Loading...
Staff ReportsCITT OF MULISPELL CASH RECONCILEMENT AT THE CLOSE OF BUSINESS DATE: 6/ 30/ 94 CASH ON HAND & DEMAND DEPOSITS: NORWEST C ON H. $65,724.13 NORWEST CHECKING 46,669.31 VALLEY CHECKING 502.73 NORWEST CITY HEALTH FUND 40,218.18 CITY HEALTH FUND STIP 327,418.02 STIP PROGRAM 8,112,558.78 NORWEST SWIMMING ACCT 35,94257 BIDDER'S BONDS 25,000.00 SUB -TOTAL DEMAND DEPOSITS: $8,654,033.72 INVESTMENTS: CERTIFICATES: VALIC $208,72853 GLACIER BANK: INT. SUBS. 12,535.47 (UDAG) 44,526.02 LOAN GRANT 3,720.22 OTHER INVESTMENTS: SEWER: 1987 S & C BONDS $5,275.00 SEWER: 1988 S & C BONDS 16,411.33 SEWER: 1989 S & C BONDS 8,000.00 SEWER: 1990 S & C BONDS 9,100.00 MERIDIAN 1990 S & C 3,722.68 SEWER: 1991 S & C BONDS 2,812.84 TOTAL INVESTMENTS: —V— tgR3 I l TOTAL TO BE ACCOUNTED FOR: Respectfully Submitted Claudia M. Bailey Assistant Finance Director SEWER: 1992 S & C BONDS 9,000.00 SEWER: 1993 S & C BONDS 5,11258 $328,944.67 800.00 $8,983,778.39 PUBLIC WORKS DEPARTMENT ACTIVITY REPORT JULY 1994 A. OFFICE, REPORTS, BUDGETS, REQUESTS & COMPLAINTS. -Capital Improvement Report nearing completion. B. SUPERVISION PERSONNEL & SAFETY. -Greg Thurston was notified that he passed the National and the Montana State exam and is now a Registered Land Surveyor. C. CENTRAL GARAGE. (Jim Snell) -137 repair orders were completed during the month of July. -Police 21 -Parks 27 -WT/WW/SW 13 -Street 35 -Garbage 20 -Fire 13 -PW/BD/CD/TSS 05 -Rebuilt suction head on Tymco sweeper. -Repainted wastewater truck to all white. -Rebuilt garbage truck box floor. -Replaced bent head on Elgin sweeper (new sweeper from MDOT). -New garbage truck - narrowed mirrors, raised steps, added steps to box and by hyd tank, changed rubber edge to steel, added night light. Northwest Truck is performing warranty work. -Mounted new tires on #321 garbage truck and #372 grader. -Changed starter on #321 garbage truck. -Attended welding school. ENGINEERING A. DESIGN SURVEY ESTIMATES RFP INSPECTION & PROJECTS. -Update Horizon's, Inc. with requested information for Phase I map. -Continue to monitor construction on the South Meadows and Ashley Park utility and street projects. -Continue public right-of-way inspections. -Westside project construction began July 5. A. DESIGN SURVEY ESTIMATES RFP INSPECTION & PROJECTS. Continued -Design for 8th Ave. E.N.ICalifomia St. water main project commencing. -Annual contracts for Sidewalk, Curbing and Materials awarded. -Utah St. water main construction began July 18 and completed July 27. -Continue project coordination and inspection for Meridian Pointe, Western Pines, Depot Park water tap. -Plan review complete or in progress for Glacier Village Green Phases V and VI, Bluestone utility extensions. -Utility pre -design meetings held for Bluestone, Taverite utilities (8th St. W.), Dr. Wood (Meridian & Three Mi), Keller (Hwy 93 north of Four Mi)., Connor's Corner (Willow Glen). -Research 201 Facilities Plan regarding boundary definition for utility extensions. -Informed by mail all property owners identified in 1986 study as having roof drains discharging the sanitary sewer they will be assessed in accordance with Ordinance No. 1029 if discharge continues. -Site reviews: Education Recovery Foundation, Northwest Healthcare CUP, Gateway Orchard Villas, Paper Chase, Taco Bell, Dale Hall Duplex, Nickel Cars, South Meadows, High School Parking Lot, First Ave. W.N., Conner's Corner Subdivision. -Amended T D & H North Side Water Well contract to include evaluation of existing well(s) on school section. -Awarded contract for School System Maintenance Warehouse project to Northwest Building Systems. Project began July 22. -Conducted preliminary survey and prepared design for 532 LF of storm drain on Harrison Boulevard. -Worked with street division preparing City Shop area for paving. Installed bollards in front of the overhead doors on the solid waste warehouse prior to paving. -Conducted three PTI Communications project reviews. OPERATIONS AND MAINTENANCE A. WATER PUMPING STORAGE DISTRIBUTION. (Ben Van Dyke) -Continued maintenance of all pumps, motors, reservoirs, grounds and controls for the water supply system. -Produced 197,191,000 gallons of water, 154,938,000 gallons in the upper zone and 42,253,000 gallons in the lower zone. -Injected 93 pounds of chlorine at Lawrence Park pump station. -Repaired uninterrupted power source for telemetry controls, replaced storage battery. -Salvaged electrical controls from old WWTP filter building to be used in booster station. -Performed numerous flow tests on hydrants. -Assisted field crew on hydrant replacements and Utah St. water main project. -Correcting overheating problem with Buffalo Hill pump motor and inconsistent amp readings. -Repaired irrigation system for reservoirs. B. SEWER FACILITIES LIFT STATIONS COLLECTION. ( Vic Schroeder) -Weekly general maintenance continues at fourteen lift stations. -Video and jet cleaning operations continue. -Cleaning leaves and debris from storm drain inlets. -Pumped septic tanks at Lawrence Park and Woodland Park. -Installed 540 LF of 8" storm line on Harrison Boulevard with inlets. -Cleaned storm line holding ponds. -Set new catch basin on 3rd Ave. E. and 18th St. E. -Installed high temperature gauges on pumps at Lift Station ##3. C. WASTEWATER TREATMENT PLANT. (Joanne Emrick) -Continuing to work with Electrical Engineer on power outage and other electrical problems. The two isolation transformers he recommended have been installed. -Pacific Power and Light is presently installing a new line from the power pole to connect with the new line placed during construction. The entire power line coming into the Plant will then be new. -Bob Piorek, Laboratory Technician/Operator, was fully certified as a Class 1 WWTP Operator on July 5th. -A new gas alarm system that matches the system put in the new WWTP was installed in the Digester Building. -Installing different primary clarifier scum pumps. The existing pumps do not pump scum. i - -Working on final WWTP construction projects, such as demolishing the old Office/Filter Building, demolishing an old digester, landscaping the grounds, electrical changes, roofing and painting, installing hydrants, walkways, spray systems, etc. -Began accepting wastewater from the Evergreen Sewer District. Initial meter readings taken on July 8. Expecting small quantities as customers begin to come on line. All should be on line by November. Also took a tour of their several Lift Stations to understand how the system works. -There were no discharge permit violations for this month. -Hauled 211 tons of sludge averaging approximately 17.1% solids to the composting facility in Olney. D. SOLID WASTE COLLECTION/DISPOSAL (Jack Fournier) ALLEY CLEAN UP. -Weekly garbage service continues. -Alley clean up continues. -Extra containers were furnished for special baseball and park events. CONSTRUCTION AND MAINTENANCE A. STREETS CURBS GUTTERS ALLEYS. (Leonard Hogan) -Street sweeping and flushing ongoing throughout city and 30 hrs/wk on state hwys per Elgin sweeper contract. -Grading and dust coating alleys. A. STREETS CURBS GUTTERS ALLEYS. Continued (Leonard Hogan) -Prepped and paved utility cut for storm line on Harrison Blvd. -Prepped 18th St. E. between 5th Ave. and 3rd Ave. for paving. -Backfilled edges on overlay project and curb on 18th St. E. -Prepped 9th St. E. prior to paving. -Patched utility cuts following sewer division work. -Reconstructed turn out on Glacier View Dr. -Prepped alley for paving at 1045 S. Main. -Replaced sod on Hilltop. -Assisted water division on Utah water main installation project. -Assisted parks division on Washington Park wood chips and grading. -Hauled dirt to yard for landscaping. -Continue to mill uneven sidewalks around schools. -Prepped and paved city yard with available asphalt (need appx. 1,000 tons to complete). -Placed rock in washed out area on N. Meridian Road. -Paved 18th St. between Hwy 93 and Airport Rd. B. WATER CONSTRUCTION AND SYSTEM REPAIR. (Randy Vickhammer) -Work order and complaint resolution continues. -Tagged delinquent accounts. -Meter repair and replacement ongoing. -Replaced one curb box. -Replaced two fire hydrants. -Installed one 3/4" water tap. -Installed two 8" x 8" water taps. -Installed two 6" x 6" water taps. -Working on Utah Street - 440 LF water main project. -Installed 2" water line to Depot Park. C. SIGNALS SIGNS STRIPING SERVICES. (Jerry Diegel) -Continued general maintenance on traffic signals, signs, meters, decorative lights, alley lights, special lighting, airport runway lights, barricading, banners and sight obstructions. -Hired contractor to install banners due to boom truck problems. -Painting crosswalks - 90 % complete. -Completed Drug Free Zone sign installation project. -Installed new cabinet and controller at Idaho & Meridian. -Installed three stop signs; two at 4th Ave. W.N. and W. Wyoming; one at 2nd Ave. W.N. and W. Wyoming. -Contracted out boom truck work. Minor repairs to the city -owned boom truck remaining. -98 % complete with street name signing on the west side, two intersections remaining. -Arranged fire extinguisher inspection for shop area. -Rewired Blue Moon intersection for left turn to South from East Hwy 40 and Hwy 2 for MDOT. The City of Kalispell Incorporated 1892 Telephone (406)752-6600 Building Department -C (406)755-8017 Craig A. Kerzman r" 3rd Ave E, PO Box 1997 Building Official Zip 59901 Brian J. Wood DEPARTMENT OF BUILDING &ZONING Zonina AdministratorDwain Elkins MEMORANDUM Plans Examiner Richard "Dick" Fura Building Inspector TO: CITY MANAGER BRUCE WILLIAMS, MAYOR DOUGLAS RAUTHE Terry Kramer Building Inspector & CITY COUNCIL FROM: CRAIG KERZMAN, BUILDING OFFICIAL DATE: June 3C, 1994 RE: PERMIT REPORT FISCAL YEAR END 1994 PERM JUNE 1994 FEES RECEIVED JUNE 1994 PERMITS JANUARY TO DATE FEES REC JANUARY TO DATE PERMITS FISCAL YEAR FEES REC FISCAL YR TO DATE BUILDING 63 24,428 301 123,605 589 196,898 PLAN REVIEW 25 8,780 116 43,810 229 75,770 PLUMBING 38 2,190 162 8,948 311 23,155 MECHANICAL 20 610 189 13,301 497 29,214 MOVING 1 100 9 750 16 1,300 EXCAVATION 0 0 0 0 2 0 TOTALS: 147 36,108 777 190,414 1,644 326,337 JUNE 1994 JAN TO DATE FISCAL YR TO DATE CITY 2,693,511 11,310,098 21,119,050 BUILDING COUNTY 1,420,548 9,436,804 13,596,599. VALUATION TOTAL 4,114,059 20,746,902 34,715,649 SEWER CAPITOL IMPROVEMENT FUND 24,375 54,375 125,125 WATER CONNECTION FEE 5,264 11,997 26,316 BOARD OF ADJUSTMENT FEE 1,050 2,725 4,125 CAK/ak SEWER & WATER REPORT CONNECTION FEES PAID JUNE, 1994 Name/Address Sewer Water Fairway Blvd Partners 151 Fairway Blvd 625.00 140.00 Debbie Tudor 2118 South Woodland Dr 625.00 Ivan O'Neal 5 Unit Apartments Building #6 Birchwood Ct 2500.00 560.00 Ivan O'Neal Birchwood Ct Apts Office/Laundry Bldg 1706 5th Avenue East 1,250.00 224.00 Minute Man Builders 1507 1 st Avenue West 500.00 112.00 West Valley Builders 2148 South Woodland Dr 625.00 140.00 ARICO, Inc. 1931 Gardenway 500.00 112.00 Chad Clemons 2112 South Woodland Dr 625.00 140.00 David & Janet Yonkers 2034 South Meadows Dr 500.00 112.00 Dave and Dora Bradley 2058 South Meadows Dr 500.00 112.00 SUBTOTAL 8,250.00 1,652.00 Page Two Sewer Water Name/Address SUB TOTAL PAGE 1 8,250.00 1,652.00 Luke D. Chapman 1972 Dunmovin 500.00 112.00 Ivan O'Neal 5 Unit Apartments Building #5 Birchwood Ct 2,500.00 560.00 American Land & Dev. 102 Mallard Drive 625.00 140.00 Peter Fennelly 1903 Gardenway 500.00 112.00 City of Kalispell 1842 Alrport Road Building #1 10 Unit apts Courtyard Apts. 5,000.00 1,120.00 City of Kalispell 1842 Airport Road Building #2 6 Unit apts Courtyard Apts. 3,000.00 672.00 City of Kalispell 1842 Airport Road Building #3 8 Unit apts Courtyard Apts 4,000.00 896.00 SUBTOTAL PAGE 2-7 16,125.00 3,612.00 GRAND TOTAL JUNE 1994 SEWER/WATER FEES $24,375.00 $5,264.00 DEPARTMENT OF BUILDING & ZONING COMMENTS FOR END OF THE MONTH REPORT For Fiscal Year Ending June 30, 1994 Building Activity The month of June saw permits issued for 21 single family homes primarily built in South Meadows, Fairway Boulevard and Meadow Park. Also in June permits were issued for more 5-plexes at Birchwood and for the 3 multi- family buildings for the City's Courtyard project. Commercial projects (walmart, Blockvuster Video, Shopko, TCI Communications, Special Senses), continue to progress while others are under review and should begin construction this summer. Zonina Administrator's Report at Fiscal Year End 55 permits were issued for some 81 new signs. Approximately two dozen "temporary" sign permits were issued, primarily for banners and readerboards associated with special commercial events. Amendments to the city's zoning ordinance were made periodically during the year, as staff and council continue to fine tune the document adopted in March of 1992. The Zoning Administrator, in addition to staffing the Board of Adjustment, represented (F, the department throughout the (on -going) Cooperative Planning Coalition process of - developing a master plan for Flathead County. Workshops attended by the administrator included the State of Montana sponsored Floodplain Management Course in Missoula, and a series of Planning and Zoning seminars in Denver, Colorado, sponsored by the University of Wisconsin -Madison College of Engineering. Violations of the zoning ordinance, primarily sign and land use issues, continue to require a substantial amount of staff time. Board of Adjustment The Board of Adjustment considered 14 requests for variances during the fiscal year. The Site Review Committee considered over 375 agenda items during the last 12 months. General Building activity for the year was ahead of 1993 both in the city and in the extraterritorial area. The single family residential market remained strong during the fiscal year. We are starting to see more activity in the multifamily and commercial construction market which typically lags two to three eyars behind residential building booms. Page two EOM Comments June 30, 1994 With the current amount of available lots and subdivision activity there should be sufficient buildable lots to allow single family and multifamily residential construction to continue. With several proposals under consideration, it is anticipated that commercial construction will continue at roughly the 1993 pace. Craig Kerzman, Building Official CAK/ak BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER --------------- FA -WAY BLVD PARTNERS 150 FAIRWAY BLVD LOT 69 FAIRWAY BLVD. TOWNHOUSE PHASE 4 CONSTRUCT A TWO STORY 1318 SF SFR ON A CRAWL SPACE WITH A 484 SF TWO CAR ATTACHED GARAGE. RJS DEVELOPMENT $155,177.00 94-247 HENRY PATTERI 519 3RD AVENUE EAST LOT 10 BLOCK 82 KALISPELL ORIGINAL CONSTRUCT A 25' X 30' TWO CAR PRIVATE GARAGE ON A CONCRETE MONOLITHIC SLAB. SELF $7,125.00 94-248 FAIRWAY BLVD PARTNERS 149 FAIRWAY BLVD. LOT 68 FAIRWAY BLVD TOWNHOUSES PHASE 4 CONSTRUCT A 1318 SF SFR ON A CRAWL SPACE WITH A 484 SF TWO CAR ATTACHED GARAGE. RJS DEVELOPMENT $84,126.00 94-249 FAIRWAY BLVD. PARTNERS j 'AIRWAY BLVD. LOT 70 FAIRWAY BLVD TOWNHOUSE PHASE 4 CONSTRUCT A 1318 SF SFR ON A CRAWL SPACE WITH A 484 SF TWO CAR ATTACHED GARAGE. RJS DEVELOPMENT $84,126.00 94-250 DEBBIE TUDOR 2118 SOUTH WOODLAND DRIVE LOT 156 CONSTRUCT A NEW 1008 SF SFR ON PARTIAL UNFINISHED (286 SF) BASEMENT WITH ATTACHED ONE CAR GARAGE (312 SF). WILDWOOD BUILDING $66,721.00 94-251 AMERICAN LAND & DEVELOPMENT 103 MALLARD DRIVE LOT 15 MEADOW PARK SUBDIVISION CONSTRUCT A 1335 SF SFR ON A CRAWL SPACE WITH A 440 SF TWO CAR ATTACHED GARAGE. AMERICAN LAND & DEVELOPMENT $84,476.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER --------------- 94=-.,2 IVAN O'NEAL 601, 603, 605, 607, 609 BIRCHWOOD COURT SEC 17 T28N R21W TR2 CONSTRUCT A FOUNDATION ONLY FOR A 5 UNIT APARTMENT BUILDING DENMAN CONSTRUCTION $10,000.00 94-253 OTTO BESELY 543 FIRST AVENUE EAST, KALISPELL, MT 59901 REPAIR EXISTING SUPPORTS TO FRONT PORCH. TREWEEK CONSTRUCTION $4,400.00 94-254 FRAZEE MT. INVESTMENTS. INC. 35 WEST IDAHO STREET LOTS 13,14,15,16,17,18 BLK 6 KO CONSTRUCT A 5,231 SF RETAIL STRUCTURE ON PERMANENT FOUNDATION. FRAZEE MT. INVESTMENTS. INC. $236,010.00 94-255 IVAN O'NEAL 2 5TH AVENUE EAST CONSTRUCT A 1,440 SF OFFICE/LAUNDRY ROOM. DENMAN CONSTRUCTION $52,000.00 94-256 MINUTE MAN BUILDERS 1507 FIRST AVENUE WEST BLOCK 1, LOT 14 & 15 CONSTRUCT A FOUNDATION ONLY FOR OFFICE STRUCTURE. MINUTE MAN BUILDERS $10,000.00 94-257 TCI COMMUNICATIONS 333 1ST AVENUE EAST LOTS 16 & 17 BLOCK 64 KALISPELL ORIGINAL CONSTRUCT A 25' X 40' FOUNDATION FOR A EQUIPMENT STORAGE BUILDING (PHASE II). ROBERT ROSS CONSTRUCTION $5,000.00 94-258 LARRY LAUTARET 850 SUNNYSIDE DRIVE 7AACA & 7AAAA S19 T28 R21 CONSTRUCT A 1152 SF SFR ON A FULL BASEMENT WITH A 672 SF TWO CAR ATTACHED r-"'SAGE. HUSTED $94,988.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER 91. -59 HELEN E. BRECHEL 386 PONDEROSA STREET LT21 BLK 8 BUFFALO HEAD CONSTRUCT A ROOF OVER EXISTING DECK HOLOMBO CONSTRUCTION $2,450.00 94-260 JIM VASHRO 1837 STAG LANE LOT 56 BLK 2 GREENACRES WEST NO. 2 CONSTRUCT A 24' X 28' ATTACHED TWO CAR GARAGE ON A PERMANENT CONCRETE FOOTING. SELF $9,824.00 94-261 TIM BENNETT 523 COUNTRY WAY NE 4 S31 T29N R21W COUNTRY VILLAGE #2 CONSTRUCT A 32' X 32' ATTACHED PRIVATE GARAGE ON A PERMANENT FDN. SELF $11,500.00 94-262 JACK BURCHAM % SOUTH WOODLAND DRIVE LT B BLK 2 KNOLLS ADD NW 1/4 SE 1/4 SEC 17 T28N R21W CONSTRUCT A 24' X 24' GARAGE ON A PERMANENT FOUNDATION. TRINITY REMODEL $4,850.00 94-263 JOHN W. MARTELLO 118 WEST NICKLAUS AVENUE LOT 6 GLACIER VILLAGE GREENS PHASE I CONSTRUCT A NEW FOUNDATION FOR 28' X 48' MODULAR HOME. ALPINE BUILDERS $7,000.00 94-264 ROBERT RUONAVAARA 2148 SOUTH WOODLAND DRIVE LOT 151 GREENACRES WEST IV CONSTRUCT A 1452 SQ FT HOUSE WITH AN ATTACHED GARAGE WEST VALLEY BUILDERS $92,603.00 94-265 KATHRYN SHAW 210 NORTH RIDING ROAD ?''" 45 MEADOW LAND UNIT #II JDEL KITCHEN ; CHANGEOUT SINK IN MAINFLOOR BATHROOM; ADD BATHROOM ON SECOND FLOOR. BILL FOULTNER $7,746.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER --------------- 94 66 MARVIN CURRIER 1623 MONTANA HIGHWAY 35 TRACT 6D W 1/2 SW OF NW N OF US HWY 2 CONSTRUCT A 24' X 30' CARPORT ON A MONO SLAB NOVAK BUILDERS $4,000.00 94-267 KIMBERLY JACOBSON 1130 7TH AVENUE EAST CONSTRUCT AN 11'4" X 8' ADDITION TO EXISTING HOUSE, AND UPGRADE EXISTING ADDITION. PERELLI-MINETTI CONST $6,900.00 94-268 WOODLAND MAIN STOP, TERRY SCHEND 81 WOODLAND PARK DRIVE LOT B BLOCK 3 PHILLIPS ADDITION ADD WALL ON TOP OF BEVERAGE COOLER UNITS. JIM PONASKI $800.00 94-269 BILL AND KAREN DAVISON 215 SECOND AVENUE WEST t_ i16 & 17 BLOCK 54 KALISPELL ORIGINAL REPAIR BROKEN AND CRACKED PLASTER WITH DRYWALL. SELF $500.00 94-270 DONALD KISLER 1385 CREEKSIDE COURT 66D S14 T28 R22W CONSTRUCT A 4,700 SF SFR WITH A 880 SF ATTACHED GARAGE. TAVERRITE CONSTRUCTION $205,875.00 94-271 ARICO, INC., P.O. BOX 5376, KALISPELL, MT 59903 1931 GARDENWAY, KALISPELL, MT LOT 179 SOUTH MEADOWS CONSTRUCT A 1008 SF SFR ON A CRAWL SPACE WITH A 288 SF ATTACHED SINGE CAR GARAGE. ARICO, INC. $73,000.00 94-272 MIKE DAILEY 1001 SOUTH MAIN STREET LOT 21, 22,23,24 ELK 133 KALISPELL ORIGINAL INSTALL REMAINDER OF FRAMING IN BASEMENT AND 'TALL DRYWALL. 2 DAILEY $41,794.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER --------------- 9, -73 CALVIN & LYNDA NEWELL 215 GARLAND STREET LOT 2 BLK 2 SUNSET ADDITION RECONSTRUCT EXISTING REAR DECK AND CONSTRUCT 120 SQ. FT. OF NEW DECK SELF $1,800.00 94-274 DI LORETO DEVELOPMENT 124 BUFFALO STAGE LOT 14 PLAN 6 BUFFALO STAGE ADDN CONSTRUCT A 2,398 SF TWO STORY SFR WITH A 593 SF TWO CAR ATTACHED GARAGE. LACHANCE BUILDERS $148,856.00 94-275 DI LORETO DEVELOPMENT 128 BUFFALO STAGE LOT 15 PLAN 5 BUFFALO STAGE ADDN CONSTRUCT A 2,054 SF SFR ON A CRAWL SPACE WITH A 656 SF TWO CAR ATTACHED GARAGE. LACHANCE BUILDERS $129,667.00 94.-.276 JELYN M. PISTORIUS 159 EAST COTTONWOOD DRIVE 2 BF IN S1/2 NE1/4 S4 T28N R21W SHEETROCK CEILING WITHIN BASEMENT AND INSTALL BEDROOM EGRESS WINDOW. SELF $3,000.00 94-277 BONNIE BULS 1518 8TH AVENUE EAST LOT 3 & 4 BLOCK 1 CONSTRUCT A 20' X 24' ADDITION TO EXISTING HOUSE AND REMODEL INTERIOR. TRIANGLE CONSTRUCTION $15,000.00 94-278 CHAD CLEMONS 2112 SOUTH WOODLAND DRIVE LOT 157 GREENACRES UNIT #4 CONSTRUCT A 1368 SF SFR ON A DAYLIGHT BASEMENT WITH A 624 SF TWO -CAR ATTACHED GARAGE. A. HARVEY & SONS BUILDERS $104,554.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER --------------- 9 _ -79 CARL CHRISTIANSEN 1204 3RD AVENUE WEST IT 1 BLK 219 ADD N3 CONSTRUCT A PERMANENT FOUNDATION UNDER EXISTING HOME. KINNIBURGH CONSTRUCTION $6,500.00 94-280 DOUG MILLER 2500 HIGHWAY 93 SOUTH T2 SW/SE 1/4 S 20 T28N R21W CONSTRUCT A SHELL ONLY 8000 SQ FT METAL BLDG ON A PERMANENT FOUNDATION. TREWEEK CONSTRUCTION $50,000.00 94-281 BETTY ISCH 16 EAST NICKLAUS AVENUE LT 14 GLACIER VILLAGE GREENS CONSTRUCT A 20X15 (300 SF) FAMILY ROOM ADDITION TO EXISTING RESIDENCE. CONSTRUCT A 7' X 10' UNFINISHED GARAGE STORAGE FOR GOLF CART, ATTACHED TO EXISTING RESIDENCE. ANDY HALL $18,500.00 82 126 A E. RESEREVE CONSTRUCT A RETAINER WALL IN THE BASEMENT TO PROTECT MECHANICAL EQUIPMENT. SELF $500.00 94-283 COLLINS MANAGEMENT 420 LIBERTY STREET CONSTRUCT A 20' X 20' PRIVATE STORAGE BUILDING SELF $3,800.00 94-284 DAVID AND JANET YONKERS 2034 SOUTH MEADOWS DRIVE LOT 8 SOUTH MEADOWS CONSTRUCT A 912 SF 2 BEDROOM SFR WITH A 732 SF UNFINISHED BASEMENT GREG BAIN AND CO. $61,586.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER 9, Z85 DAVE AND DORA BRADLEY 2058 SOUTH MEADOWS DRIVE LOT 2 SOUTH MEADOWS CONSTRUCT A 904 SF 2 BEDROOM SFR WITH A 904 SF FULL UNFINISHED BASEMENT GREG BAIN AND CO. $63,063.00 94-286 FAIRWAY BLVD PARTNERS 142 FAIRWAY BLVD LOT 61 FAIRWAY BLVD TOWNHOUSES PHASE VI CONSTRUCT A 1312 SF SINGLE STORY SFR ON A CRAWL SPACE W/A 484 SF 2 CAR ATTACHED GARAGE. RJS DEVELOPMENT $83,775.00 94-287 FAIRWAY BLVD. PARTNERS 143 FAIRWAY BLVD. TOWNHOUSE PHSE VI LOT 62 CONSTRUCT A 2196 SF TWO STORY TOWNHOUSE ON A CRAWL SPACE W/A 484 SF 2 CAR ATTACHED GARAGE. RJS DEVELOPMENT $135,454.00 94-288 OF KALISPELL 15 DEPOT LOOP TR 2AA IN SE4SE4 S7 T28 R21 CONSTRUCT A 26' X 19' 6" PUBLIC RESTROOM ON A PERMANENT FOUNDATION. NATIVE WAY INC. $60,000.00 94-289 LURE D. CHAPMAN 1972 DUNMOVIN LOT 207 SOUTH MEADOWS CONSTRUCT A FOUNDATION FOR A DOUBLE WIDE MODULAR HOME. PACIFIC LAND DEVELOPMENT INC. $7,000.00 94-290 FISH, WILDLIFE & PARKS 490 NORTH MERIDIAN ROAD S 12 T 28N R 22 W FISH & GAME ADD INSTALL 1X4 STRIPS WITH NEW PLYWOOD UNDERLAYMENT AND INSTALL NEW METAL ROOF. MIKE USROSKI $4,800.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER 9. �91 NORTHWEST INVESTMENTS PARTNERSHIP 1011 HIGHWAY 2 WEST LOT 1 BLOCK 1 LEWIS & CLARK ADDITION CONSTRUCT 8'X20' EQUIPMENT SHELTER ON A 14' X 23' CONCRETE EQUIPMENT PAD. CAL -WEST ELECTRIC LTD $40,000.00 94-292 IVAN O'NEAL 501, 503, 505, 507, 509 BIRCHWOOD COURT SEC 17 T28N R21W TRACT 2 CONSTRUCT FOUNDATION ONLY FOR A 5 UNIT APARTMENT BUILDING. DENMAN CONSTRUCTION $10,000.00 94-293 IVAN O'NEAL 701, 703,705, 707, 709 BIRCHWOOD COURT SEC 17 T28N R21W TR2 CONSTRUCT A 5 UNIT APARTMENT BUILDING; ONE AND TWO STORY UNITS, ON A CRAWL SPACE. DENMAN CONSTRUCTION $310,711.00 94.-294 COMMUNICATIONS 333 1ST AVENUE EAST LOTS 16 & 17 BLOCK 64 KALISPELL ORIGINAL CONSTRUCT A 25' X 40' STRUCTURE FOR EQUIPMENT STORAGE. ROBERT ROSS CONSTRUCTION $40,000.00 94-295 WILLIAM J. SKRANAK 1502 5TH AVENUE EAST SEC 17 T28 R26 BECKERS ADDITION REMODEL INTERIOR, KITCHEN & BATHROOM; INSTALL BAY WINDOWS. SELF $15,000.00 94-296 AMERICAN LAND & DEVELOPMENT, INC. 102 MALLARD DRIVE TR 70G MEADOWPARK NE4 20 28 21 CONSTRUCT A 1,407 SF SFR WITH A 572 SF ATTACHED TWO CAR GARAGE. AMERICAN LAND & DEVELOPMENT, INC. $90,615.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER 9, -97 JOE WAGNER 523 COUNTRY WAY EAST LOT 35 COUNTRY VILLAGE 2 CONSTRUCT A 1,770 SF SFR ON A CRAWL SPACE WITH A 576 SF TWO -CAR ATTACHED GARAGE. HUGH HOUSTON CONSTRUCTION $111,895.00 94-298 MINUTE MAN BUILDERS 1507 FIRST AVENUE WEST BLOCK 1, LOT 14 & 15 CONSTRUCT A 2,906 SF TWO STORY OFFICE STRUCTURE. MINUTE MAN BUILDERS $114,429.00 94-299 MABLE HOFFMAN 300 SUMMIT RIDGE DRIVE LT 18 ELK 2 SUMMIT RIDGE #1 CONSTRUCT A 12' X 18` DECK TO THE REAR OF THE HOUSE LEE TRESLER $1,500.00 94-300 FCITY OF KALISPELL € AIRPORT ROAD TRACT 1G S19 T28N R21W CONSTRUCT A 10,291 SF WOOD FRAMED, TWO STORY 10 UNIT APARTMENT BUILDING. SWANK ENTERPRISES $411,331.00 94-301 CITY OF KALISPELL 1842 AIRPORT ROAD TRACT 1G S19 T28N R21W CONSTRUCT A 7,199 SF TWO STORY WOOD FRAMED 6 UNIT APARTMENT BUILDING. SWANK ENTERPRISES $287,744.00 94-302 CITY OF KALISPELL 1842 AIRPORT ROAD TRACT 1G S19 T28N R21W CONSTRUCT A 7,518 SF TWO STORY WOOD FRAMED 8 UNIT APARTMENT BUILDING. SWANK ENTERPRISES $300,474.00 94-303 PETER FENNELLY 1903 GARDEN WAY „1' 174 SOUTH MEADOWS .STRUCT A 1,288 SF ONE STORY SFR ON A CRAWL SPACE, WITH A 400 SF ATTACHED GARAGE ON A PERMANENT FOUNDATION. PETER FENNELLY $81,144.00 BUILDING PERMIT LIST FROM 06/01/94 TO 06/30/94 PERMIT NUMBER 94 04 GEORGE R. HERBEL 1944 DARLINGTON LT 159, SOUTH MEADOWS CONSTRUCT A 24' X 26' PRIVATE DETACHED GARAGE ON A MONO -SLAB AND A 7' X 18' DECK. 18' DECK WALT AYERS $6,850.00 94-306 GOLD RUSH PAWN 1353 HIGHWAY 2 EAST BLK 9DCD SE1/4 OF SW1/4 S4 T28N R21W CONSTRUCT A FOUNDATION ONLY FOR A 25' X 100' ADDITION TO FRONT OF EXISTING STRUCTURE. CALAWAY CONSTRUCTION $6,320.00 94-307 EVERGREEN ALLIANCE CHURCH 315 EAST EVERGREEN DRIVE LOT 10A TRACT HOILAND DAY ACRES AMEND LOTS 9, 10 CONSTRUCT A CRAWL SPACE FDN FOR A 2,000 SFR TO BE MOVE ONTO. SELF $3,600.00 08 IVAN O'NEAL 1706 5TH AVENUE EAST CONSTRUCT GARAGE #3: 22' X 60' PRIVATE DETACHED GARAGE ON A PERMANENT FOUNDATION. DENMAN CONSTRUCTION $19,200.00 94-309 CHRIS & PAM PARMENTER 311 HARRISON BOULEVARD LOT 55 PARKVIEW TERRACE ADDITION #1 CONSTRUCT A 40' X 8' DECK SELF $2,400.00 TOTALS: $4,114,059.00 Telephone (406) 752-6600 FAX (406) 752-6639 Post Office Box 1997 Zip 59903-1997 0 CI1 a I� Incorporated 1892 August 1, 1994 S P E C I A L M E E T I N G N O T I C E TO THE HONORABLE BOARD OF COUNCILMEMBERS CITY OF KALISPELL, MONTANA COUNCIL MEMBERS: There will be a Special Meeting of the City Council, Thursday, August 4, 1994 at 11:00 a.m. in the Council Chambers at City Hall for the following purpose: FIX ANNUAL APPROPRIATIONS FY 1994-95 BUDGET Awl / ,�. vyl 10 , ATTEST: M'�l ..�.`� 1r 'k- of Council Debbie — -- -- N --- 0- - Douglas Rauthe Mayor Bruce Williams City Manager City Council Members: Gary W. Nystul Ward I Cliff Collins Ward I Barbara Moses Ward II Dale Haarr Ward It Jim Atkinson Ward III Lauren Granmo Ward III Pamela B. Kennedy Ward IV M. Duane Larson Ward IV