2. Bid Rejection - WWTP Biosolids Dewatering Project201 IStAvenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 www.kalispell.com /public works 105 1 D104037_�1�1 Date: April 29, 2014 TO: Doug Russell — City Manager Cr FROM: Curt Konecky — Wastewater Treatment Plant Manager CC: Susie Turner, PE — Director of Public Works / City Engineer �I SUBJECT: Biosolids Dewatering Project " MEETING: May 5, 2014 BACKGROUND: The Biosolids Dewatering Project involves replacing of one of the existing belt filter presses and installing a new screw press in the de -watering system at the WWTP. Bids for the Project were opened on Thursday, April 10, 2014. One responsive bid was received and reviewed for completeness by HDR Engineering. HDR evaluated the bid and the certified bid tabulation is attached. The engineer's estimate for this project was $96,935. Contractor Swank Enterprises Base Bid $159, 000 STAFF RECOMMENDATIONS: Staff recommends exercising the right to reject the bid for this project and re -bid the project in the fall of 2014. To reduce project costs, City staff will perform components of the demolition and installation internally. The contract documents will be modified and repackaged accordingly for re -bidding in the fall. ACTION REQUESTED: Motion to reject the Biosolid Dewatering Project to Swank Enterprises. FISCAL EFFECTS: The project will be funded by the Sewer Fund through the Wastewater Treatment Plant Capital Outlay- Replacement Funds (5310-455-430640-940). The project funding will be carried over to the FY 14/15 Budget. ALTERNATIVES: As suggested and approved by the City Council. April 29, 2014 Susie Turner Public Works Director City of Kalispell P.O. Box 1997 Kalispell, MT 59903-1997 RE: Biosolids Dewatering Project Bid Dear Susie: Swank Enterprises of Valier, Montana with offices in Kalispell, Montana was the sole bidder for the above referenced project. We have evaluated the bid and information required of bidders. Please find a certified bid tab attached for your records. A breakdown of Swank's bid and the engineer's estimate is included in the table below. We understand the City has budget constraints and would like to consider alternative methods of completing the project. As the City of Kalispell's engineer on this project we recommend the City reject Swank"s bid and re -bid the project in the fall of this year. To reduce costs of installing the new volute press, City staff could perform some of the demolition and removal of the existing belt filter press. The contract documents will be modified and repackaged accordingly for re -bidding this fall. An effort will be made to reach out further geographically to try to garner additional interest in project. The volute press will be shipped to the site as planned and stored on site until installation later this year. Item Description Swank's Bid Engineer's Estimate 1 General Re uirements $15,591 $4,800 2 Demolition $20,285 $12,300 3 Concrete $3,881 $4,900 4 Install New Press $18,271 $12,300 5 Misc Steel $2,257 $5,925 6 Piping & Valves $50,388 $19,350 7 Painting $9,789 $6,300 8 Instrumentation $9, 374 $7, 800 9 Electrical $27,590 $22,300 10 Subtotal $157,426 $95,975 11 Tax $1,574 $960 12 Total $159,000 $96,935 1715 S. Reserve St. Suite C Missoula, MT 59801 T 406.532 2200 F 406.532.2241 hdrinexom Please call if you have any comments or questions with regard to this issue. Sincerely, HDR ENGINEERING, INC. Rickey Schultz, P.E. Project Engineer cc. File Curt Konecky, City of Kalispell Paul LaVigne, MDEQ 1715 S. Reserve St. Suite C Missoula, NIT 59301 T 406.532.2200 F 406.532.2241 0 z (09b00 uomoaS) ;!nepW y uo!sn!!oO-UON N i X 0 z pap!nord ,ffjttnoaSIpuo8 p!8 N CD r x 0 z tuaoj p!g apidwoo } X mO 0 ;a w Efl tY uw 0 m a w Y _ t6 Cot It d N Q _E C) K O p mz LV M