2. Bid Award - Roof Liner Replacement Project201Is' Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 www.kalispell.com /public works MEMORANDUM Date: March 26, 2014 TO: Doug Russell — City Manager-vf FROM: Curt Konecky — Wastewater Treatment Plant Manager CC: Susie Turner, PE — Director of Public Works / City Engineer SUBJECT: Roof Liner Replacement — WWTP Digester Building MEETING: April 7, 2014 BACKGROUND: The Roof Liner Replacement Project for the Digester Building at the Wastewater Treatment Plant (WWTP) replaces the existing roof liner with a fully adhered PVC membrane. The existing EDPM (synthetic rubber) roof liner was installed in 1984 as part of the original construction. The existing roof liner has outlived its 10 year design life, and is beginning to deteriorate. Two alternatives were bid. Bid Alternative 1 would remove the existing ballast rock, roof liner and insulation. Existing insulation which could be salvaged would be reused. Insulation needing replacement would be done as approved by the City and paid for by the square foot. A 20 year warranty on the PVC membrane only and a 2 year warranty on workmanship would be provided. Bid Alternative 2 would remove the existing ballast rock, roof liner and insulation. An all new roof liner system would be installed, including new insulation. A 20 year warranty on the entire roofing system and a 2 year warranty on workmanship would be provided. Bids were received and opened on March 20, 2014 at 2:30 PM. Two responsive bids were received and were within the project budget. Contractor Progressive Roofing Summit Roofing Alternative 1 Alternative 2 $ 39,180.00 $52,600.00 $ 37,153.00 $36,653.00 References for Summit Roofing were checked and they were determined to be a responsible contractor, successfully completing projects of similar scope and magnitude. Bid documents and specifications were developed prior to adoption of Council Ordinance 1734 amending the City Managers procurement authority limit to $80,000. Advertised bid documents specified the recommended lowest bid for this project will be approved through Council action. STAFF RECOMMENDATIONS: Award the bid for the Roof Liner Replacement — Digester Building — Kalispell Wastewater Treatment Plant Project to Summit Roofing for Alternative 2 in the amount of $36,653. ACTION REQUESTED: Motion to award the Roof Liner Replacement — Digester Building — Kalispell Wastewater Treatment Plant Project to Summit Roofing for Alternative 2 in the amount of $36,653. FISCAL EFFECTS: The project will be funded by the Sewer Fund through the Wastewater Treatment Plant Buildings line item (5310-455-430640-920), which has a remaining balance of $54,893. ALTERNATIVES: As suggested and approved by the City Council.