MOUNTAIN VISTA SUBDIVISION PHASE 4A, I CERTIFY THAT THE WORK LISTED HEREIN IS CORRECT. IN ADDITION, I CERTIFY THAT THE ASSOCIATED COSTS ARE REASONABLY ACCURATE ESTIMATES OF THE RESPECTIVE COSTS OF THE WORK. THE VALUE OF CONSTRUCTION AND OTHER WORK COMPLETED TO DATE IS ESTIMATED TO BE: $ 49,664.00 THE TOTAL VALUE OF REMAINING WORK, SERVICES AND FEES IS ESTIMATED TO BE: $ 262703.00 SECURITY HELD AT 126% OF THE REMAINING COSTS SHOULD BE IN THE AMOUNT OF: $ 328:378.76 0, % BRETT WALCHECK, P.E. VALLEY BANKor rcnLisaELL vea:°ioi�es $asoo Valley Bank of Kalispell 41 Third Street West Kalispell, MT 59901 (406) 752-7123 July 30, 2014 City of Kalispell Keith Haskins 2 01 1 St Ave. E . Kalispell, Montana 59901 Letter of Credit # 1332 { $328,378.75 RE: Touchstone, LLC 135�W Idaho Street #B Kalispell, MT 59901 ti COP Letter of Credit No. #1332, dated July 30th, 2014, has been issued to the above referenced, with a maturity date of August 4, 2015. Letter of Credit is in` reference to Subdivision Improvement Agreement dated August 4, 2014 for Mountain Vista Subdivision, Phase 4A. Ilk ell 3 Barbara Jean Kimbell 07/30/2014 Vice President, NMLS #486209 Valley Bank of Kalispell 406-752-7123 P.O. Box 48 ® KALISPELL, MT 59903-0048 406-752-7 l 23 s 'FAX 406-752-7320 e WWW. VALLEYBA N KMT.CO M Member FDIC t EQUAL HOUSING LENDER