Re: Change Order for High School Parking Lot Project
This memo is to request a change order for the High School parking lot contact with
LHC. The attached proposal' is to repair a section of damaged sewer main in the alley
next to the parking lot for the amount of $5550. A photograph of the problem area
shows that the 8 inch clay sewer main is shattered where a b inch service lateral
protrudes about 3 inches into the main.
LHC is currently importing subgrade material and prepaing the parking lot and alley to
grade for paving. For this repair to be coodinated with the project, the change order
will need to be authorized as soon as possible.
Although the job involves few materials, the sewer main to be repaired is about 12 feet
deep, beneath a 4 inch gas main and a storm sewer main with 3 foot joints. LHC
estimates 12 hours of labor and equipment to complete the job. Linder these
circumstances, we believe the proposal is reasonable.
If authorized. we will direct LHC to make these repairs immediately.
Douglas Rauthe
?Mayor
Bruce Williams
City Manager
City Council
MemDers:
-ary W. Nvstul
:Nara I
C'iff Collins
`Hard I
Barbara Moses
Wara 11
Dale Haarr
Wara II
Jim Atkinson
.Vary III
Lauren Cranmo
Ward III
Pamela B. Kennedy
Naro IV
A. Duane Larson
`.Nara IV
:;y►'-/LHC incorporated
CONSTRUCTION
OPERATIONS
1179 Stillwater Rd. — PO Box 7338 — Kalispell, MT 59904 — Ph 406-756-3467 — Fax 406-756-0357
7/10/95
:fir. John Wilson
Assistant City Engineer
Kalispell Public Works
Kalispell, Montana 59901
Re: Sewer Service Repair rHS Parking Lot
Dear John,
LHC Inc. will provide labor, equipment, and materials for the
repair of the existing sewer service West of the auto mechanics
building on the above mentioned project as outlined below.
Materials:
2 ea flexible couplers PVC X Clay for mainline
1 ea flexible coupler PVC X Clay for service line
1 ea inline 8" x 4" wye
1 ea 4" 45 street ell
13 if SDR 35 mainline pipe
-40 if SDR 35 service pipe
Labor:
As required to install above described parts.
Equipment:
As required to install above described parts.
Backf ill :
Sand bedding around pipe with Pitrun Backfill and compaction to
subgrade ei.�vation.
Total price as described $5,550.00
Thank You for the opportunity to quote you on this work. If you
have any questions please contact me.