Loading...
Components of Facility Plan & Condition InventoryCOMPONENTS OF THE FACILITY PLAN & CONDITION INVENTORY FOR THE CITY SITE: Physical location of the facility UNIT: List of multiple structures on the Site PRINCIPLE USE: What is the facility used for? OCCUPANTS/STAFF: How many personnel use or occupy the facility. DEPARTMENT: Which department of the City uses, controls, and maintains the UNIT UNIT SF: Square feet of the UNIT EXTERIOR SF: Square feet of any parking area, lawn, or storage space associated with the UNIT. ADDITIONAL AC. Open space not classified as UNIT or EXTERIOR SF. YEAR BUILT: Date of the original construction ORIGINAL COST: Original cost to build the structure CONSTRUCTION: Original construction material, concrete, block, wood, etc. LEVELS/STORIES: Single floor or multiple levels. REPLACEMENT: Cost estimate to build a replacement facility of the exact size. CONDITION: Condition on last date of inventory. REPAIR ESTIMATES: Repairs supported by work orders or estimates from engineer. HEATING PLANT: Type of heating system used. AIRCONDITION: Yes/No INTERNET: Yes/No NATURAL GAS: Yes/No ELECTRIC: Yes/No TELEPHONE: Yes/No SPRINKLERED: Yes/No ALARM SYSTEM: Yes/No WINDOWS: Single, double pane PLUMBING: Number of WC, U, S, WS DOORS: Types of doors. ROOF CONDITION: Inspection by qualified individual — Code for Condition