11b. Sidewalks and CurbingJuly 5, 1994 TO: Bruce Williams, City Manager FROM: Robert H. Babb, City Engineer Fred Zavodny, Project Manager SUBJ: 1994 CURBING AND SIDEWALK BID ANALYSIS AND RECOM1VlENDATION Bids were received from Marriott Concrete, NUPAC, and Sandon Construction. All bids were in order and contained the required bonding. This contract is intended primarily for residents and businesses wishing to take advantage of the annual curbing and sidewalk program. The major components of the bid are as follows: BID ITEM UNIT SANDON NUPAC MARRIOTT 4" Sidewalk S.F. $ 2.86 $ 2.95 $ 3.00 6" Sidewalk S.F. $ 2.95 $ 3.00 $ 3.00 Curb and Gutter L.F. $ 7.60 $ 9.00 $ 9.00 Straight Curb L.F. $ 8.00 $ 9.00 $ 9.00 The Public Works Department recommends the bid be awarded to Sandon Construction.