Bid Tabulation FormAugust 27, 2013 Bid Opening at 2!00 PM THE WILLOWS STORMVVATER MPROVEAIENTS PROJECT BID E-aeer's Estimate %h"Rfte LHC 1 8+adr Newman UNIT TOTAL I -NIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM DESCRIPTION UNIT QUANTITY PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE 101 MOBILIZATION I DEMOBILIZATION 1S I S 34.450.00 S 34,45D.W S 22.".W 4 22,0W.W S 16,750,00 S 10.750.OD S SA06.00 $ 8.006.00 S 16.807.00 S 16A07.04 im EXPLORATORY EXCAVATION 14R 10 S 200.00 $ 2,000.00 $ 215.00 S 2,150.00 $ 230.00 S 23W.00 S 295.00 1 2,950.00 $ 95.00 S 950.00 163 CONSTRUCTION TRAFFIC CONTROL IS I S 10W.00 S 5AM.00 S 33011M S 35WA0 S 13.160.00 S 13.160.OD S 1.704.00 $ 1.704.00 S 3.650.00 $ 3,650,00 POND GRADING. GABION WALL. & SLOPE 201 TABIL17ATION LS 1 S 20.500.W S 203KOO S 4%0W.00 $ di,00.00 $ 21.310.00 S 21310.00 S 32960.00 S 32.960.00 S 25.210.00 S 25,210.00 202 FURNISH AND INSTALL ACCESS GATE IS I S 2.000.M S 2.W0.00 S 2.200.00 $ 2,M,,00 S 1,345.W S 1.M45.W S L243.W $ 1.7,43.00 S 2,416.00 $ 2,436.00 FURNISH till INSTALLSKIMMER 203 STRUCTURE EA 2 S 1,0W.00 S 6.000.00 S 3,500.00 S 7M0.00 $ 4.290.W S 8,580.W S 6.914.00 $ 13.828.00 S 4500.00 $ 9,000,00 FURNISH AND INSTALL20-INCH URI I HOPE OR 18-INCH SDR 35 PVC OUTLET PIPE 204 - DEPTH GREATER THAN 8 FEET LF 610 $ 240.00 S 146AW.00 5 60,00 s -I&C 1.O0 $ 123.00 S 75.010.W S 160.IA S 97,6W.W S 5350 S 32,635.W FURNISH AND INSTALL 20-INCH ORI I HOPE OR I&INCH SOR 35 PVC OUTLET PIPE 205 - DEPTH LESS THAN 8 FEET LF 638 S 75.00 S 47.850.00 S -" W* $ 31.900.w S 85.W $ 'A.230.00 S 148.07 $ 94,424.00 S 48.M S 30.624.00 FURNISH AND INSTALL4-FOOT DIAMETER 206 IMANHOLE ON OUTLET PIPE EA 6 S 2.300,00 S 15.0W,00 S 3.0W.00 5 18.000.01) S 3380.00 S 20.280.00 S 2862.00 S 17.172.00 S 2.680.00 1 S 16A80.00 FURNISH AND INSTALLOUTFALLTO 207 STILLWATER RIVER LS I S 5,0W.00 S 5.000.00 S 3200.00 S 3.2LV01 S 2640.00 S 2,640.00 S 4.136.00 S 4,136,00 S 4.500.00 S 4500A0 FURNISH AND INSTALLCLASS I RIPRAP AT 208 COLLECTION SYSTEM OUTFALL EA 2 $ 750.00 S 1.500.00 5 L60].00 S I.200.00 S 1,165.00 S 2.330,W S 7393.00 S 4.70.00 S 2450.00 $ 4.900.00 FURNISH AND INSTALLCLASS 11 RIPRAP 209 AT OUTLET PIPE OUTFALL IS 1 $ 8.400.00 S SAKOO S 5.100.bd 5 5,1OOW S 32S0.00 S 3.250.00 S 4.809.0 S 4,W9.00 S 2.50D.00 $ 2500.00 FURNISH AND INSTALL4-FOOT DIAMETER DOWNSTREAM OFFENDER UNIT -OFFLINE 301 lCONFIGURATION (STORM PIPE I} LS I S 20.0W.00 S 20.000.00 S 220W.00 S 2.'.0w.Ll) S 32.695.00 S 32695.00 S 30L696.00 13 30.6%.00 1 S 43.050.00 IS 43.050.00 FURNISH AND INSTALL4•FOOT DIAMETER DOW NSTRFAM DEFENDER UNIT - ON-LINE 302 CONFIGURATION (STORM PIPE 2) LS 1 S 175WAO S 17.500.00 S 20.0WOD S 20.W0.0) S 2.5.095.00 S 25.095,00 $ 24.620.00 S 24,620.00 S 41.010.00 S 41.050.00 RESTORE• CURS & GUTTERS UfiWALK. AND ASPHALT AS REQUIRED BY 303 ENGINEER IS 1 S 15.00.00 S 15.0W.W S 20500.00 S 20,S00.D) S 18.070.00 S 18.070-00 S 9S75.CO S 9.875.00 S 9100-00 S 9.200.00 TOTALBID S346.6W.W $738:115mw 52Yl.Wa.w a,144. fby.w •� •�pNTAI�q.�. I'nou�L>tis`: K ITH = HASKiNS - 2,7 NR.2S6T�� 4 ��.ClCEl5�5cf�.:r + 13