Bid Tabulation FormAugust 27, 2013
Bid Opening at 2!00 PM
THE WILLOWS STORMVVATER MPROVEAIENTS PROJECT
BID
E-aeer's Estimate
%h"Rfte
LHC
1
8+adr
Newman
UNIT
TOTAL
I -NIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
UNIT
TOTAL
ITEM
DESCRIPTION
UNIT
QUANTITY
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
101
MOBILIZATION I DEMOBILIZATION
1S
I
S 34.450.00
S 34,45D.W
S 22.".W
4 22,0W.W
S 16,750,00
S 10.750.OD
S SA06.00
$ 8.006.00
S 16.807.00
S 16A07.04
im
EXPLORATORY EXCAVATION
14R
10
S 200.00
$ 2,000.00
$ 215.00
S 2,150.00
$ 230.00
S 23W.00
S 295.00
1 2,950.00
$ 95.00
S 950.00
163
CONSTRUCTION TRAFFIC CONTROL
IS
I
S 10W.00
S 5AM.00
S 33011M
S 35WA0
S 13.160.00
S 13.160.OD
S 1.704.00
$ 1.704.00
S 3.650.00
$ 3,650,00
POND GRADING. GABION WALL. & SLOPE
201
TABIL17ATION
LS
1
S 20.500.W
S 203KOO
S 4%0W.00
$ di,00.00
$ 21.310.00
S 21310.00
S 32960.00
S 32.960.00
S 25.210.00
S 25,210.00
202
FURNISH AND INSTALL ACCESS GATE
IS
I
S 2.000.M
S 2.W0.00
S 2.200.00
$ 2,M,,00
S 1,345.W
S 1.M45.W
S L243.W
$ 1.7,43.00
S 2,416.00
$ 2,436.00
FURNISH till INSTALLSKIMMER
203
STRUCTURE
EA
2
S 1,0W.00
S 6.000.00
S 3,500.00
S 7M0.00
$ 4.290.W
S 8,580.W
S 6.914.00
$ 13.828.00
S 4500.00
$ 9,000,00
FURNISH AND INSTALL20-INCH URI I
HOPE OR 18-INCH SDR 35 PVC OUTLET PIPE
204
- DEPTH GREATER THAN 8 FEET
LF
610
$ 240.00
S 146AW.00
5 60,00
s -I&C 1.O0
$ 123.00
S 75.010.W
S 160.IA
S 97,6W.W
S 5350
S 32,635.W
FURNISH AND INSTALL 20-INCH ORI I
HOPE OR I&INCH SOR 35 PVC OUTLET PIPE
205
- DEPTH LESS THAN 8 FEET
LF
638
S 75.00
S 47.850.00
S -" W*
$ 31.900.w
S 85.W
$ 'A.230.00
S 148.07
$ 94,424.00
S 48.M
S 30.624.00
FURNISH AND INSTALL4-FOOT DIAMETER
206
IMANHOLE ON OUTLET PIPE
EA
6
S 2.300,00
S 15.0W,00
S 3.0W.00
5 18.000.01)
S 3380.00
S 20.280.00
S 2862.00
S 17.172.00
S 2.680.00
1 S 16A80.00
FURNISH AND INSTALLOUTFALLTO
207
STILLWATER RIVER
LS
I
S 5,0W.00
S 5.000.00
S 3200.00
S 3.2LV01
S 2640.00
S 2,640.00
S 4.136.00
S 4,136,00
S 4.500.00
S 4500A0
FURNISH AND INSTALLCLASS I RIPRAP AT
208
COLLECTION SYSTEM OUTFALL
EA
2
$ 750.00
S 1.500.00
5 L60].00
S I.200.00
S 1,165.00
S 2.330,W
S 7393.00
S 4.70.00
S 2450.00
$ 4.900.00
FURNISH AND INSTALLCLASS 11 RIPRAP
209
AT OUTLET PIPE OUTFALL
IS
1
$ 8.400.00
S SAKOO
S 5.100.bd
5 5,1OOW
S 32S0.00
S 3.250.00
S 4.809.0
S 4,W9.00
S 2.50D.00
$ 2500.00
FURNISH AND INSTALL4-FOOT DIAMETER
DOWNSTREAM OFFENDER UNIT -OFFLINE
301
lCONFIGURATION (STORM PIPE I}
LS
I
S 20.0W.00
S 20.000.00
S 220W.00
S 2.'.0w.Ll)
S 32.695.00
S 32695.00
S 30L696.00
13 30.6%.00
1 S 43.050.00
IS 43.050.00
FURNISH AND INSTALL4•FOOT DIAMETER
DOW NSTRFAM DEFENDER UNIT - ON-LINE
302
CONFIGURATION (STORM PIPE 2)
LS
1
S 175WAO
S 17.500.00
S 20.0WOD
S 20.W0.0)
S 2.5.095.00
S 25.095,00
$ 24.620.00
S 24,620.00
S 41.010.00
S 41.050.00
RESTORE• CURS & GUTTERS UfiWALK.
AND ASPHALT AS REQUIRED BY
303
ENGINEER
IS
1
S 15.00.00
S 15.0W.W
S 20500.00
S 20,S00.D)
S 18.070.00
S 18.070-00
S 9S75.CO
S 9.875.00
S 9100-00
S 9.200.00
TOTALBID S346.6W.W $738:115mw 52Yl.Wa.w a,144. fby.w