Loading...
2. Award Bid - Wall Repair Project201 I st Avenue East PO Box 1997 Kalispell, MT 59903 Phone: 406-758-7720 Fax: 406-758-7831 www.kalispell.com Ipublic_works MEMORANDUM Date: March 12, 2014 ����,r�► TO: Doug Russell, City Manager IL FROM: Aaron McConkey, PE, Project Manager CC: Susie Turner, PE, Director of Public Works, City Engineer' ' SUBJECT: Wall Repair Project for the Buffalo Hill Water Storage Tanks MEETING: March 17, 2014 BACKGROUND: The Wall Repair Project for the Buffalo Hill Water Storage Tanks repairs and rehabilitates the aging and deteriorating concrete stem walls of the two lower zone water reservoirs. This project structurally repairs smaller cracks with a method of epoxy injection and repairs larger cracks with a method of hydrophilic sealant. In addition to repair of concrete cracks, existing expansion joints and pipe penetrations will be repaired and rehabilitated as a portion of this project. This project repairs and rehabilitates the deficiencies in the concrete stem walls of both water storage tanks as identified in a 2012 engineering inspection report prepared by DSB Engineering & Consulting, PC. Potential risks to water quality will be reduced with this project as pathways for infiltration will be reduced and the structural integrity of the roof supporting stem walls will be increased. Bids were received and opened on March 6, 2014 at 2:30 PM. One responsive bid was received. Project manuals were requested and delivered to 4 contractors. The bid results follow: Contractor Total Bid Price Neal Structural Repair, LLC $72,262.00 Vendor quotes in 2012 were received ranging from $66,000 to $82,500. References for Neal Structural Repair, LLC were contacted and interviewed. Neal Structural Repair, LLC was determined to be a responsible contractor, successfully completing projects of similar scope and magnitude in Montana. STAFF RECOMMENDATIONS: Award the bid for the Wall Repair Project for the Buffalo Hill Water Storage Tanks to Neal Structural Repair, LLC in the amount equal to the sum of the Bid Schedule No. 1 and Bid Schedule No. 2 for a total of $72,262.00. ACTION REQUESTED: Motion to award the Wall Repair Project for the Buffalo Hill Water Storage Tanks to Neal Structural Repair, LLC with the execution of Bid Schedule No. land Bid Schedule No. 2. FISCAL EFFECTS: The project will be funded by the Water Fund, Lower Zone Reservoir Improvements (5210-447-430550-938). Currently $119,832.00 remains in this fund for this scheduled capital improvement project. ALTERNATIVES: As suggested and approved by the City Council. ATTACHMENTS: Bid Analysis paApalmouxov Q umpuappd z pasoloug puog pig pauoiS pig X QwIj, k uo pall!LugnS 0 0 � N O F"' N N N U a N -o O z o a a � o D cn 1A O cn :12 7-:1 a� 0 z o a b U o6 M T7 � M 7 z v bo 0 o 0 ct U M 00 C, x Q a z O 0 f/] z 2a Bid Price Schedule No. 1, Reservoir No. 1 (1.74 MG) Neal Structural Repair Estimated No. Description Unit Quantity Unit Price Total Price I Repair Mortar ( Spall & SF 360 $50.00 $18,000.00 Sill Repair) 2 Expansion Joint Repair Each 0 3 Crack Repair, Cracks Less Each 70 $159.60 $11,172.00 than 1/4 Inch 4 Crack Repair, Cracks Each 10 $399.00 $3,990.00 Greater than 1/4 Inch 5 Pipe Penetration Repair Each 1 $5,000.00 $5,000.00 $38,162.00 Bid Price Schedule No. 2, Reservoir No. 2 (2.8 MG) Neal Structural Repair Estimated No. Description Unit Quantity Unit Price Total Price 1 Repair Mortar ( Spall & SF 150 $50.00 $7,500.00 Sill Repair) 2 Expansion Joint Repair Each 8 $500.00 4000 3 Crack Repair, Cracks Less Each 40 $210.00 $8,400.00 than 1/4 Inch 4 Crack Repair, Cracks Each 8 $525.00 $4,200.00 Greater than 1/4 Inch 5 Pipe Penetration Repair Each 2 $5,000.00 $10,000.00 $34,100.00