06-01-88 Public Works Comm Minutes1, 1988 PUBLIC WORKS/PUBLIC SAFETY 4:00 Y.M.
SEWER AND WATER COMMITTEE MINUTES
Attendance: Chairman Gunnerson, Councilwoman Hafferman and Councilman Schindler.
Others Present: City Attorney Neier, DPW Hammer, Community Development Director
Gallagher, Police Chief Clark, Fire Chief Waggener, City Clerk/Treasurer Halver,
City Accountant Robertson, Susan Moyer, Community Development, Surveyor Zavodny,
Street Supt. Brady, W/S Supt. Hyde, Jay Billmayer, Billmayer Engineering, Jim Lynch,
Nu-Pac, Dana Christensen, Murphy, Robinson, Heckathorn & Phillips, Dave Miller,
McElroy & Wilken.
Vice Chairwoman Hafferman opened the meeting with the following first agenda item.
PARKHILL ROAD Surveyor Zavodny gave a brief description of the parking problem on
Parkhill Road resulting from traffic for the Montessouri School. He stated the
Police Department and the school have worked out an educational solution to the
problem. The parents of the students will be informed to not park on the adjacent
properties' lawn.
DR. MADSEN - SITE PLAN Surveyor Zavodny stated Dr. Madsen, who has a dental office
on 1st Ave. W.N., has been into the Public Works Office on many occasions with several
concepts that he is working on. The Public Works Department will continue to work
with Dr. Madsen until there is a plan designed that is satisfactory to everyone and
will make a recommendation at that time.
STREET MAINTENANCE DPW Hammer stated, for informational purposes, the Street Department
has begun the street maintenance program. Street reconstruction is not going on at
present due to the uncertainty of funding for other relating projects. He stated that
street maintenance is more difficult than most people realize. Curbing, drainage
problems, raising sewer lids or gate valves all have to be addressed when conducting
. street maintenance.
ALLEYS DPW Hammer questioned the Committee if the Public Works Department should
continue to work under past/present policy in regard to the paving of alleys. There
are people willing to pay for their alley to be paved. The Committee agreed to continue
with the current policy until further notice.
DPW Hammer stated that each year the Public Works Department oils the alleys and the
cost is approximately $43,000. With the paving of these alleys, a portion of the cost
for oiling is eliminated.
RECOMMENDATION - AWARD OF BIDS: DPW Hammer stated the recommendation of the Public Works
Staff to award the bids as follows: 1) Pipe Bedding: Nu-Pac and Co., $3.00/ton,
2) Crushed Base: Nu-Pac and Co., $3.00/ton, 3) General Excavation: Nu-Pac and Co.,
$50.00/hour, 4) Hot Mix: A-1 Paving, $16.60, 5) Truck Rental: Nu-Pac and Co.,
$34.00/hour, 6 & 7) Uncrushed Sub -base 6" and Uncrushed Sub -base 12": The Public Works
Staff would recommend the low bid of $ .85/ton for 6" and $ .70/ton for 12" be awarded
to Nu-Pac and Co. with concerns.
The concern of the Public Works Staff in relation to 6" and 12" uncrushed sub -base is
based on past experience between the City of Kalispell and Nu-Pac and Co. DPW Hammer
stated that he wants everyone to understand the rejection of materials.
C. Schindler stated the City can reject the material if it does not meet the specifications
and the vendor should bear the expense to remove the material.
C. Gunnerson stated he was in agreement as long as the contract is prepared with this
statement included.
Discussion then took place in regard to definitions of the specifications for 6" Uncrushed
Sub -base.
.i;Sne 1, 1988 PUBLIC WORKS/PUBLIC SAFETY
SEWER AND WATER COMMITTEE MINUTES
Page 2
0
City Attorney Neier stated that if a load is received that is larger than 6", the City
can reject the load and require the contractor to bear the expense.
DPW Hammer stated that the specifications stated only that the City could reject the load.
The specifications did not address who will bear the expense of hauling. He questioned
who would be responsible for returning the load.
C. Schindler pointed out that it costs the City a lot of money to run the loads back to
the pit.
Mr. Lynch stated he couldn't control a few rocks over 8" - 12" being loaded into trucks.
He went on to state that the 6" uncrushed sub -base is not run through a screen. There
is a specified area within the pit where the gravel is larger.
DPW Hammer agreed that not every rock can be controlled, but only as far as 3%. He pointed
out the City has received full truck loads of large rocks.
C. Schindler requested Nu-Pac and Co. to tighten their specifications so the City would
not receive this type of load.
Mr. Lynch stated some oversized rocks are still going to be received. His pit is not
any different for this type of sub -base than any other pit.
C. Schindler questioned whether Nu-Pac could keep the load within 3%. Mr. Lynch responded
yes.
Surveyor Zavodny questioned if the City orders 6" sub -base and the load that arrives is
40 basically all over 6", what happens next? Mr. Lynch stated that if a load arrives that is
all bigger than 6", he will remove the load. Surveyor Zavodny questioned what if the load
is only 50%, 30%, etc., filled with rocks over 6"9 Mr. Lynch stated he is allowed 3%
over the specifications before removing the load.
C. Gunnerson stated the City will adhere to the 3% as long as the specifications are
adhered as well.
DPW Hammer stated that cooperation is all the staff is requesting.
C. Gunnerson stated he was in agreement with DPW Hammer and this can be brought as a
motion to the Council floor and would address the situation in order to obtain cooperation
from both sides. C. Gunnerson asked if there were more questions or comments.
DPW Hammer stated if for some reason the contractor who is awarded the bid could not
furnish materials or trucks, the City would need to go to the next lowest bidder.
City Attorney Neier stated that the right for the City to go to the next lowest bidder
could be accomplished by inclusion in the contract.
Motion: C
vote
C.
to Council to ac
ALARM SYSTEM Police Chief Clark stated he had prepared a memo which states that the Police
Department does not have a problem monitoring the existing alarms in the dispatch office.
The Police Department would prefer that the present "dedicated loop" circuitry be updated
to a total digital alarm system which provides various advantages. There would only be a
cost to the City for the existing City alarms for sewer and water at the sending units.
3µne 1, 1988 PUBLIC WORKS/PUBLIC SAFETY
SEWER AND WATER COMMITTEE MINUTES
Page 3
Motion: C. Schindler moved the Committee recommend to Council the recommendation of
the Police Chief.
• Police Chief Clark stated that the recommendation is from the Police Department and
deferred any legality to City Attorney Neier.
City Attorney Meier stated he did not have a memo prepared at this time, but reiterated
a statement he made in an earlier meeting. He stated the City is assuming some liability
in having the alarms located in the Police Department that the City doesn't have to assume.
C. Gunnerson stated this issue could be brought to the Coundil floor on Monday, June 6,
1988. He then called for a second to the motion made by C. Schindler.
C. Hafferman seconded. The motion carried
in favor upon roll call vote.
FIRST ALLEY WEST FUNDING DPW Hammer presented the Committee with a prepared packet
in regard to Capital Improvement Projects & Funding and a recommendation on the First
Alley West Project. (copy attached) He then stated a brief history from the origination
of the project to date.
DPW Hammer recommends the project be constructed during the budget year of 1988-89, and
possibly borrow the funds or register warrants. In addition, DPW Hammer suggested the
project be constructed in two phases.
A detailed discussion of the available funding and the possibilities of borrowing money
for the First Alley West project took place.
There are contingencies based upon what the Tax Increment Budget will be. The Tax
Increment Budget has to be fixed and then a decision of priorities has to be made before
tying down any funding for the various requested projects, which includes requests by
the Public Works Department, Parking Commission and Police Department.
City Accountant Robertson stated the concern of the First Alley West project is the
Tax Increment money. In order to do the project, a contribution of $448,000 for Tax
Increment must be received. She stated that she will prepare a loan request for a
Cash Anticipation Program the State of Montana has available. There is a low interest
rate of approximately 3%. She stressed that in order to obtain the loan, the City
has to prepare a budget based upon actual collections, not what the county bills out,
and the money has to be paid back by June of 1989. There is no carry forward.
Director Gallagher stated of the Tax Increment funds he will bring the information
gained from the Public Works Committee meeting and meet with the Tax Increment Committee
to reach a recommendation for the Council to review. He stressed that the Tax Increment
Committee is only an advisory committee.
C. Schindler suggested the City install only the sewer at this time.
Mr. Billmayer stated the alley surface is gone, the cost is in the surface replacement.
DPW Hammer stated the original estimate before the decision to go underground was for
$179,000 to replace the sewer.
C. Gunnerson requested City Accountant Robertson to make a recommendation for First
Alley West and funding.
City Accountant Robertson stated she did not have an opinion on the construction or the
need for the project. The financing can be arranged by loan for what would be needed to
borrow, provided the money is paid back in the specified time period.
Jyne 1, 1988 PUBLIC WORKS/PUBLIC SAFETY Page 4
SEWER AND WATER COMMITTEE MINUTES
meet,
• to the
t
on Monday. June
is
hav
Committee
t
WOODLAND SEWER EXTENSION - SCOREBOARD W/S Supt. Hyde presented a memo of recommendation
to award the construction bid of the Woodland Sewer Extension to LHC, Inc., based upon
the engineer's estimate and recommendation. LHC, Inc.'s bid is for $16,866.88. The funds
to pay for the job will come out of the budget for fiscal year 1988-89.
C. G unperson stated his concern for the Scoreboard Bar not owning a portion of their
property. DPW Hammer stated the Scoreboard has lost two of the lots and will only
affect the project by not extending the sewer line as far as was originally planned.
This does not alter the recommendation by the Public Works Staff.
Motion: C. Schindler moved the Committee recommend to Council to award the bid to
ie
in favor upon roll call vote.
SOUTHWEST KALISPELL - GRANT APPLICATION W/S Supt. Hyde stated Thomas, Dean 6 Hoskins
have prepared the application for the EPA Grant portion of the Southwest Kalispell
Sewer Project. W/S Supt. Hyde requested the Committee to recommend to Council to
authorize Mayor Kennedy to sign the Southwest Kalispell Grant Application.
tion:
ant application. C. Gunnerson seconded. The motion carried upon roll call
to wi
•W/S Supt. Hyde stated, for information purposes, there will be a neighborhood meeting for
the Southwest Kalispell project on June 15, 1988, 7:30 P.M., City Hall.
Adjourned: 5:45 P.M.
PW70044. 88
•
P.
`
a
CITY Of
John "Ed" Kennedy, Jr - _ i, tll:ll B// Drc cr 1997
Mayor Kalispell, Monlpnu
59903-1997
DATE: June 1, 1988
TO: Mayor Kennedy & All Council Members
FROM: Ken Hammer, Director of Public Works, and Amy Robertson, City Accountant
SUBJECT: Capital Improvement Projects & Funding
As requested by the City Council, I have prepared a summary of the Capital
Improvement Projects & Funding for your review.
ECT EST. COST = SEWER + WATER + STORM + STREET + TAX INC + CDBG + EPA
1st Alley W. $ 711,042 = $262,500 $448,542
SW Kalispell 968,745 = 43,000 $145,000 $ 47,745 $338,000 $ 395,000
SW Kalispell 63,000 = 28,350 34,650
(In City)
WWTP (Phos) 4,230,000 = 634,500
Streets-Recon. 812,485 =
Maintenance
Woodland Ext. 16,000 = 16,000
217,289 28,000 279,196 288,000
3,595,500
TOTAL $6,801,272 $984,350 $362,289 $28,000 $326,941 $736,542 $338,000 $4,025,150
oI.D. 337; Estimated cost: $354,808; Funds: Sewer - $133,000, Street - $24,161, EPA - $87,647,
Bond - $110,000.
•
n
U
PW-0044-88
Mayor Kennedy & All Council Members
June 1, 1988
Page 2
6/1/88 Cash, operating $ 345,069.12
Cash, R & D 105,810.23
$ 450,879.35
anticipated
June revenue + 62,597.00
June expenses operating'' - 36,759.00
materials - 130,000.00
6/30/88 Cash $ 346,707.00
Crnmitted SW Kalispell - 145,000.00
Cash carryover $ 201,?0?.35
FY 89 Revenue + 751,202.00 fy88 actual
Cperating expenses - 706,238.00 fy88 actual ($975,250)
budget
Amt.Available for other projects $ 246,671.35
or operating reserve.
�• s
6/1/88 Cash, operating
Cash, Capital Improvment
anticipated
June revenue
June expenses
June bond requirement
6/30/88 Cash
Committed for 1st Alley
Cash carryover
FY 89 Revenue
hook up-CIP fund
Operating expenses
bond requirements
Amt. Available for other projects
or operating reserve.
$ 190,735.01
197,404.62
$ 388,139.63
+ 65,314.00
- 51,361.00
- 25,863.00
$ 376,229-.-93
- 200,000.00
$ 176,229.63
+ 800,666.00
t 25,000.00
- 506,339.00 fy88 actual
- 310,356.00
$ 185,200.63 - P),,
($657,753)
budget
PW-0044-88
Maydr Kennedy & All
June 1, 1988
Page 2A
Council Members
6/l/88 cash balance $ 45,786.03
anticipated
June Revenue + 1,000.00
June expenses - 15,000.00
bond transfers - 7,244.89
6/30/88 $ 24,541.14
FY 89 Revenue levied +173,847.26
delinquent 8% (13,900.00)
Budget-100,500.00
debt service - 92,050.00
amt. Available for other projects $ 8,061.60
or operating reserve.
•
PW-0044-88
Mayor Kennedy & All Council Members
June 1, 1988
Page 3
• FIRST ALLEY WEST
Before reviewing the budget and funding for First Alley West, a brief history
of this project is in order. Prior to 1984, the past Director of Public Works felt
that a Sanitary Trunkline should be constructed from the east north area of Kalispell
to the WWTP as an "express route" for the transportation of sewage. A trunkline is
not a collection line. Collection lines collect sewage from specific areas and empty
into the trunkline. The trunkline is the major sewage conveyance line. It is the
pipeline that transports all the collected sewage to the WWTP. (IE: Expressway
vs Alleyway) Prior to the installation of the trunkline in Fifth Ave. W. the collection
system in First Alley West was also functioning as a trunkline. The T.V. inspection
of this line conducted in 1981 revealed that the condition of the sewer line in First
Alley West was deplorable. The potential for failure is quite apparent through
viewing the videotape. If this sewer line failed, the entire East North Area of town
would be backed up with no means to transport the sewage to the Wastewater Treatment
Plant. Numerous structures and basements would be subjected to raw sewage until
repairs could be made. Public Works Director Hammer and staff initiated the construction
of the Sanitary Trunkline along Fifth Avenue West as the means in which to solve the
problem. The trunkline was engineered with adequate capacities and strategic locations
to serve the City well into the future. With this in mind, the sewer line in First
Alley West was abandoned as a trunkline and was only needed to run the sewer from the
buildings along First Alley West to the east -west collection line. It was this sewer
line that created the need for the Sanitary Trunkline and thus the creation of the
project "First Alley West". Initially, the replacement of the sewer line along First
• Alley West was estimated at $179,000. It was at this time that the past City Council
decided that other improvements were needed while the reconstruction of the sewer line
was being considered. Those improvements were replacing the overhead wires and going
underground. This concept has been approved by the past City Council. With all of the
additional improvements, the project has recently been bid at approximately $648,542,
with another $63,000 already paid to the consulting engineer for the design. The total
costs will be approximately $738,542 if there are no change orders. This concludes
the brief history of "First Alley West".
IS THE PROJECT NECESSARY AND DOES THE CITY OF KALISPELL HAVE THE FUNDS AVAILABLE TO
MAKE THE IMPROVEMENTS ALONG FIRST ALLEY WEST? Hopefully, this report will provide
insight as to the Funds available and assist in the decision making process. Is the
project necessary? YES, the sanitary sewer lines must be replaced. The past council
as well as the present council is well aware of the project for going underground
with the overhead wiring. Therefore, it is apparent that the major question is "Does
the City of Kalispell have the Funds", and, if not, "How will this project be financed"?
Does The City Of Kalispell Have Available Funds? If the City has available funds to
proceed with the project, we should award the bid to the low bidder of Brown for $464,000
and proceed with the project. This answer depends upon the priorities of the City
Council in consultation with the City Accountant and Mayor and the 1988-1989 Budget.
If the City of Kalispell does not have all of the necessary funds available at this
time, how do we proceed with the project? We have the following options:
1) The costs for the improvements along First Alley West will never be any lower than
the bid by Brown for $464,000. We could borrow the money.
2) The project could be done in two phases consisting of installation of appurtenances
for underground wiring, with the second phase being completed in the following
budget year.
3) With the low bid of $464,000, it appears that it would be cheaper to borrow the money
at an interest of 10% by doing the project now, rather than to rebid the project the
following year and expect a bid of over $600,000.
�_ rPW-0044-88
Mayor Kennedy & All Council Members
June 1, 1988
Page 4
40 Recommendation: The Director of Public Works would recommend that the project be
constructed during the budget year of 1988-89, and possibly borrowing the funds,
or registering warrants. To attempt to sell bonds would delay the project, and
in essence, probably rebid the project forcing the costs to rise to a predicted
$600,000 plus.
e