Staff ReportsPUBLIC WORKS DEPARTMENT ACTIVITY REPORT APRIL 1994 A. OFFICE, REPORTS, BUDGETS. REQUESTS & COMPLAINTS. -Designed computerized spreadsheets for preliminary budget requests. -Completed fourteen preliminary budget requests - submitted to Manager 4-15-94. -Completed several water rate structure scenarios, formatted spreadsheets for presentation, water rate study report in progress. -Continue to monitor budget expenditures and water related parts inventory usage. Coded, verified and approved all purchases. -Continue correspondence, file, work order index updates. -Continue to enter job cost data into computer. B. SUPERVISION, PERSONNEL & SAFETY. -PW Secretary resigned 4-26-94; temporary secretary, Jan Grimes' last day 4-29-94. -Hired two labor contractors for patching. -Safety meeting held on hazardous materials and data sheets. -Attended GIS workshop and seminars (local). -Attended school for pump and motor maintenance in Thompson Falls. -Attended Tymco sweeper service school. C. CENTRAL GARAGE. (Jim Snell) -123 repair orders were completed during the month of April. -Police 25 -Parks 15 -WT/WW/SW 09 -Street 41 -Garbage 14 -Fire 10 -PW/BD/CD/TSS 09 -Required John Deere loader and replaced alternator. ENGINEERING A. DESIGN SURVEY ESTIMATES RFP INSPECTION & PROJECTS. -6th Ave. W.N./Railroad St. and Sykes III project bid to be opened May 13. -Continue to monitor construction on the South Meadows utility and street project. -Conducted two PTI Communications project reviews. A. DESIGN SURVEY ESTIMATES RFP INSPECTION & PROJECTS. (cont) -Continued accumulation and processing of data for city map. -Revised design and field survey for 18th St. E. -Continue public right-of-way inspections. -1994 Overlay Project awarded to Nupac. Working with city crews to facilitate site prep work. -Estimate for 1995 overlay and chip seal projects completed. -Infrastructure inspections for Greenbriar, Meadow Park, and Alpine Auction developments ongoing. -Attended pre -construction meeting for TCI Cable's planned summer construction. TCI plans to replace all existing cable. -New dump truck and sewer rodder truck expected to arrive on or about May 1, 1994. -Worked with T D & H regarding Meridian Pointe connection to upper service zone. -Completed utility plan review on Glacier Village Green Phases V & VI, Rinke 5th Ave. E. Sewer Extension, Kelly 7th Ave. W. utility extensions - projects in progress. -Negotiated with FVCC for easement for new well site. Easement authorized by FVCC Board. Hydrogeological studies and preliminary engineering report are underway. -Negotiated contract for South Woodland Facility Plan/Seven Acre Site development contract. -Preparation of Dept. of Natural Resources Grant and Loan application in progress. Seeking funds for north side water well and S. Woodland water extension projects. -Worked with Architects to resolve problem of City Hall roof drainage into sanitary sewer system. -Site Review: Liberty Village Lot 2 Six-plex, new subdivision street sign installation, Development proposal for Knoll's Addition, Meridian Pointe, Bethel Baptist Church, Valley Glass, Norwest Bank drive-in bank, Sportsman Ski Haus parking, Valcon site improvements, Checker Auto, Ernst, Wall Mart, Shopko, and Blockbuster Video. OPERATIONS AND MAINTENANCE A. WATER PUMPING STORAGE DISTRIBUTION. (Ben Van Dyke) -Continued maintenance of all pumps, motors, reservoirs, grounds and controls for the water supply system. -Produced 59,900,000 gallons of water, 11,900,000 gallons in the upper zone and 48,000,000 gallons in the lower zone. -Injected 53 pounds of chlorine at Lawrence Park pump station. -Completed water sampling for Trihalomethane, Lead and Copper. -Assisted field crews on several water main, hydrant and valve repairs. -Began grounds maintenance, mowing grass, etc. B. SEWER FACILITIES LIFT STATIONS COLLECTION. ( Vic Schroeder) -Weekly general maintenance continues at fourteen lift stations. -Video and jet cleaning operations continue. B. SEWER FACILITIES LIFT STATIONS COLLECTION. (cont) -Cleaning leaves from storm inlets. -Installed flow meter in sewer line. -Pumped septic tank in Lawrence Park. -Dug test holes on Airport Road. -Installed 34' of 8" storm line on 5th St. W. and 6th Ave. W. C. WASTEWATER TREATMENT PLANT. (Joanne Emrick) -Installed new heat pump in Digester Building. -Repaired two gas boilers in Digester Building. -Worked on repairing primary clarifier drive units so they function properly. This unit did not separate as designed; as a result, clarifier links broke, causing extensive repairs and down time. -Drains in lift station plugged with grease and large grease balls in well area beneath lift station. Grease balls were pumped out by the Sewer Department. The drain pipes were shortened to prevent high water underneath the lift station from filling the pipes with grease. -Gravity thickener set off torque alarm. Drained unit down and found various metal pieces from bolt and nut corrosion. Presently rebuilding this unit. -Working on various projects to complete work not done during construction. -Center spray mechanism in the secondary clarifier not functioning. Working on problem determination. -Hauled 270 tons of sludge averaging 17.6% solids to the facility in Olney. High number of tons is mostly due to gravity thickener down time. -There were no discharge permit violations for April. -Work orders are mostly incomplete because of the large volume of repairs listed above. D. SOLID WASTE COLLECTION/DISPOSAL (Jack Fournier) ALLEY CLEAN UP. -Weekly garbage service continues. -Alley clean up continues. -Responded to sixteen solid waste violations. -Repaired two 300 gallon and two 400 gallon containers. -Delivered three 90 gallon, and three 300 gallon containers to new customers. -Began assembly on ROTO 100 gallon containers. CONSTRUCTION AND MAINTENANCE A. STREETS CURBS GUTTERS ALLEYS. (Leonard Hogan) -Street sweeping and flushing ongoing. -Grading and dust coating alleys. -Continue to patch and pick up loose chunks of asphalt. -Stripped 9th Ave. W. from 2nd St. to 8th St. and prepared for paving. A. STREETS CURBS GUTTERS ALLEYS. (cont) -Reconstructed 18th St. E. between 3rd Ave. E. and 5th Ave. E. -Assisted WWTP with driver hauling sludge to Olney. -Assisted Water Division with truck. -Assisted Sewer Division on 5th St. W. -Reconstructed intersections on 6th St. W. at 8th Ave., 9th Ave., and loth Ave. - removed culverts and added flow lines. -Paved 90' on 7th St. W., and 52' on loth St. E. -Prepared one alley for paving. B. WATER CONSTRUCTION AND SYSTEM REPAIR. (Randy Vickhammer) -Work order and complaint resolution continues. -Tagged delinquent accounts. -Meter repair and replacement ongoing. -Replaced seven fire hydrants. -Repaired one fire hydrant. -Relocated one fire hydrant. -Repaired six valve boxes. -Repaired three valves. -Replaced four curb boxes. -Repaired four curb stops. -Installed a new 6" x 3/4" service to Heritage Park. -Relocated two 3/4" service lines. -Assisted Street Division on 9th Ave. W. -Changed out meter at Red Lion. -Conducted line locates. C. SIGNALS SIGNS STRIPING SERVICES. (Jerry Diegel) -Continued general maintenance on traffic signals, signs, meters, decorative lights, alley lights, special lighting, airport runway lights, barricading, banners and sight obstructions. -Hired contractor to install banners. -Replaced ten stolen signs. -95 % complete - striping city streets in coordination with MDOT. -Met with Shopko representatives to discuss upcoming changes in the intersection of Hwy 2 E & Hwy 35. -Completed preliminary investigation of loop replacement at Idaho and 5th Ave. W.N. and Center and 1st Ave. W. -Replacing sign bases which failed during winter months. -Rebuilding airless sprayer for spring painting - new pump bushings, seals, tip and holders. -Started painting crosswalks. ss The City of Kalispell Incorporated 1892 '>iephone (406)752-6600 Building Department ex: (406)755-8017 Craig A. Kerzman 248 3rd Ave E, PO Box 1997 Building Official Zip 59901 Brian J. Wood DEPARTMENT OF BUILDING & ZONING zoning Administrator Dwain Elkins MEMORANDUM Buiidino Inspector Richard "Dick" Fura Buiidino Inspector TO: CITY MANAGER BRUCE WILLIAMS, MAYOR DOUGLAS RAUTHE & CITY COUNCIL FROM: CRAIG KERZMAN, BUILDING OFFICIAL DATE: March 31, 1994 RE: PERMIT REPORT PERM MAR 1994 FEES RECEIVED MAR 1994 PERMITS JANUARY TO DATE FEES REC JANUARY TO DATE PERMITS FISCAL YEAR FEES REC FISCAL YR TO DATE BUILDING 61 30,555 102 38,729 390 125,022 PLAN REVIEW 25 14,327 43 16,868 156 48,828 PLUMBING 29 2,029 64 4,270 213 18,477 MECHANICAL 26 1,624 95 7,189 403 23,102 MOVING 1 100 3 200 10 751 EXCAVATION 0 0 0 0 2 0 TOTALS: 142 48,635 307 67,256 1,174 216,180 BUILDING VALUATION MAR 1994 JAN TO DATE FISCAL YR TO DATE CITY 1,358,925 1,932,195 11, 741,147 COUNTY 5,620,175 6,140,511 10,300,306 TOTAL 6,979,100 8,072,706 22,041,453 SEWER CAPITOL IMPROVEMENT FUND 5,000 6,500 77,250 WATER CONNECTION FEE 336 784 15,1 33 BOARD OF ADJUSTMENT FEE 50 575 1, 975 CAKIak iminz tos -me 11:9 -lephone (406)752-6600 ,c: (406)755-8017 248 3rd Ave E, PO Box 1997 Zip 59901 Incorporated 1892 SEWER & WATER REPORT CONNECTION FEES PAID MARCH 31, 1 994 Building Department Craig A. Kerzman Building Official Brian J. Wood Zoning Administrator Dwain Elkins Building Inspector Richard "Dick" Fura Building Inspector Name/Address Sewer Water HORIZON HOMES 2177 S WOODLAND DR 625.00 AMERICAN LAND DEV 107 MALLARD DRIVE 500.00 112.00 MARKJOHNSON 1926 CAMELOT 500.00 112.00 WILLIAM R PFLIGER 107 Northern Lights 500.00 GORDON JOHNSON 504 SYLVAN DRIVE 500.00 ALPINE BUSINESS CTR 160 KELLY ROAD 625.00 ALPINE BUSINESS CTR 180 KELLY ROAD 625.00 LARRY GLOVER 288 5TH AVE WN 500.00 112.00 DOROTHY WORKMAN 1704 STAG LANE 625.00 TOTALS $5,000.00 $336.00 DEPARTMENT OF BUILDING & ZONING COMMENTS FOR END OF THE MONTH REPORT March 31, 1994 Building Activity Permits were issued for about a dozen single family homes in March. While spring start-up in residential construction was healthy, it was overshadowed by commercial construction. Ernst Hardware will be completed in April. Plum Creek started some major projects and Shopko started it's new store. Zoning Activity The Zoning Administrator, in addition to regularly attending Site Review Committee, City Council and Planning Board Meetings, also attended a seminar hosted by PTI concerning communications capabilities and their application to planning activities. Karl Christians, Montana State Floodplain Coordinator, met with the zoning administrator to get an update on the city's floodplain development in 1993. Violation investigation and prosecution continues, as the office tries to keep up with abandoned signs and signs without permits. As has been the case the last several months, considerable time was spent on the Evergreen area annexation process. Board of Adiustment At their March meeting, the Board of Adjustment heard three requests for variances, one of which was granted. Neil Deering was granted a variance to construct a new industrial building within a required yard setback. Requests by Roger Reimann and Paul Voorhees for lot area and setback variances, respectively, were denied. No applications were received for the April Board of Adjustment meeting. Personnel Dick Fura completed his gas codes training class. Dwain requested to fill the Plans Examiner position and was moved to that position on March 21, 1994. Applications have been received and are being processed to fill the vacant building inspector position. Craig keniman, Building Official CAK/ak BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER --------------- ( 3 MIIQ's DAILEY 1001 SOUTH MAIN STREET LOT 21, 22,23,24 BLR 133 KALISPELL ORIGINAL CONSTRUCT BASEMENT ONLY MIRE DAILEY $18,500.00 94-44 Horzion Homes 2177 SOUTH WOODLAND DR. LOT 148 GREEN ACRES UNIT #4 Construct a new 46' x 26' SFR on a crawl spacce with a 2 car attached garage HORIZOR HOMES $80,000.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER --------------- 94-45 TAN ARLINT 355 MEADOW HILLS DRIVE LOT 6 & 7 CONSTRUCT A 26' X 26' SF GARAGE ON A PERMANENT FOUNDATION. ELKHORN CONST $20,000.00 94-46 GLACIER WHOLESALER INC 16 WEST RESERVE DRIVE SEC 33 T 29N R21W GLACIER FRONT LOT A-1 CONSTRUCT AN 80'X 55' ADDITION TO THE REAR OF.THE EXISTING BUILDING TREWEEK CONSTRUCTION $318,225.00 94-47 MYRON SHERMAN 1601 8TH AVE EAST LOT NORTH OF 1603 8TH AVE EAST CONSTRUCT A 47' X 38' SF HOME WITH A 20' X 21' ATTACHED GARAGE, 2 STORIES PLUS BASEMENT irL. _LEY BLOSSER 809 1ST AVE EAST INTERIOR REMODEL 94-49 DAVID JAUMOTTE 146 SHERRY LANE CONSTRUCT A 12' X 24' GARAGE ATTACHED TO EXISTING 12' X 24' GARAGE 94-50 SHANE CORPRON 89 PARK STREET SW 1/4 S 5 T23N R 21 W CONSTRUCT A 10' X 32' ADDITION TO EXISTING MOBILE HOME $135,427.00 $7,500.00 $4,800.00 $3,000.00 94-51 MARISE JOHNSON 643 LEISURE DRIVE SHrr,'TROCK EXISTING GARAGE AND BASEMENT AREA KARL ADACKER $1,200.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER 94-52 PLUMB CREEK 75 SUNSET DRIVE NW4 SW4 TRACT 3B, 533, T29, R21 INSTALL NEW POST AND PIER AT EXISTING REMANUFACTURING PLANT AT PLUM CREEK SITE NORTHWEST BLDG SYSTEMS $600,000.00 94-53 BOBBY WARREN 1138 3RD AVENUE WEST LT 6 BLK 146 KAL ORIG CONSTRUCT A PARTIAL FOUNDATION UNDER EXISTING HOUSE. SELF $1,364.00 94-54 NEIL DEERING 710 WEST MONTANA STREET LOT 1 BLOCK 155 KALISPELL ADDITION NO. 1 CONSTRUCT A 30' X 50' DETACHED GARAGE ON A FULL FOUNDATION. WALT AYERS $25,000.00 , 5 Bis MOUNTAIN TOYOTA 1331 HIGHWAY 2 EAST TRACT 1,2,3,4,5,6,7 S4 T28N R21W CONSTRUCT INTERIOR PARTITIONS; REMOVE COUNTERS SELF $10,000.00 94-56 AMERICAN LAND & DEVELOPMENT 107 MALLARD DRIVE TR 70G NE4 20 28 21 CONSTRUCT A 1,407 SF SINGLE STORY RESIDENCE WITH ATTACHED 21' X 20' 2 CAR GARAG A CRAWL SPACE SELF $88,393.00 94-57 Lavert Elkins 392 PONDEROSA DRIVE LOT 22 BUFFALO HEAD ADD #92 create opening in wall to install new breakfast counter SELF $1,000.00 94-58 Shopko Stores Inc. 1370 HIGHWAY 2 EAST 4 T28N R21W construct a foundation only for a 99279 square foot retail store MARTEL CONSTRUCTION $60,000.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER --------------- 94-59 GESN PARTNERSHIP 120 BING COURT IT 4A CONSTRUCT A 1269 SF TOWNHOUSE ON A CRAWL SPACE WITH A TWO CAR ATTACHED GARAGE. J & F CONSTRUCTION $71,085.00 94-60 GESN PARTNERSHIP 122 BING COURT IT 4B CONSTRUCT A NEW 1450 SF TOWNHOUSE ON A CRAWL .SPACE WITH A TWO CAR ATTACHED GARAGE. J & F CONSTRUCTION $81,667.00 94-61 GESN PARTNERSHIP 124 BING COURT IT 4C CONSTRUCT A NEW 1444 SF TOWNHOUSE ON A CRAWL SPACE WITH A TWO CAR ATTACHED GARAGE. J & F CONSTRUCTION $81,316.00 9,... ,2 PARTNERSHIP 126 BING COURT IT 4D CONSTRUCT A NEW 1444 SF TOWNHOUSE ON A CRAWL SPACE WITH A TWO CAR ATTACHED GARAGE. J & F CONSTRUCTION $81,316.00 94-63 GESN PARTNERSHIP 128 BING COURT IT 4E CONSTRUCT A NEW 1444 SF TOWNHOUSE ON A CRAWL SPACE WITH A TWO CAR ATTACHED GARAGE. J & F CONSTRUCTION $81,316.00 94-64 GESN PARTNERSHIP 128 BING COURT IT 4E CONSTRUCT A NEW 1444 SF TOWNHOUSE ON A CRAWL SPACE WITH A TWO CAR ATTACHED GARAGE. J & F CONSTRUCTION $81,316.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER 94-65 ERNESTINE ANDERSON 386 PONDEROSA STREET LT21 BLK 8 BUFFALO HEAD CONSTRUCT A 8' X 25' COVER FOR EXISTING DECK COLEMAN CONSTRUCTION $2,000.00 94-66 17 Company L.C.C. 17 FIRST AVENUE EAST LOT 12,13,14,15 BLK 57 KO Construct a 1900 square foot addition to existing structure and remodel interior to create two office spaces SWANK ENT. $195,000.00 94-67 RALPH WISHER 2025 HIGHWAY 2 EAST 4MBB TR4 MB TR4V TR4 S4 T28 R21 FOUNDATION ONLY PERMIT FOR CAR WASHING & WAXING FACILITY. SELF $5,200.00 ,8 e�'lyn L. Rose 37 WEST EVERGREEN DRIVE SEC.33 T29N R21W Construct a foundation for a 28' x60' modular home EVERGREEN CONSTRUCTION $6,000.00 94-69 FRANK TETRAULT 709 1ST AVENUE EAST LT 15 & 16 ELK 104 KAL ORIG CONSTRUCT A 22' X 28' SF PRIVATE DETACHED GARAGE ON A MONOLITHIC SLAB. DOUG MASH CONSTRUCTION $5,850.00 94-70 CORA GIESE 533 SECOND STREET WEST LOT 7 BLOCK 160 REBUILD DAMAGE FROM FIRE SELF $2,300.00 94-71 ERNST HOME CENTER 1441 HWY 35 EAST REMODEL EXISTING PARIDA RETAIL STORE AND ADD 18,350 SF TO CREATE ERNST HOME CENTER. CUSTOM REMODELING $60,000.00 BUILDING PERMIT LIST ,FROM 03/01/94 TO 03/31/94 PERMIT NUMBER 94-72 HOLLISTER LARSON FIRST AND MAIN LOT 23 AND 24 ADDN 45 KALISPELL ORIGINAL TOWNSITE ALTER EXISTING RESTROOM TO MAKE IT HANDICAPPED ACCESSIBLE. SELF $500.00 94-73 J.B. LOVE 237 MAIN STREET CONSTRUCT A 12X20' ADDITION TO EXISTING DECK -OVER EXISTING ROOF AREA FOR USE BY SECOND STORE APARTMENT BUILDING. SELF $1,000.00 94-74 CLARENCE COUNSELL 1425 8TH AVENUE EAST TR5 8NW4SE 4 CONSTRUCT A 6' X 10' ADDITION TO EXISTING HOUSE SELF $1,000.00 '" 75 0S SALOON 173 NORTH MAIN STREET construct a 4 foot framed wall BIANCHI CONSTRUCTION 94-76 MIKE DAILEY 1001 SOUTH MAIN STREET LOT 21, 22,23,24 BLK 133 KALISPELL ORIGINAL CONSTRUCT A 72'-0" X 64'-0" OFFICE SPACE WITH FULL BASEMENT. $400.00 SELF $202,500.00 94-77 KALISPELL CORP CENTER 1325 HIGHWAY 2 WEST GIBSON ADD #41 CONVERT EXISTING RESTROOM TO HANDICAPPED RESTROOM HAMMER CONSTRUCTION $1,550.00 94-78 VIRGIL WALTERS 119 PALMER DRIVE LOT 126 GLACIER VILLAGE GREENS PHASE III �TRUCT A 2,100 SF SFR ON A FULL BASEMENT WITH A 565 SF DOUBLE CAR GARAGE 01, A CRAWL SPACE DOUG NASH CONSTRUCTION $154,756.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER 94-79 RALPH WISHER 2025 HIGHWAY 2 EAST 4MBB TR4 MB TR4V TR4 S4 T28 R21 CONSTRUCT A 60' X 130' BUILLDING SHELL ON SLAB SELF $161,709.00 94-80 KAREN CHRISTIANSEN 85 PARK LANE CONSTRUCT A 14' X 19' CARPORT ATTACHED TO THE HOUSE WITH TUBES 42" IN GROUND STANLEY ROSS $2,500.00 94-81 BOB LILIENTHAL 1832 AIRPORT ROAD NE 1/4 OF NE 1/4 S19 T28 R21W BROWNS ADD CONSTRUCT THREE CARPORTS; A & B 2410" X 6210" (1,488 SF) & C 2610" X 60'0" (1,560 SF) SELF $34,020.00 94-82 D TORGERSON/SVB GROUP 2iv SOUTH MAIN STREET APT 5 SHEETROCK CEILING AREA TO REPAIR WATER DAMAGE; REPLACE DRYWALL SELF $400.00 94-83 Shopko Stores Inc. 1370 HIGHWAY 2 EAST SEC 4 T28N R21W CONSTRUCT A 335.33 X 286.33 SQ FT BUILDING MARTEL CONSTRUCTION $3,385,882.00 94-84 OLE'S COUNTRY STORE 2490 HIGHWAY 93 3EB NW1/4 NW1/4 S31 T29 R21 REMOVE INTERIOR WALLS IN EXISTING CONVENIENCE STORE MARTIN SERVICES $20,000.00 94-85 LUCY SORENSEN 119 WEST NICKLAUS LATE AND SHEETROCK EXISTING ATTACHED GARAGE LINDEN CONTRACTING $893.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER --------------- 94-86 BENJAMIN & ANNE TAYLOR 539 KELLY ROAD LOT 111 GREENACRES WEST UNIT 3 CONSTRUCT A 10' X 14' ADDITION TO SFR ON A DAYLIGHT BASEMENT. WALT AYERS $6,463.00 94-87 WILLIAM LUDWIG 594 4TH AVENUE W.N. CONSTRUCT A DECK ON THE EAST AND NORTH SIDES OF THE EXISTING RESIDENCE SELF $2,394.00 94-88 PLUMB CREEK 75 SUNSET DRIVE NW4 SW4 TRACT 3B, 533, T29, R21 construct a new 50' x 80' shop on a permanet foundation PLUM CREEK $92,272.00 99 ;PHEAD BEVERAGE 1380 HIGHWAY 2 WEST NW4 NE4 S13 T28N R22W REMODEL INTERIOR OF EXISTING OFFICE/WAREHOUSE BUILDING MARC JOHNSON $68,900.00 94-90 DAVE DEDA 27 MEADOW LARK DRIVE 7AM13 SEC 33 T29 R21 CONSTRUCT NEW BATHROOM AND ENLARGE MASTER BEDROOM IN SFR SELF $6,000.00 94-91 MARK JOHNSON 1926 CAMELOT LOT 95 SOUTH MEADOWS PHASE II CONSTRUCT A 26' X 42' FOUNDATION ON A CRAWL SPACE FOR A MODULAR HOME SELF $4,300.00 BUILDING PERMIT LIST FROM 03/01/94 TO 03/31/94 PERMIT NUMBER 9 .9 GRANT SORLIE 143 ZIMMERMAN ROAD IT 47 SE 1/4 SS T28N R21W ZIMWALD SUB CONSTRUCT A 24' X 241 DETACHED GARAGE ON A MONOLITHIC SLAB SELF $5,000.00 94-100 Harry & Mae Campbell 88 NORTHERN LIGHTS BLVD LOT 5, BLOCK 2 OLSON ADDITION DEVELOPMENT Construct a 3 Bedroom, 1504 s.f. SFR with an attached 576 s.f. garage HUGE E. HOUSTON CONSTRUCTION $96,345.00 94-101 Laurie Monson 1660 HWY 2 WEST T4DA NE 1/4 NE 1/4 SEC 14 T28 R22 Construct walk in basement provide egress windows ; wardrobe against party wall ED GAMER $14,000.00 " }02 Lulow 1404 8TH AVE. EAST Construct a 12 x 22 shed on skids SAME $888.00 94-103 Viola Hurlbutt 1104 4TE AVENUE WEST LOT 12 ELK 18 FISHERS ADD. RECONSTRUCT EXISTING SHOP AREA AND REPLACE 18' OF FOUNDATION SELF $4,400.00 94-104 PLUMB CREEK 75 SUNSET DRIVE NW4 SW4 TRACT 3B, 533, T29, R21 Construct a 30,000 SF addition to existing 10,000 S.F. garco building NORTHWEST BLDG SYSTEMS $400,000.06 TOTALS: $7,060,415.00