***Email/Kalispell City AirportFred Leistiko
From:
Kevin Botchek Mild Fence [kevin@mildfence.com]
Sent:
Tuesday, July 13, 2010 4:37 PM
To:
Fred Leistiko
Subject:
Re: Emailing: Kalispell city airport
Fred,
Yes we could do that, I"m going to say about $ 450.00 more. We would have to bring both gates back and extend them
plus add a couple extra posts on that side, so you would be without gates for a day.
Kevin
----- Original Message -----
From: Fred Leistiko
To: Kevin Botchek Mild Fence
Sent: Tuesday, July 13, 2010 4:23 PM
Subject: RE: Emailing: Kalispell city airport
Got it fine. Would it also be possible to make each gate 6' larger (30') and have a 60' opening? Two 30' gates. I know
will cost more, but is it an option also? I
Thanks,
Fred A. Leistilco
Airport Manager
City of Kalispell
P.O. Box 1997
Kalispell, MT 59903
406-250-3065
From: Kevin Botchek Mild Fence [mailto:kevin@mildfence.com]
Sent: Tuesday, July 13, 2010 10:10 AM
To: Fred Leistiko
Subject: Emailing: Kalispell city airport
Fred,
fence bid attached for gate
reply back so I know you got this
Thanks,
Kevin
The message is ready to be sent with the following file or link attachments:
Kalispell city airport
Note: To protect against computer viruses, e-mail programs may prevent sending or receiving certain types of
file attachments. Check your e-mail security settings to determine how attachments are handled.
I
3465 Hwy. 93 N.
Kalispell, Montana
CUSTOMER:
ADDRESS: C/d
MAILING AD
CITY: b8 fo 10)
= M_� 0.
Post O.D. Size
—7.70th
Kind
Corner Posts
End Posts
Gate Posts
Line Posts
Amount Size
t4l'
dc
+t, _S -i(
,
Tension Bands
Brace Bands
Ralf Ends
Post Caps
Nuts and —Bolts
E e To s
To Raiff
To Rail Sleeves
Chain Link Fabric
Tension Bars
—
I -
Tie Wires
Gates
Post Hi
Height Width
Height
PRICE:
DOWN PAYMENT:
BALANCE: Or�
TERMS:
W IS016RA 4:11MRALMAN6140M
W
_e12N._ S.- E. W.
Fence Line Sketch
-S
tl'tw W --H u -1-0t
k C-
Opp emris.
LA r g LX V.
hA Y -t C-\
15VII, & 4 k &AT,-,
Fabric: A
Height: 4 S �An 6
Line Posts:
Spacings:
Terminal Posts; _2
Gate Posts.-_L?A!f_
Top Rail: --dir
Walk Gates:
Drive Gate:
Barbed Wirf
Bottom Wire:
MILD FENCE CO. agrees to do all the above work in a good workmanlike manner.
We do not accept American Express or credit card payment by phone.
It is further agreed that time shall be the essence of this agreement, and that In the event any default be made in the payments hereinbefore required to be made,
'he total amount then due hereunder shall become due and payable forthwith without notice.
This agreement shall not be binding upon the contractor until signed by him in writing. All unused materials shall, under any conditions, remain the title and prop-
irty of the contractor. A fence permit, If required, must be obtained by the owner. Owner responsible for restrictions or covenants on prop".
It Is further agreed that contractor shall not be liable for delays caused by weather conditions, obtaining materials, or any other causes beyond his control.
Owner agrees that In the event of cancellation of this contract before work has started, owner shall pay to contractor on demand twent)(4ive (25%) percent of the
contract price as its stipulated damages for the breach. Verbal agreements other that those expressed on this contract are not binding.
Fence will be built to average general grade In disregard to unevenness of ground. Fence will be erected on lot fine when stakes can be found. If no stakes can be
located, It will be the responsibility of the property owner to determine his property line. If survey is necessary, the property owner Is required to pay for that service.
MILD FENCE CO. will not be responsible for damaging unmarked private underground lines such as sprinklers, power, septic, etc. Costs to locate private lines are
xwners responsibility. MILD FENCE C will notify UDIG for underground utility locates.
ACCEPTED -TERMS. 1 1/2' 2H FINAN