Loading...
4. Resolution 5677 - Resolution of Intent and Call for Public Hearing - Light Maintenance DistrictCity of Kalispell Post Office Box 1997 - Kalispell, Montana 59903 Telephone: (406) 758-7701 Fax: (406) 758-7758 To: Mayor Johnson and Kalispell CiLy Council From: Doug Russell, City Manager( Re: Resolution of Intention and Call for Public Hearing - Light Maintenance District Modification Meeting Date: June 2, 2014 BACKGROUND: At the work session on April 28, 2014, staff presented information related to forecasted revenues and expenditures, and policy components for the light maintenance district. This district operates our traffic signals and street lights. Additionally, staff presented service level options related to these respective municipal activities. The presentation from that night is attached. During the work session, Council provided staff guidance to move forward with the option of enlarging the light maintenance district to be a citywide district, rather than only applying to those within 300 feet of a light pole. This option would not impact those properties that are currently being assessed. It would, however, add assessments ($0.003/sf) to properties that are not currently being assessed and are not served by a private lighting system located in the City right-of-way. For those properties that are not currently being assessed, yet are served by a private street lighting system in the City right-of-way, the assessment would be half ($.0015/sf) of the total assessment. It is projected this adjustment would allow for the operation of the light maintenance district to continue through FY24, and includes the installation of 5 new luminaries a year in those areas of town that are without street lights. As part of the consideration of the district adjustments, notification and public hearing processes are applicable and will begin with the passage of the proposed resolution that establishes a date for the public hearing. RECOMMENDATION: It is recommended Council adopt the Resolution 5677 scheduling a public hearing on July 7, 2014, for the proposed modification to the Light Maintenance District. RESOLUTION NO. 5677 A RESOLUTION OF INTENT TO EXPAND THE LIGHT MAINTENANCE DISTRICT OF THE CITY OF KALISPELL, SETTING A DATE FOR A PUBLIC HEARING ON THE PROPOSED EXPANSION AND DIRECTING THE CITY CLERK TO GIVE PUBLIC NOTICE OF SAID HEARING. WHEREAS, the City of Kalispell, pursuant to the authority provided to it under MCA 7-12-4301 et seq., has established a Light Maintenance District, for which real property within the city that is within 300 feet of a city maintained street light is assessed costs for the maintenance and operation of the street lighting system; and WHEREAS, the assessments for the Light Maintenance District have not been increased for eleven years although the costs of operation and maintenance of the system have risen significantly and the projected expenses and revenues of the light maintenance district reveal that the current level of assessment on properties within the boundaries of the existing district will not allow the city to continue to provide the level of service to its street lighting system that it has historically maintained; and WHEREAS, all city residents derive significant benefit from street lighting in the city regardless of whether or not a streetlight is located within 300 feet of their property; and WHEREAS, some city residents live within subdivisions with streetlights in the City right-of-way paid for and maintained by the homeowner associations representing these city residents; and WHEREAS, the City Council finds that it is in the best interests of the city and its residents to consider expanding the Light Maintenance District to include all properties that are within the limits of the city upon an annual schedule as follows: Properties within the light maintenance $ 00.003 per square foot district that are not served by a private street lighting system in the Cityright-of-wayCapped at five acres for vacant land Properties within the light maintenance $ 00.0015 per square foot district that are served by a private street lighting system in the Cityright-of-wayCapped at five acres for vacant land WHEREAS, prior to initiating any expansion of the Light Maintenance District, the city is required, pursuant to MCA 7-12-4329, to hold a public hearing on the matter after giving due and proper notice of said hearing, and to maintain a list with the City Clerk setting forth the proposed assessments per parcel. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF KALISPELL, AS FOLLOWS: SECTION 1. The City Council shall set a Public Hearing on the 7th day of July, 2014, at 7:00 o'clock p.m. in the Council Chambers, City Hall, Kalispell, Montana, to accept comments on a proposed increase to the Light Maintenance District as set forth in the recitals above. SECTION 2. The City Clerk and City Attorney are hereby authorized and directed to make, publish and distribute notices of said Public Hearing in conformity with MCA 7-12-4329 and to maintain within the City Clerk's office a list in which shall be described the lot or parcel of land assessed, with the name of the owner thereof listed, if known, and the amount levied thereon set opposite. PASSED AND APPROVED BY THE CITY COUNCIL AND SIGNED BY THE MAYOR OF THE CITY OF KALISPELL THIS 2ND DAY OF JUNE, 2014. Mark Johnson Mayor ATTEST: Theresa White City Clerk LIGHT MAINTENANCE Level of Service and Budget Review 4/23/2014 4 4 Street Light Background • Light Maintenance District • Tax levied proportionally on an area basis for real property in the city that is within Soo feet of a City street 1 g ht • Amount $.0030 per square foot of lot or parcel per year Caps assessments for vacant [and at 5 acres Includes Lights Located in • City Streets • Alleys Parks • i.oTraffic Lights N Parking Areas N Benefits of Lights • Driver Safety: Street lights increase visibility • Pedestrian Safety: Street lights make it easier to see dangers • Public Safety: People tend to feel safer in lit areas. People are not as vulnerable to being victimized • Increase Nighttime Business: Dark area looks deserted; a well -lighted area looks cheery and inviting, so street lights might be good for business. 2 4/23/2014 Non -metered Lights • Not metered - Flat rate/month for each light - Large luminaires • Flathead Electric Maintains the Lights - Damage, ballasts, light bulbs • 1, 221 1 ig hts • FE performed audit and mapped lights to verify City's account Legend KalbwO Street Lights as of January 3013 2 I Metered Lights Luminaires, decorative �, lights, decorative bollards — �— (15 different types) • City owns and maintains entire light L — Lights are categorized and f s metered for electrical use 585 City owned metered lights — 496 in Downtown area — 47 in Reserve Loop i - — 28 in Meridian Road — 14 Hospital Area (Windward Way, Sunny L Side, Heritage Way) _ - Maintenance — Bulbs, Ballasts, Poles, Wiring 3 4/23/2014 Cost Reductions for FY 15 Budget �. Re -categorized meter accounts to Municipal accounts • Decreased annual electrical fee by $5,622 2. Performed audit of properties • Initial inventory identified $2o,000 annual additions in revenue 3. Reduced allocated staff time • 1 FTE to o.5 FTE decrease Personal Service by $21,335 • Reduced staff time spent preforming activities for Light Maintenance • Eliminated proactive rehabilitation of downtown decorative lights 4 Identified Parks and Recreation areas supported by Light Maintenance Fund Potential reduction in electrical of $9,419 T 4/23/2014 Budget BEGINNING CASH REVENUES hlaiNuianoc Ass mints ldisc, Penalty, Interest TOTAL. AVAILABLE EXPENDITC]M Personal Scnias: Alatcrials and Services: T0101 Capital Qullay @lsch & r(pip) Dcbt Servicc: loan mpayrncnl TOTAL AVULABLE IIN DI NG CASH FY 2015 and 5Year Projection ACTUAL Est BUDGET Proposed Projected Projected 1 Projec Projected Projected FY12113 F Y13/14 FY14115 FY15116 FY16/17 FY17118 W FY18119 F Y1917A S160,503 S152.664 S94,656 S70.180 S40.276 $5397 (S34.652) (857.8281 $320,000 $300,000 $280,000 — $260,000 $240,000 $220,000 $200,000 FY11/12 S236,730 S236,000 S256,000 $257.280 S259.853 $262.451 S265,(M S267,727 58322 $108.731 S1,275 $1.900 $I.900 $I.900 S1,900 $1,900 54DSS55 $497.39S W1.931 5329.360 5302.028 S269.748 $232,323 $211.799 548,907 S761985 S55,647 S57,253 S58,909 S60,618 $62381 $64,201 $203.837 $200.040 $203.858 $209.585 $215.476 S221,536 $227.770 S234,183 $147 $101,27S $0 80 $0 80 SO SD SO $24,438 S22.246 S22.246 $=246 S22.246 SD SD $252,891 S402,739 $281,751 $299.085 5296.632 S304A00 $290.151 $298383 $152.664 VWA56 S70.180 5 10. 176 Current Assessment Review: Projected 2013-2020 FY12/13 FY13/14 FY14/1S FY15/16 FY16/17 FY17/18 FY18/19 FY19/20 tASSESSMENT REVENUE f-EXPENDITURES J 4/23/2014 Level of Service Options 1. Reduce Services to Meet Current Revenue Resources �. Maintain Current Level of Service - Increase assessment 3. Increase Level of Service from Current Levels - Increase assessment 4. Increase Level of Service from Current Levels - Assess all City Parcels -10 6 4/23/2014 Option 1: Reduce Services to Meet Current Revenue Resources Reductions • Reduce allocated staff time from i. FTE to 0.5 FTE from TSS • Reduce maintenance and operationa costs Consequence ■ Reduce level of service • Maintain lights as budget permits • No proactive improvements to Decorative Downtown lights • Not able to install new lights as requested and warranted FY 18 Negative Ending Cash Projected Budget Expenditure Exceeds Total Available Cash 7 4/23/2014 Option Z:Maintain Current Level of Service Reductions • Reduce allocated staff time from i FTE to 0.5 FTE from TSS • Maintain Maintenance & Operational Costs Assessment Increase • Requires a io% FY zS, io% FY 3.6 • Supports Level of service just beyond FY23124 • Provide little budget to repair typical light malfunctions Consequences • Maintain level of service ■ Maintain lights as budget permits • No proactive improvements to Decorative Downtown lights • Not able to install new lights as requested and warranted 8 4/23/2014 Option2: Assessment Increase ACTUAL BUDGET I Proposed Projected Projected Projected Projected Projected Projected Projected Projected Projected FY12113 FY13114 FY14115 FY15116 FY16117 FY17118 FYI&19 FY19120 MOM FY2V22 FY22M FS'" BEGn-N'fYGCASH S160.503 5152.661 S94.656 SO-465 S105327 S113514 S128A74 S134779 S132.469 S121.293 slo', REVENUES 10% 10% SSBiaa .. Ases % 5236,730 5236,000 F 5281d00 1309760 5309,760 5309,760 5309,760 5309,760 5309,760 5309,760 5309,760 5309,760 Mix, Pe.Ok, lwe 58.322 $108.731 SIX$ $11900 $i.9D0 !iQxm S1.900 S1.900 SI,900 SI,900 SI,900 SI,900 TO -I :A 1, A VA I LA III, F Sa05.555 Se97.395 $377.531 Sa01.125 U16.987 5425.174 S425A60 S4e0.13e S4e6.-M S4aa.129 S02.953 S412.6$0 1•:\PEN )111-R}_S Yennn:.l sr,;— S481907 5761985 $SS,d47 $57,253 5581909 S%Al1t 562,381 S64,300 W079 $68,017 $W19 572,086 �Iz,. W4 and Services SMA37 s200.0a0 $210,i73 $216,026 S?=2,046 $22A 38 5230.6M S241,155 SA7,891 S2$00 $261,9ss $269,273 I..l (7* . l0.,6 y (M.h & Equip) $147 5101?75 SO $0 SO s0 s0 S0 s0 SO SO $0 DeN sue — 6.. a7.—I So Sza,ais s22�'46 522519 S22519 S22S19 $0 SQ s0 50 SO k:• TOTALAVAILABLE $25-'.891 $.'J0.'39 2?A O66 $2$O.798 $30,474 $$11.374 $296."7 5305.355 5313.%') 5322.0$ 5331.%6 ENDING CASH, 5152.664 $94.656 S89A65 S105,327 5113.114 5113.800 5128A74 S13CTM S132A69 S121193 5100.990 571191 Option 2 Assessment Review: Projected 2013-2024 $360,000 $340,000 $320,000 v $300,OD0 ~ $280,000 $260,000 $240,000 5220,000 SW $200,000 FY11/12 FY12/11 FY13/10 FY19/15 FY15/16 FY16/17 FY17/18 FV18/19 FY19/20 FY20/21 FY21/22 FY22/21 FY21/24 tASSESSMENT REVENUE EXPENDITURES 9 4/23/2014 Option 3: Increase Level of Service from Current Level Recommendation • Maintain dedication of full timeTSS (:L FTE) • Maintain M &❑ co5t5 • Maintain lighting costs for parks • Proactive replacement of Decorative Downtown lights • Abilityto add new lights if and when requested and justified • Equipment Replacement Fund Assessment Increase • Requires a 1S% increase in FY 15 and FY 16, Zo OA increase in FY 17, and 3% increase in FY18 • Supports level of service just beyond FY23/24 Consequences • Ability to maintain fights immediately • Phased rehabilitation of decorative lighting system • Ability to Install 1 new light as requested and warranted • Maintain lighting cost for parks • Designated Capital Equipment Replacement Fund (Boom truck) 10 4/23/2014 Option 3: Assessment Increase 6E:(.1 N N I NG CASH Makkt=uc Asses nts Misc, Pe11a1ly, Nleml TOTAL AVAILABLE EXPENDITURES V afenals and Srnioes: I oral Calival []inlay (Mach & Egtdp) DclA Senior. loan relnrpir TOTAL AVAILABLE ENDING CASH ACTUAL IEsl BUDGET) Prnpmed I Projected I Prnjected I projected I Projected I Projected I projected I projected I Projected I Projected $160.503 $152.664 S94.656 S46.393 533.988 S46.532 S61084 S88.72i S106_653 S114593 S112.249 S99.321 IS"e 15% 10% o S236,730 $236,000 F T294400 T338 60 S372416 $38388 $383.598 S383.58 $383,588 $383,589 S383,588 $393.588 W22 S108.731 S1175 S1.900 S1.900 S1,900 SL900 T1.900 $1.900 SI.900 S1.900 S1?riff $405,555 $497395 $390,331 $386,853 $108,301 $432A21 $446,573 S474,211 Sa92,1 a S500,082 _ S497,738 I'g. a6i $48,907 $76985 $9"0 03,101 "S,762 598,507 $101,338 $104,25S $107,270 $110,378 $113,585 $116,594 $203,837 MAO $221,173 $227.246 $233,491 $239,911 $246,512 W3300 $260,279 $267,454 $274,833 S282,420 $147 5101,275 $0 $0 90 90 $0 $0 SO m $0 $0 SO S24,438 $22,246 $22518 $22518 $22,513 $0 $0 SO SO $0 $0 $252.891 $402.739 S343,938 $352,965 $361.771 $370.936 S357350 $367558 $377.549 $387.832 S398,417 W9.314 SM-664 S94.656 S46393 $33.996 $46.532 M1.084 S68.723 S10-6.653 S113593 $112.249 S99321 $75,495 Option 3 Assessment Review: Projected 2013-2024 $450,000 $400,000 $350,000 $30D,000 $250,000 $200,000 $150,000 FY11112 FY12113 FY13114 FY14115 FY15/15 FY15117 FY17118 FY18I19 FY19120 FY20121 FY21122 FY22123 ASSESSMENT REVENUE tEXPENDITURES 11 4/23/2014 Option 4: Increase Level of Service from Current Level -Light Assessment for Entire City Level of Service Expenditures • Full time TSS salary • Maintain O & M Costs • Lighting Supplies • Repair and Maint Service • Decorative Light Rehab 6Jyr • Electricity • Capital Outlay • Machinery and Equipment replacement • Installation, new luminaireslyr Assessments • Cost/Per Square Ft - .003 $Jsf • Vacant land cap at 5 Acres • 50% reduction for properties within subdivision with private street light systems 12 4/23/2014 Option 4: Assessment Summary • Level of Service requires assessment revenue of $401,00❑ • Ensures LOS is provided beyond FY 23/24 • Parcel Assessment Summary • City total = 9,450 • Currently assessed = 6,995 (.003$Jsf) • Add Non -private street light system = -,543 (.003 $1sf) • Add Private street light system = giz (.0015 $Jsf) • Total annual assessment including all parcels = $4-10,000 W: Legend 7Y+6 t�n..r nwnw dorv�. auw.a `i3 bd•d v�K�a N arn.Mtl OSZ Awn•.al _.,g. P+ ,W% v.r • 4wn.wr•e IgFb nkOY.N rgja .L �tnt 13 4/23/2014 Option 4:Light Assessment for Entire City ACTUAL BUDGET I BUDGET I IlmWwd I ProJeewd I IlmWwd I ProJeewd I ProWwd I ProWwd I Prole led ProJecred ProJecred FYIW13 )F'YI3n4 FYlm15 EY L'Jl6 FY &17 BY17118 FYI&V BY147211 PYPIY21 FY21�x2 PY22173 BY7_V24 BEGrVN-D;G C AS] I SM 165 S151se. Sw.sse Sl _'�'�l, Sl ss:titi Sl':u 5180.181 Sx1 519530] S['�•ti, RY..A'FNI"E:S +tinevaoceAnnammla 3�473P S�g000 Si01,93] SW1933 S,P1933 SW1933 S,P1933 SW1,9:0 Si01,931 SW1,9:0 3 SS 51P19=0 1.wl rO7ALAVAII ABLE. Lp5.555 E ..3" Etl7.651 E53IM swb E577._87 S%4,,7G3 &6D4, 33 SE31,457 SE IMI SE01120 5679.103 FXPE NIMI URES PmwLL55*•cn Ss5,90T 376,9d5 SP0,510 590,101 SPS?S2 SPS.507 5101,13E 51 04_'5E 5107.270 5110,575 5113Su 5116.s�: ]fantiflf.ud Sen•tn. 331�837 3'�]D,OW 33.�1T3 3�17� 12181 0 S S�BP 5_71[91 5'_95I796 5�7�06 3'95p� 3301933 i311.1[•. T-1 C.Pil.7 Nu.,(] t,"OF) E1I7 E30117 fD !D SD SO fD SO W SO W f0 [lrhttimier lrw rryaa�g5q T[I7 A1. AVAILABLE L'S169] W,739 L367.938 U77.3[5 S39R405 SM.E E 4,,P55 s4K, 7 E113,101 EI 6M7 5437,M ENDING CASH 15_sC! 656 132003i &]7 W MOW SII&M Option 4: Assessment Review Projected 2014-2024 $500,000 $450,000 $400,000 $350,000 $300,000 $250,000 $200,000 $150,000 FY11/12 FY12/13 FY13114 FY14/15 FY15116 FY16/17 FY17/18 FY18119 FY19/20 FY20121 FY21/22 FY22/23 FY23124 —ASSESSMENT REVENUE —trE]fPEN�ITURES 14 4/23/2014 Assessment Comparison • Option Difference SFR • Opt 1: none • Opt 2 : $5.431yr • Opt 3: $12.9o/yr • Opt 4: none, but additional parcels assessed per current rate u Lion t : xeauce service to rvieet. k-urrem Kevenue Kesource ssessment Increase % Current 00/a 0% ff% 0% 0% ssessme., ISq FT 0.003 0.003 0.003 0.003 0.003 0.003 Sq FT FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19 Typical SFR 8,632 $25.90 $25.90 $25.90 $25.90 $25.90 $25.90 Commercial 20,000 $60.00 $60.00 $60.00 560.00 $60.00 $60.00 u tion L: n+iamtain Lurrent level ar servtee Increase % Current 10% 10% wo wo 0% �css-'n'�Assess'=,tIS FT 0.0030 0.0033 0.0036 0.0036 0.0036 0.0036 Sq FT FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 FY 18-19 Typical SFR 8,632 $25.90 $28.49 $31.33 $31.33 $31.33 $31.33 Commercial 20,000 $60.00 $66.00 1 $72.60 1 $72.60 1 $72.60 $72.60 on 3: Increase bevel of Service from Current Levels sment Increase % Current 15010 15% 10% 3% 00/0 sment ISq FT 0.0030 0.0035 0.0040 0.0044 0.0045 0.0045 Sq FT FY 13-14 FY 14-15 FY 15-16 FY 16.17 FY 17-18 FY 18-11) Typical SFR 8,632 $25.90 $29.78 $34.25 $37.67 $38.80 $38.80 Commercial 20,000 $60.00 $69.00 $79.35 $87.29 $89.90 $89.90 1D- 4/23/2014 4 4 4 Decorative Globe Light Rebuilds • 85 Decorative Globe Fixtures • Constructed in 3.98o's 425 bulbs [5 bulbs each] • 8 currently rebuilt on the streets: 2 on 3rd St W • 6 on ist St E& W • Power Usage • Incandescent watt usage: i795o watts per hour =17.95 kwh • LED watt usage: 5737 watts = 5.74 kwh • Kwh rate is S.05028 • lnCandescent price per hour: so.96 • LED price per hour: s0.32 • Light Use 3,47o hours a year (turned on & off bya photocell) • $3,400 per year to run incandescent average run time • si.2x0 per year to run LED average runtime S z, z go p e r yea r savi ng s on avera ge run tim e • LED bulbs • More obrationftold resilient then incandescent bulbs • Last too,cooplus hours, compared to to,000(incandescent) • Improvin the head placement and hardware to make these lights easlerlfas�er to service 1 L�