Staff ReportsPUBLIC WORKS DEPARTMENT
ACTIVITY REPORT
A. OFFICE, REPORTS, BUDGETS, REQUESTS & COMPLAINTS
-122 Work Orders issued
-9 Emergency Callouts recorded
-49 Line locate requests received
B. CENTRAL GARAGE (Jim Snell)
- 104 repair orders were completed during the month of July
-Police . . . . . . . . . . . . . . . . . . . . . . .23
-Parks . . . . . . . . . . . . . . . . . . . . . . .25
-WT/WW/SW . . . . . . . . . . . . . . . . . . . .10
-Garbage . . . . . . . . . . . . . . . . . . . . . .10
-Street . . . . . . . . . . . . . . . . . . . . . . .23
-PW/BD/CD/TSS . . . . . . . . . . . . . . . . . . 5
-Fire . . . . . . . . . . . . . . . . . . . . . . . 8
-Repair of Leaf Machine ongoing -waiting for parts
-Repaired brakes on 332, seal on 192, bearings on 197 & multiple repairs on 103
-Changed electrical cable on ladder truck
-Changed cables & rollers, checked chains for stretch on ladder truck
ENGINEERING
A. ENGINEERING PROJECTS CURRENTLY BEING DESIGNED OR
COORDINATED BY CITY STAFF.
-Overlay Project approximately 80 percent complete
-Chip Seal Project completed
-Continue to issue excavation permits
-Continuing inspection of the following construction projects:
Belmar Subdivision, Lone Pine View Estates Subdivision, Glacier Village Greens Phase V &
Knolls Addition
-Fifth Ave East Sewer Construction Contract awarded to LHC in the amount of $107,317
-Final plans & specifications for 5th Ave East Sewer S.I.D. project approved by DHES
-Continue to update City Special Assessments
-Conducting topographic surveys for the Windward Way/Meridian Road projects
-Prepared spreadsheet data for the Corporate Way S.I.D. proposal
-High School Parking Lot Phase II construction continues
OPERATIONS AND MAINTENANCE
A. WATER PUMPING STORAGE DISTRIBUTION (Ben Van Dyke)
-Continued maintenance of all pumps, motors, reservoirs, grounds and controls for the water
supply system.
-Produced 107,019,000 gallons of water, 27,170,000 gallons in the upper zone and
79,849,000 gallons in the lower zone.
-Injected 66 pounds of chlorine at Lawrence Park pump station.
-Installed metering manhole at Depot well
-Assisted field crews in various projects
B. SEWER FACILITIES LIFT STATIONS COLLECTION ( Vic Schroeder)
-Weekly general maintenance continues at fourteen lift stations
-Video and jet cleaning operations continue
-Pumped holding tanks at Woodland Park, Lawrence Park & Daley Ball Field
-Assisted State Highway Department in clearing plugged culvert
-Cleared partial sewer blockage for Lakeside sewer district
-Installed storm line for School District behind City Shop
C. SOLID WASTE COLLECTION/DISPOSAL (Jack Fournier)
ALLEY CLEAN UP.
-Delivered twelve 100 gallon containers, six 300 gallon containers and three 400 gallon
containers
-Weekly garbage service continues
-Alley clean up continues
-Repaired one 90 gallon container and one 300 gallon container,
-Responded to 5 violations
-Assembling new 100 & 300 gallon roto containers
CONSTRUCTION AND MAINTENANCE
A. STREETS CURBS GUTTERS ALLEYS (Leonard Hogan)
-Sweeping & flushing of city streets & state highways ongoing
-Alley grading ongoing
-Backfilled driveways and parking area for overlay at loth Ave & 5th St West
-Curb patching on 5th Ave East
-Assisted Parks Department at Lawrence Park
-Prepped Glacier View Drive, Utah St and the Gold Nugget alley for paving
-Removed brush piles in alleys with loaders and trucks
-Prepped 12th and 13th St East for overlay
-Two cut outs on Woodland Ave and one at Ashley Square Mall entrance
-Hauled dirt from Grandview Drive to Lawrence Park (Tennis Court Project)
-Landscaped 12th St East between 2nd & 3rd Avenues
B. WATER CONSTRUCTION AND SYSTEM REPAIR (Rarely Vickhammer)
-Replaced 3 fire hydrants
-Work order and complaint resolution continues
-6X6 water tap = 1
-8X6 water tap = 1
-6X4 water tap = 1
-8X 1 water tap = 2
-6X3/4 water tap = 2
-Installed 3 meter pits
-Installed 200' of 1" water line to new restroom at Lawrence Park
-Repaired 2" valve and 8" bell joint at Russell School
-Replaced 1 curb stop
-Assisted Ben with lead samples
-Assisted Street Department with patching
-Repaired 3/4" water line at 4th Ave EN
-Repaired valve box at 3rd St W
-Cleaning and exercising valves
-Finished 6th Ave W project for Phase II High School Parking Lot
-Assisted Parks Department at Lawrence Park
-Meter repair and replacement ongoing
-Finished fire hydrant at Glacier View Drive
C. SIGNALS SIGNS STRIPING SERVICES (Jerry Diegel)
-Continued general maintenance on traffic signals, signs, meters, decorative lights, alley
lights, special lighting, airport runway lights, barricading, banners and sight obstructions
-Placed barricades for 4th of July parade
-Installed ashtrays outside main door to City Hall
-Replaced faded stop sign at Idaho & 7th Ave WN
-Installed new street name signs & pole at Juniper Bend & Grandview Drive
-Installed banners and barricades for Flathead Festival
-Changed Time of Day programming at numerous traffic signals intersections to accommodate
more night traffic
-Placed markers on 1 st Ave East to mark street lines for chip seal
-Re-signed lst St from lst Ave West to lst Ave East
-Signed Main & 1st parking lot for KPC
-Signed lst near WWTP to prevent driving on lawn outside of gate
-Assisted covering crosswalks at 1 st Ave East & Market Place for chip sealing
PUBLIC WORKS DEPARTMENT
WASTEWATER TREATMENT PLANT
ACTIVITY REPORT
JULY 1995
Joanne Emrick
During FY95 (July 1, 1994 - June 20, 1995), we treated 628 million gallons of waste, up from
557 million gallons in FY94 (an increase of 71 million gallons).
The by-product of waste treatment processed is sludge, a substance which requires special
disposal. The Kalispell waste treatment process produces a larger volume of sludge than other
processes, making disposal more costly. In FY95, we hauled 3,085 tons of sludge in 256
truckloads to Glacier Gold Compost in Olney. Each trip to Glacier Gold is 72 miles, and takes
approximately 2.5 hours/trip. Therefore, the cost of hauling sludge during FY95 was:
Tipping Fees to Glacier Gold: $81,259.00
Operator @$12/hr (1/3rd man year): 7,680.00
Truck Fuel: 3,686.00
Total: $92,625.00
The above figure does not include truck depreciation, truck repairs and maintenance (oil changes,
lubrication, etc.), and the cost of an Operator other than wages. Also not included are the costs of
the sludge pressing operation and the 3/4ths Operator man year required to run the operation.
It is also interesting to note that between 1/1/94 and 6/30/94 we produced 1296 tons of sludge and
paid a tipping fee to Glacier Gold of $33,750. During this same time period in 1995 (1/1/95 -
6/30/95), we produced 1692 tons of sludge, and paid $43,930 in tipping fees. During this recent time
period, the Operators have filled the trucks more efficiently, thereby reducing the number of trips to
Glacier Gold, a savings of at least $750.
During FY95, the Operators and the Laboratory Analyst carried out 1434 work orders on Plant
equipment.
Tim Berry of Morrison Maierle has been in the Plant gathering information and data for the Evergreen
sewer rate study. We are in the process of collecting additional data he has requested.
-2-
The first part of July our department started our annual fire hose
testing. Every piece of fire hose is tested annually to make sure
that it is in good working condition.
Our eight personnel that are taking the "Emergency Medical
Technicians Paramedic Course", are still very active in the course.
They are doing their clinical portion of the course by going to
Kalispell Regional Hospital for 12 hour shifts. They are going to
class once a week in the evening to practice their skills for the
National Test. Doctor Doug Smith is riding with our ambulance crew
to give them each 60 hours of Field Internship.
Respectfully Submitted,
Ted A.Main
Assistant Fire Chief
DEPARTMENT OF BUILDING & ZONING
MEMORANDUM
TO: CITY MANAGER BRUCE WILLIAMS, MAYOR DOUGLAS RAUTHE
& CITY COUNCIL
FROM: CRAIG KERZMAN, BUILDING OFFICIAL
DATE: JULY, 1995
RE: PERMIT REPORT
PERM
JULY
1995
FEES
RECEIVED
1995
PERMITS
JANUARY
TO DATE
FEES REC
JANUARY
TODATE
PERMIT
FISCAL
YEAR
FEES REC
FISCAL YR
TO DATE
Building
38
$14,756
274
$113,923
38
$14,756
Plan
Review
15
6,363
95
40,959
15
6,363
Plumbing
26
2,703
179
16,307
26
2,703
Mechanical
40
2,515
247
14,180
40
2.515
Moving
0
250
5
650
0
250
TOTALS:
119
$26,587
800
$186,019
119
$26,587
July, 1995
Jan to Date
Fiscal Year to Date
CITY
$2,101, 976
17,220,544
$2,101,976
BUILDING
COUNTY
725,439
5,081,435
725,439
VALUATION
TOTAL
$2,827,415
22,301,979
$2,827,415
SEWER CAPITOL
IMPROVEMENT FUND
22,440
154,595
22,400
WATER CONNECTION
FEE
896
12,076
896
BOARD OF ADJUSTMENT
FEE
0
1,400
0
CAK/ak
DEPARTMENT OF BUILDING & ZONING
COMMENTS FOR MONTH OF JULY, 1995
BuildingA,ctivity
Building permits were issued for 4 foundations upon which modular homes will be placed.
Permits were issued for 13 single family homes, of which 6 are. townhouses. Once again,
the construction is primarily occurring in the newer subdivisions.
On the commercial side, permits were issued for Big R Ranch Supply on Highway 93
South near the SRS Building; for a new McDonald's in LaSalle near Ernst and for a new
LDS Stake Center on Whitefish Stage Road new Edgerton School.
Construction is proceeding on many projects such as the Whitefish Credit Union, Second
Wind Fitness and the Fernwell Apartments.
Currently under review are proposals for Phase II of Meridian Pointe Apartments,
Mountain Bank in Evergreen, Perkins Restaurant near Shopko, Applebees Restaurant near
WalMart, Vann's appliance store near Evergreen School, Glacier Mercantile near
Evergreen School, and Syth Business Park on Airport Road by Cattlemens.
Zoning:
The Board of Adjustment did not meet in July and no applications have been received for
the August meeting. Code changes and a slight down turn in building activity are likely
the reasons.
The zoning administrator was successful in having the illegally parked used cars removed
from the former Pizza Hut site on West Idaho. A number of other violation investigations
are on -going.
Just two sign permits were issued in July, and a similar number of floodplain
determinations were made. The zoning administrator has been working with the Parks
Department in the siting of the Lawrence Park .pavilion and restrooms (floodplain issues).
Personnel:
Rick Cockrell left the Kalispell Building Department and was hired by the State of
Montana.
General:
It appears that residential construction has showed a bit. Also, while there are no huge
projects such as WalMart of Shopko, there is a significant number of smaller commercial
buildings proposed for construction.
Crai ` erzman
CAK/ak
U
N
a)
�
N
O
G_
O
m
3
O
3
_T
U
O
m
a�
L
24)
cu
VJ
0
00m00(D00OD(D
LL
r C r M r r M
`
3
to a v>�vsta
N
(n
_T
�
U
LL
.N-
r r r N
to E9 KT to ffl
�
LL
f6
�j
N
U
H
c
C
ciscc
y (n m
`
°
3 a a
N
N o a Co
0 -0rUn `m cc N m m N
cv
c m g z
c s N 0.
0. S�
o 7 N
O
0 CO
m Q
-�
to .t o
r r N N r
O O O O O O O
J J J J J J J
al v
> >
y
m
> cc
C 0 'O fA
m
Q
m
C ;
O -o
cll
OD
m m y= c c Cl)
3 m c
N L a �!% Cl) W
06
7 0
r-
m otS a a O
N
E
C o w r `o o�
U V 'aZ
cU
: o o
N= N (n r>> U
o a E m p
C
CD E
c c o c c o
O
(n c y o in m 0
� t:co
= d C p• Q
.p V
E to c c o>> z
Ln
m
m
7 - 7 7 7
p
ao o> LO ui 0 0
r N N N N
7
0
N
V).
t0
co
co
w
w
ui
w
N
}
J
0
w
(9
a
J
F-
O
H
BUILDING PERMIT LIST FROM 07/01/95 TO 07/31/95
PERMIT NUMBER
---------------
95-211
MICHAEL CLARKE
830 BTH STREET WEST
LOT IA HAMMERS SUB OF LOT 2
CONSTRUCT A CONCRETE BASEMENT FOUNDATION FOR A
MOVED ON SFR.
SELF $1,000.00
95-225
MARLENE KNUDSON
206 FARVIEW DRIVE
LOT 8 BLK 2 PARKVIEW TERRACE
CONSTRUCT DECK ADDITION TO EXISTING DECK 5' X 20'
2 SELF $800.00
3
95-226
ROBERT RINKE
513 SOLBERG DRIVE
LOT 2A OF AMENDED PLAT LOTS 1-4 SOLBERG ACRES
CONSTRUCT FOUNDATION ONLY FOR MODULAR HOME MOVE ON AND FOUNDATION ONLY FOR
PRIVATE DETACHED GARAGE.
SELF $9,528.00
95-227
ROBERT RINKE
t
;! 110 PARK DRIVE
LOT 2 RANZI'S ACRES
CONSTRUCT FOUNDATION ONLY FOR MODULAR HOME AND FOUNDATION ONLY FOR PRIVATE
DETACHED GARAGE.
SELF $9,528.00
95-228
NORTHWEST INSTALLATION
239 2ND STREET WEST
LOT 7 BLOCK 48
REMODEL INTERIOR OF EXISTING SINGLE FAMILY RESIDENCE TO CREATE OFFICE
SPACE.
SELF $2,000.00
95-229
GEORGE SCHRADE
115 GREENBRIAR DRIVE
LOT 37 GREENBRIAR SUBDIVISION
CONSTRUCT 3 BEDROOM, 2 BATH, 1214 SF SFR WITH ATTACHED 492 SF GARAGE ON
a
EXISTING FOUNDATION.
MCCORMICK & TAYLOR $75,787.00
95-230
RJS DEVELOPMENT
144 FAIRWAY BLVD.
LOT 63 FAIRWAY ESTATES SUBDIVISION
CONSTRUCT A 1190 2 BEDROOM, 2 BATH TOWNHOUSE SFR, WITH 520 SF ATTACHED TWO
CAR GARAGE ON A PERMANENT FOUNDATION.
SELF $81,245.00
BUILDING PERMIT LIST FROM 07/O1/95 TO 07/31/95
PERMIT NUMBER
---------------
95-231
RJS DEVELOPMENT
145 FAIRWAY BLVD
LOT 64 FAIRWAY ESTATES SUBDIVISION
CONSTRUCT A 1190 SF 2 BEDROOM, 2 BATH TOWNHOUSE SFR, WITH
520 SF ATTACHED
TWO CAR GARAGE ON A PERMANENT FOUNDATION.
SELF
$81,245.00
95-232
ALMAE BENNETT
124 3RD AVE W.
S18, T28, R21
CONVERT CRAWL SPACE TO BASEMENT SPACE UNDER
EXISTING SFR
?
STEVE ELLIOTT
$8,000.00
95-233
CONNOLLY
198 WEST NICKLAUS DRIVE
LOT 201 VILLAGE GREENS S 1/2 S32 29N 21W
CONSTRUCT A 1781 SF 3 BDRM 2 BATH SFR W/ATTACHED
484 SF GARAAGE
H.E. HOUSTON
$118,569.00
95-234
' JIM HANSON CONSTRUCTION
2257 CANVAS BACK COURT
LOT 24 ASHLEY PARK
CONSTRUCT A 1,200 SF SFR ON A CRAWL SPACE WITH A 484 SF TWO CAR ATTACHED
GARAGE.
JIM HANSON CONSTRUCTION
$81,302.00
95-235
STEVEN WELDER AND SARA BLACK WELDER
5 PARK HILL ROAD
LT 3 & 4 BLK 2 WILLIS
CONSTRUCT 10' X 18' AD➢ITION TO EXISTING PRIVATE
SCHOOL BUILDING.
TOM LACHANCE, LACHANCE BUILDERS
$10,000.00
95-236.
MONTE EBY
627 8TH AVENUE WEST
o-
REPLACE RAFTERS AND TRUSSES
HORIZON CONSTRUCTION
$2,000.00
95-237
US PARTNERSHIPS II
130 GREENBRIAR DRIVE
LOT 16 GREENBRIAR
CONSTRUCT A 1415 SF 3 BEDROOM, 2 BATH SFR ON A
CRAWL SPACE WITH AN ATTACHED 575 SF TWO CAR
GARAGE.
SELF
$95,935.00
BUILDING PERMIT LIST FROM 07/01/95 TO 07/31/95
PERMIT NUMBER
---------------
95-238
LHC INC.
2441 HIGHWAY 2 EAST
NE4 S33 T29 R21
REMOVE EXISTING ROOF COVERING AND SHEATHING AND
REPLACE WITH NEW ROOFING.
HAMMERQUIST & CASALEGNO
$25,000.00
95-239
RIKK & TERESA LABERE
2046 SOUTH MEADOWS DRIVE
LOT 5 SOUTH MEADOWS
CONSTRUCT A 24' X 24' 576 SF PRIVATE DETACHED
GARAGE ON A MONO SLAB.
i
NORTH FORK BUILDERS
$6,300.00
95-240
ALAN DAVID
532 MAPLE DRIVE
LOT 21 BLK 2 MOUNTAIN VIEW
CONSTRUCT PERMANENT FOUNDATION FOR MODULAR HOME
MOVE ON.
SELF
$6,400.00
95-241
' LINDA REBHUHM
2010 SOUTH MEADOWS DRIVE
LOT 14 SOUTH MEADOWS
CONSTRUCT A 904 SF, 3 BEDROOM, 1 BATH SFR ON A
CRAWL SPACE.
GREG BAIN & COMPANY
$55,500.00
95-242
ARICO, INC.
1940 SOUTH MEADOWS DRIVE
LOT 201 SOUTH MEADOWS
CONSTRUCT FOUNDATION ONLY FOR 1,024 SF SFR WITH
280 SF GARAGE FOUNDATION.
ARICO, INC.
$5,248.00
95-243
SCHOOL DISTRICT #5
205 NORTHWEST LANE
CONSTRUCT FLOOR PLATFORM AND FRAME A PARTITION TO
CREATE A STORAGE AREA.
ROBERT ROSS CONSTRUCTION
$3,000.00
BUILDING PERMIT LIST FROM 07/01/95 TO 07/31/95
PERMIT NUMBER
---------------
95-244
KEITH ALBRIGHT
91 WESTVIEW DRIVE
LOT 22 TWO MILE TRACTS PHASE II
CONSTRUCT 100 SF OF DORMER TO BE USED AS A SEWING
ROOM.
FORD CONSTRUCTION CORP.
$4,000.00
95-245
ROSE COTTRELL
248 GLENWOOD DRIVE
LOT 13 BLK 3 ADAMS ADDITION
CONSTRUCT 280 SF DECK ATTACHED TO HOME.
? SELF
$2,600.00
4
95-246
RANCH AND HOME SUPPLY
2380 HIGHWAY 93 SOUTH
TRACT 3 S20 T28N R21W
CONSTRUCT FOUNDATION ONLY FOR 22,255 SF RETAIL
SALES BUILDING
CLARKE AND MEREDITH
$100,000.00
95-247
MCDONALD'S CORPORATION
2065 HIGHWAY 2 EAST
:. .' LOT 2B NW 4 SE4 S4 R21W
CONSTRUCT A 4,361 SF SINGLE STORY FAST FOOD
RESTAURANT
ROBERT ROSS CONSTRUCTION
$250,124.00
95-248
MATT 6 BONNIE RIGG
219 MAIN STREET
LOT 20 BLK 56
CONSTRUCT A 12 X 23.5' SF GARAGE IN A CORNER OF TWO EXISTING BRICK
BUILDINGS.
SHOOTING STAR BUILDERS
$4,371.00
95-249
PAUL ROYBAL
1229 7TH STREET WEST
LOT 6 BLOCK 2 TRACT 2
REMODEL EXISTING CHURCH TO SINGLE FAMILY RESIDENCE; 960 SF WITH FULL
BASEMENT.
SELF
$19,200.00
95-250
STEVE BLAIR
214 MAIN STREET
BLOCK 55 KALISPELL ORIGINAL
ADD OFFICE AND STORAGE AREA TO EXISTING BASEMENT.
SELF
$25,262.00
BUILDING PERMIT LIST FROM 07/01/95 TO 07/31/95
PERMIT NUMBER
---------------
95-251
TIM 5 CINDY TRACY
1212 1ST AVENUE EAST
LOT 2 BLK 215 ADDITION 3
FRAME IN EXISTING PORCH FOR WINDOWS.
SELF
$1,650.00
95-252
MONTANA MEDICAL BENEFIT PLAN, INC.
1351 HIGHWAY 2 EAST
RENOVATE BUILDING AND ADD ON SECOND FLOOR ON WEST
HALF OF EXISTING BLDG.
i GLENN'S CONSTRUCTION LLC
$120,000.00
95-253
KEN WILCOX
1485 WILLOW GLEN DRIVE
TRACT 1 S28 T28N R21W
CONSTRUCT FDN ONLY FOR MODULAR HOME MOVE ON. CONSTRUCT A 28' X 30'
PRIVATE DETACHED GARAGE ON A MONOLITHIC SLAB.
SELF
$14,640.00
95-254
RUSSELL SWINDALL
1151 SIXTH STREET WEST
LOT 2 S10 T28N R21W
CONSTRUCT 1,008 SF TOWNHOUSE WITH 2 BEDROOMS AND
1 BATH.
SELF
$61,992.00
95-255
RUSSELL SWINDALL
1153 SIXTH STREET WEST
LOT 2 S10 T28N R21W
CONSTRUCT 1,008 SF TOWNHOUSE WITH 2 BEDROOMS, 1
BATH.
SELF
$61,992.00
95-256
JUNIPER BEND DEVELOPMENT CORP.
143 JUNIPER BEND DRIVE
LOT 11-B JUNIPER BEND PHASE III
CONSTRUCT FOUNDATION ONLY FOR 2,430 SF 3 BEDROOM, 3 BATH TOWNHOUSE
AND 451 SF ATTACHED GARAGE.
JUNIPER BEND INC.
$10,000.00
95-257
JUNIPER BEND DEVELOPMENT CORP.
149"JUNIPER BEND DRIVE
LOT 11-A JUNIPER BEND PHASE III
CONSTRUCT FOUNDATION ONLY FOR 2,430 SF 3 BEDROOM, 3 BATH TOWNHOUSE WITH
451 SF ATTACHED GARAGE.
JUNIPER BEND INC.
$10,000.00
BUILDING PERMIT LIST FROM 07/01/95 TO 07/31/95
PERMIT NUMBER
---------------
95-258
CAROL M. GUSTIN
155 BTH AVENUE WN
LOT 7 ELK 150
CONSTRUCT A 208 SF UTILITY ROOM
MIKE STORFA
$14,500.00
95-259
JAMES MYREN
116 GARLAND
PARCEL 5 TRACT 5AH Sl T28N R22W
CONSTRUCT A 2,224 SF 2 BEDROOM, 2 BATH SFR ON
EXISTING FOUNDATION.
BENCHMARK HOMES
i
$83,408.00
4
95-260
RON & CINDY BOESPFLUG
515 COUNTRY WAY EAST
LOP 34 COUNTRY VILLAGE T31 S29 R21
CONSTRUCT FOUNDATION PORTION ONLY FOR 1,290 SF 3
BEDROOM, 2 BATH SFR.
BENCHMARK COMPANY INC.
$5,160.00
95-261
CHURCH OF JESUS CHRIST OF
1380 WHITEFISH STAGE ROAD
LOT 11027 SW4 S31 SW4 S 32 TRACT 2
CONSTRUCT A 25,757 SF CHURCH WITH CLASSROOMS AND
GYMNASIUM AREAS.
HAMMERQUIST & CASALEGNO
$1,358,681.00
95-264
REX & DONNA DENISON
239 FOREST DRIVE
TRACT 1 GOVT LOT 1 S4 T28N R21W
CONSTRUCT A 6 X 26 ADDITION TO DECK
BRUCE FITZGERALD
$1,248.00
TOTALS: