08. Avenue of the Arts Concept - Lutz Contract110 (11y 0i Kalispell Incorporated 1892 t Planning, Economic & Community Development Department P.O. Box 1997 Kalispell, MT 59903-1997 ti's ♦ F77401011 Date: June 1, 1994 To: Bruce Williams, City Manager From: Ross Plambeck, Redevelopment Manager 19 Subject: Which Way Kalispell/Contract with Bruce Lutz 248 Third Avenue East (406) 752- 7491 (406) 755-8017 (office fax) (406) 752-6639 (City Nall fax) On May 3, 1994, the KDC Executive Board took the following action: Gordon Pirrie moved the Board recommend to City Council to proceed with the Bruce Lutz street design from First Avenue West to Third Avenue East, making First Streets East and West one-way with diagonal parking, and tying it in with Norwest's expansion project and the Second Avenue East 'Avenue of the Arts' design. Paul Wachholz seconded, motion passed unanimously. At the May 23 City Council Workshop, Bruce Lutz presented an overview of the two projects and the scope of services. Speaking in favor of the project included Hank Good, Steve Olson, Ivan O'Neil, Gordon Pirrie, and Nick Haren. Attached are the two separate proposals from Bruce Lutz for the design, surveying, bid documents and construction oversight for these Which Way Kalispell projects: First Streets East & West from 1st Ave. W. to 3rd Ave E. $9,650 does not include engineering if utilities need replacing) 2nd Ave E. (Avenue of the Arts) 2nd St. to 3rd St. $4,460 does includes the engineering to replace the water main) The award of the design contracts will provide specific design detail and cost estimates for the Council's decision to go out to bid. The project would be funded with tax increment funds and has been included in the proposed '95 budget. Recommendation: To award the two design contracts to Bruce Lutz. This will provide the opportunity to meet this construction season's time frame and cooperate with the Norwest Bank Drive-thru expansion project. wwx/Lutz .0llL:fh'.y^p. 0?F0RT'Al 1. 18 Sitescape Box 1417 Columbia Falls Montana 59912 Assoc) ate S Phone: 406-892-3492 Fax: 406-892-0330 grace F Lutz, Landscape P.rctut�t Project: Avenue of the Arts / Second Avenue E. Streetscape Design To: Kalispell Community Planning and Economic Development, Attention : Ross Date: April 18,1994 It is my pleasure to make the following design fee proposal for site design drawings and construction documents for the Second Avenue Streetscape Project. Sitescape will provide the following services for the fees indicated. Sitescape Associates will provide the following services for the followings fees: 1) Site Development Charrette & Schematic Plan: - including scaled streetscape plan and brownline color rendered version for presentation. Lump Sum Fee: 2) As -built Site Survey: Lump Sum Fee: $600.00 Deadlinemot later than 4 /29/94 $800.00 Deadline: not later than 4/26/94 3) Water Main Renovation Design Lump Sum Fee: $1600.00 2) Streetscape Design Constrution Documents: Lump Sum Fee: $900.00 Deadline: Not Later than 6/8/94 3) Bid Coordination: Hourly : not to exceed: $360.00 Bid Date: June 22,1994 W. 4) Reimbursables: Printing and presentations: not to eceed $200 Total Fee: $4460.00 Thank you for this opportunity. I look forward to working with you on this project. Please let me know if you have any questions. Sincerely, r6'" --� �� Bruce F. Lutz, A. .. Landscape Architect an and Planner itescape Box 1417 Columbia Falls Montana 59912 Associates Phone: 406-892-3492 Fax: 406-892-0330 ndscape Architect ,Bruce F. Lutz. La Subject: Design and Construction Documentation Proposal Project: First Street Streetscape Project For: The City of Kalispell To: Ross Plambeck, Kalispell Planning and Economic Development Office Date: May 9, 1994 It is our pleasure to make the following proposal to provide the City of Kalispell with a design and construction documents for the First Street Streetscape Project. It is understood that this project will encompass the current Alternative 3a site area as well as the 1st Street right of way between 1st Avenue East and 3rd Avenue East (Linderman School). It is understood that Sitescape Associates and its consultants will provide the following services for the followings fees: 1) Plan refinement, coordination and presentation with adjacent landowners: Lump Sum not to exceed: $450.00 2) Site Topographic Survey: Lump Sum Fee: $1500.00 (Smith Surveying) 3) Comprehensive Streetscape Plan including submittal of a design for approval by the City and: a) Field work and Demolition Plan, a) Streetscape & Parking Lot Layout Plans w/ construction dimensioning, b) Grading and Drainage Plan w/ drainage calculations, c) Landscape Plan w/ plant list and detailing d) Hardscape Plan w/ Site Construction Details e) Lighting Plan e) Construction Specifications Lump Sum Fee: $6000.00 4) Bidding and Construction Observation: a) Printing ..........reimbursable b) Bidding Coordination ..........not to exceed S500.00 c) Construction Observation ..........not to exceed S1200.00 Total Fee: not to exceed $9,650.00 Your signature below constitutes an agreement by the City of Kalispell authorizing Sitescape Associates to perform work items as described on page 1 of this document. Construction documentation and bidding shall be completed so that the project may begin no later than September 15, 1994. Fees will be billable based on the percentage of work completed during the course of a month and will be due within 30 days of our billing. A signed copy of this document returned to our office will serve as authorization for us to begin work. Thank you for your attention and consideration. Bruce F. Lutz, A.SL . Owner, Sitescape Associates Landscape Architect and Land Planner Bruce Williams City Manager City of Kalispell